Search results for: 'gas turb'
-
TT-8106 GE LM2500G4, DLE, 2ND, 33.372MW, YEAR 2018, 50HzTT-8106 GE LM2500G4, DLE, 2ND, 33.372MW, YEAR 2018, 50Hz 1. GE LM2500G4, DLE 2. 2ND 3. YEAR: 2018 4. VOLTAGE: 10.5KV QUANTITY: 1 Learn More -
TT-7585 SIEMENS SST-300 STEAM TURBINE - NEW, YEAR 2021, 50 HzTT-7585 SIEMENS SST-300 STEAM TURBINE - NEW, YEAR 2021, 50 Hz 1. BRAND NEW STEAM TURBINE SIEMENS SST-300 - IN FACTORY 2. PACKING FROM THE YEAR 2021 3. THIS TURBINE HAS NEVER BEEN INSTALLED AND AVAILABLE 4. WITH ALL ITS EQUIPMENT AND ACCESSORIES 5. STORED IN WAREHOUSE SECURELY, IN GOOD ENVIRONMENT. Learn More -
YY-3526 SOLAR TURBINES TITAN 130, VERSION 20501 AXIYY-3526 SOLAR TURBINES TITAN 130, VERSION 20501 AXI THIS PROPOSAL OUTLINES THE SUPPLY OF A SOLAR TURBINES TITAN 130 GAS TURBINE WITH APPROXIMATELY 8.000 OPERATING HOURS. THE UNIT IS LAND-BASED, CONVENTIONAL (NON-SOLONOX), AND DOES NOT REQUIRE OVERHAULING DUE TO ITS LOW OPERATING HOURS. THE PACKAGE INCLUDES DELIVERY TO THE NEAREST SEAPORT, WITH A 60-DAY GUARANTEE AFTER STARTUP. NOT INCLUDED: - INSTALLATION & COMMISSIONING - SPARE PARTS - AUXILIARY SYSTEMS (IF REQUIRED) QUANTITY: 1 Learn More -
TT-6503 COMPLETE GE LM2500, 23MW, 13.8KV, 60Hz, YEAR 1990TT-6503 COMPLETE GE LM2500, 23MW, 13.8KV, 60Hz, YEAR 1990 WELL MAINTAINED GOVERNMENT FACILITY. YEAR 1990 OPERATED AS STANDBY (UTILITY BLACK START) WITH ANNUAL HOURS OF LESS THAN 1200 HOURS PER YEAR. LAST RUN IN 2020. THESE UNITS ARE CURRENTLY CONFIGURED FOR DIESEL FUEL OPERATION. WE CAN CONVERT TO NATURAL GAS FOR AN ADDITIONAL FEE AND APPROXIMATELY 14 WEEKS LEAD TIME. DETAILED INSPECTION AND FAIR MARKET VALUE ASSESSMENT (FINANCE CREDIT WORTHY) HAVE BEEN COMPLETED WITHIN THE LAST 6 MONTHS. Learn More -
YY-3300 NEW MAN 9 MW GAS GENERATOR SETS, QUANTITY 4 – 9 MW PER UNITYY-3300 NEW MAN 9 MW GAS GENERATOR SETS, QUANTITY 4 – 9 MW PER UNIT SINGLE 9 MW UNIT PURCHASE IS POSSIBLE. MANUFACTURER: MAN DIESEL & TURBO TYPE: 18V32/40 – 4 STROKE CONDITION: NEW, UNUSED MANUFACTURED IN: GERMANY MAXIMUM OUTPUT: 36 MW QUANTITY: 4 Learn More -
TT-6648 NATURAL GAS COGENERATION PLANT, 40 MEGAWATTSTT-6648 NATURAL GAS COGENERATION PLANT, 40 MEGAWATTS Learn More -
TT-1818 SIEMENS COMBINED CYCLE COMPLETE POWER PLANT, 420 MW, YEAR 2009 TO 2010TT-1818 SIEMENS COMBINED CYCLE COMPLETE POWER PLANT, 420 MW, YEAR 2009 TO 2010 SIEMENS ELECTRIC YEAR 2009 TO 2010 COMBINED CYCLE COMPLETE POWER PLANT 420 MW COMBINED CYCLE PLANT USED IMMEDIATE DELIVERY Learn More -
YY-3186 82MW (ROLLS ROYCE TRENT 60 +SST600) CCPP FOR SALE (50Hz)YY-3186 82MW (ROLLS ROYCE TRENT 60 +SST600) CCPP FOR SALE (50Hz) AN UNUSED 82MW ISO RATED COMBINED CYCLE POWER PLANT. THE PLANT’S MAIN EQUIPMENT IS COMPOSED OF A ROLLS ROYCE TRENT 60 DLE GAS TURBINE (ALSO KNOWN AS THE SGT-A65), A NOOTER/ERIKSEN HRSG, AND A SIEMENS SST-300 STEAM TURBINE. QUANTITY: 1 Learn More -
TT-7760 GE MODEL 7EA 62,480 KW BASE RATED, 80,000 KW ISO RATED, COMBUSTION TURBINE GENERATOR SET, 60 Hz, YEAR 2007TT-7760 GE MODEL 7EA 62,480 KW BASE RATED, 80,000 KW ISO RATED, COMBUSTION TURBINE GENERATOR SET, 60 Hz, YEAR 2007 SCOPE OF SUPPLY 1. HP/LP STEAM DRUMS 2. HEAT TRANSFORMER MODULES 3. DEAERATOR SYSTEM 4. DUCT BURNER SYSTEM 5. ISOLATION, VENT & DRAIN VALVES 6. HP/LP FLOW ELEMENTS 7. LADDERS AND WALKWAYS 8. FIELD ASSEMBLY FITTINGS 9. EXCLUDED 10. EMISSIONS CONTROL 11. BOILER FEED WATER PUMP 12. EXHAUST STACK 13. TRANSITION DUCTS QUANTITY: 1 Learn More -
TT-4060-B GENERAL ELECTRIC LM2500 SAC COMPLETE POWER PLANT, 22MW, YEAR 2022, 5000 HOURS, 50HzTT-4060-B GENERAL ELECTRIC LM2500 SAC COMPLETE POWER PLANT, 22MW, YEAR 2022, 5000 HOURS, 50Hz WE OFFER TWO TURBINES AND GENERATOR ALONE OR THE TURBINE ALONE, GENERATION 2 QUANTITY: 2 Learn More