Search results for: 'sti'
- Related search terms
- stitching
- stitch
- stitch bonding
- Still
- stic
-
M-5299 AUTOMATIC WOVEN BAG CONVERSION LINE CUTTING-SEWING TYPEREFERENCE NUMBER: M-5299 (131324QND12UF) L AUTOMATIC WOVEN BAG CONVERSION LINE CUTTING-SEWING TYPE AUTOMATIC WOVEN BAG CONVERSION LINE CUTTING-SEWING TYPE MODEL: CS-2HS EQUIPPED WITH TWO SERVO MOTORS & 90° TRANSFER CLIPPER DIMENSIONS (LxWxH): 4850mm x 3880mm x 1180mm WEIGHT: 2800KG QUANTITY AVAILABLE: 1 Learn More -
G-1386 VERTICAL AUTOMATIC FOAMCUTTING MACHINEREFERENCE NUMBER: G-1386 VERTICAL AUTOMATIC FOAMCUTTING MACHINE MODE BF 22 A TECHNICAL DATA: WORKING TABLE ON THE RIGHT OF BLADE 2200mm (86.6") WORKING TABLE ON THE LEFT OF BLADE 2200mm (78.7") WORKING CUTTING LENGTH 2400mm WORKING CUTTING HEIGHT 1300mm (51") QUANTITY AVAILABLE: 1 Learn More -
A-1204 KARL MAYER DOUBLE RASCHEL MACHINEREFERENCE NUMBER: A-1204 (1212GHBXX11) A KARL MAYER DOUBLE RASCHEL MACHINE RD 6 / 3-15 EL RD 6 / 3-15 EL RASCHEL MACHINE FOR THE PRODUCTION OF WARP-KNITTED SPACER FABRIC MAX. WORKING WIDTH: 3505 MM (138 INCHES) KAMCOS (KARL MAYER COMMAND SYSTEM) QUANTITY AVAILABLE: 1 Learn More -
THIES AIR STREAM HT DYEING MACHINES – 2 AND 4 ROPES – YEAR 1998THIES AIR STREAM 2 ROPES HT 140 °C 2 x ROPE DYEING MACHINE THIES AIR STREAM 4 ROPES HT 140 °C 3 x ROPE DYEING MACHINE Learn More -
M-5072 SULZER P7250 & P7200 PROJECTILE WEAVING MACHINES FOR TERRY, YEAR 1999 TO 2001M-5072 SULZER P7250 & P7200 PROJECTILE WEAVING MACHINES FOR TERRY, YEAR 1999 TO 2001
OFFER 001
SULZER P7250 F4 SPE D1
PROJECTILE WEAVING MACHINES FOR TERRY
YEAR: 2001
EQUIPPED FOR 2 WIDTH WEAVING FROM 2 HALF BEAMS OF WARP
AND 2 HALF BEAMS OF WEFT
EACH MACHINE HAS ONE FULL SET OF SPARE BEAMS (2 FOR WARP AND 2 FOR WEFT)
ALL MACHINES COMPLETE WITH 3 IRO EACH LOOM
ALL MACHINES ARE STILL RUNNING
AND IN EXCELLENT CONDITIONQUANTITY: 2
OFFERR 002
SULZER P7200 F4 SPED1
PROJECTILE WEAVING MACHINES FOR TERRY
YEAR: 1999
WIDTH: 3630mm
EQUIPPED FOR 2 WIDTH WEAVING FROM 2 HALF BEAMS OF WARP
AND 2 HALF BEAMS OF WEFT
EACH MACHINE HAS ONE FULL SET OF SPARE BEAMS (2 FOR WARP AND 2 FOR WEFT)
ALL MACHINES COMPLETE WITH 3 IRO EACH LOOM
ALL MACHINES ARE STILL RUNNING
AND IN EXCELLENT CONDITIONQUANTITY: 4
Learn More -
M-4835 POWER AND INDUSTRIAL PLANTS FOR SALEREFERENCE NUMBER: M-4835 (1111VEHJXX10) L POWER AND INDUSTRIAL PLANTS FOR SALE QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 230 COMBINED CYCLE GAS TURBINE POWER PLANT SIEMENS V94-2 1988 1 220 COMBINED CYCLE POWER PLANT 50 HZ, FUEL: DUAL FUEL (NATURAL GAS OR HFO/DIESEL) GE FRAME 6B CCPP 1992, RUNNING HOURS: 135 000, PREUSED 1 180 GAS TURBINE 125 MW, STEAM TURBINE 55 MW, 50 HZ, FUEL LFO AND NG GE FRAME 9E CCPP 2005, RUNNING HOURS: 2000 2 128 COMPLETE POWER PLANTS, 15 KV, FUEL: NATURAL GAS AND LIGHT OIL GE FRAME PG9171E NEW 2 127 GAS TURBINE PACKAGES FIAT AVIO MODEL TG 50 – D5 1998,DISMANTLED, OVERHAULED, UPGRADED FROM SIEMENS AND DISMANTLED 2 125 COMPLETE PLANT, 2 UNITS ABB GAS TURBINE PACKAGES, FUEL: DUAL FUEL, 50 HZ ABB, 50WT 18H-66 1995, JUST OVERHAULED, WARRANTY POSSIBLE 1 93 COMBINED CYCLE POWER PLANT. FUEL : NATURAL GAS GE FRAME 6FA 1997 MAJOR INSPECTION IN 2009 1 73 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. SIEMENS WESTINGHOUSE AND MITSUBISHI. 1999, RUNNING HOURS 97 000 1 70 COMBINED CYCLE POWER PLANT THOMASSEN/ABB 2009, RUNNING HOURS UNDER 90 000 CONDITION GOOD, 2009 OVERHAULED 5 66 GAS TURBINE PACKAGES, 50 OR 60 HZ ROLLS ROYCE, TRENT 60 2014, RUNNING HOURS ZERO 3 49 GAS TURBINE POWER PLANT, 50 HZ 3 UNITS GE LM 6000 PC 2004, RUNNING HOURS 6000 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 46 COMPLETE PLANT, INCLUDES 5 GAS TURBINE PACKAGES, INCLUDING 1 STEAM TURBINE, BOILER AND AUXILIARIES. FUEL: NATURAL GAS AND NAPHTA. 50 HZ. SIEMENS TYPHOON AND ALSTOM. 2000, LOW HOURS, STILL IN OPERATION 1 42 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. GE LM 6000PA 1997, LAST HOT END OVERHAUL WAS AT 86.080 HOURS IN AUG 2010 1 41 GAS TURBINE PACKAGE WITH HRSG, 50HZ FUEL: NATURAL GAS/FUEL OIL THOMASSEN PG-6541 1995, LAST OVERHAUL AT 118350 1 40 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS AND LIGHT OIL. 50 HZ. GE FRAME 6 B, DRY LOW NOX 1992, RECENTLY OVERHAULED, STILL GOOD FOR MORE THAN 24.000 RUNNING HOURS. READY TO SHIP. 5 37 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ SGT 750 SIEMENS NEW, ZERO HOURS 1 31,2 GAS TURBINE PACKAGES, 31,2 MW , 50/60 HZ, SGT 700 NEW, ZERO HOURS 5 31 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ GE TM2500 NEW 1 29,65 GAS TURBINE GENERATOR, 50 HZ, 11 KV SGT 700 2011, RUNNING HOURS ZERO (NEW) 1 27 COMBINED CYLE POWER PLANT, 27 MW, NATURAL GAS GE RLM 2500 PE AND ALSTOM STEAM TURBINE GAS TURBINE 1994, STEAM TURBINE 1996 1 26,59 GAS TURBINE, FUEL: GAS FRAME 5, PG-5371 PA 1995, RUNNING HOURS 174,104 4 24,6 CORE ENGINE FUEL: NATURAL GAS, 50 HZ SIEMENS SGT 600 (EX ABB GT 10B) 1994-1997, ZERO HOUR OVERHAULED 1 16 GAS TURBINE PACKAGE DUEAL FUEL ROLLS ROYCE AVON 1534-102L ZERO HOUR OVERHAULED IN 2008 1 14,25 NATURAL GAS ENGINE SOLAR TITAN 130 SOLONOX, 50 HZ TURBOMACH T19501 2007, ZERO RUNNING HOURS, AS NEW 3 12,9 GAS TURBINES SIEMENS, 60 HZ SIEMENS SGT 400 2014, NEW NEVER USED 1 11,86 GAS TURBINE, 60 HZ SOLAR MARS 100 15000 SOLONOX 1996, RUNNING HOURS 34 000 SINCE LAST OVERHAUL 2 9,2 CHP PLANT ELECTRIC, NATURAL GAS AND LIGHT DIESEL&BOTH SOLAR CENTAUR 50 T5701 2005 AND 2008, RUNNING HOURS 26 000 AND 2 500 1 8,8 COMBINED CYCLE GAS TURBINE POWER PLANT. 60 HZ. SOLAR MARS 90. 1989, LAST MAJOR OVERHAUL IN 2004, ONLY 1225 RUNNING HOURS 1 7,5 NATURAL GAS ENGINE SOLAR TAURUS T70, 50 HZ TURBOMACH SOLONOX + WHRB 2007, ZERO RUNNING HOURS AS NEW 1 5,5 GAS TURBINE, 50 HZ, NATURAL GAS SGT 200 1989, RUNNING HOURS 126 340 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 5,2 DUAL NATURAL GAS AND OIL ENGINE TAURUS 60, 50 HZ SOLAR TAURUS 60, SOLONOX T7301 1998, RUNNING HOURS17 700 1 1,4 GAS TURBINE PACKAGE INCL. HRSG, 50 HZ KAWASAKI KA 1334 1995, RUNNING HOURS AFTER MAJOR OVERHAUL 4000 Learn More -
TT-8600 SIEMENS ENERGY SGT-A05 KB7HE UNITS – NEW, 5.8 MW, YEAR 2025, 50/60HzTT-8600 SIEMENS ENERGY SGT-A05 KB7HE UNITS – NEW, 5.8 MW, YEAR 2025, 50/60Hz QUANTITY: 4 Learn More -
TT-8612 SIEMENS STEAM TURBINE SST400 – NEW, 30MW, YEAR 2011TT-8612 SIEMENS STEAM TURBINE SST400 – NEW, 30MW, YEAR 2011 1. SIEMENS STEAM TURBINE SST400 2. POWER: 30MW 3. VOLTAGE: 10.5KV/50Hz 4. HOURS: ZERO Learn More -
TT-8593 GE TM2500GEN08 MOBILE GAS TURBINE GENERATOR, 10.5KV, YEAR 2025TT-8593 GE TM2500GEN08 MOBILE GAS TURBINE GENERATOR, 10.5KV, YEAR 2025 1. GE TM2500GEN08 2. YEAR: JUNE 2025 3. 10.5KV 4. DUAL FREQUENCY 5. DUAL FUEL 6. DRY LOW EMISSION 7. HOURS: 0 8. WARRANTY: ONE YEAR QUANTITY: 1 Learn More -
TT-8568 MS JPK DIGITAL PRINTING MACHINE, WIDTH 3200mm, YEAR 2019TT-8568 MS JPK DIGITAL PRINTING MACHINE, WIDTH 3200mm, YEAR 2019 QUANTITY: 1 Learn More