YY-3559 13 MW SIEMENS SGT-400 NATURAL GAS TURBINE GENSET 22 PICES 2022 NEW – UNUSED
DETAILS:
1. MANUFACTURER SIEMENS
2. MODEL SGT-400
3. YEAR 2022
4. CONDITION NEW
5. CATEGORY NATURAL GAS TURBINES
6. SUBCATEGORIES 10 - 99 MW
7. WATTAGE 13 MW
8. HOURS ZERO
9. FREQUENCY 50 Hz
10. FUEL TYPE NATURAL GAS
11. VOLTAGE 230 V
12. SIZE (L X W X H) 14.0 X 3.1 X 4.3 M
13. WEIGHT APPROX. 84 TON Learn More
YY-3558 13 MW SIEMENS SGT-400 NATURAL GAS TURBINE GENSET 12 PICES 2022 NEW UNUSED
DETAILS:
1. MANUFACTURER SIEMENS
2. MODEL SGT-400
3. YEAR 2022
4. CONDITION NEW
5. CATEGORY NATURAL GAS TURBINES
6. SUBCATEGORIES 10 - 99 MW
7. WATTAGE 13 MW
8. HOURS ZERO
9. FREQUENCY 50 Hz
10. FUEL TYPE NATURAL GAS
11. VOLTAGE 230 V
12. SIZE (L X W X H) 14.0 X 3.1 X 4.3 M
13. WEIGHT APPROX. 84 TON
Learn More
YY-3279 SGT – 600 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOM
UNIT(S) TO BE SUPPLIED ARE UNUSED, WITH ZERO RUNNING HOURS, NEVER INSTALLED.
Learn More
J-5082 7 SIEMENS SGT 800 UNITS, TOTALING 400 MW, 60 Hz – PACKAGE DEAL ONLY
TOTAL: 400 MEGAWATTS
MAKE: SIEMENS
MODEL: SGT 800
TOTALLING 400 MW @ 60 Hz
6 UNITS ARE HRSG UNITS
1 UNIT 64 MW @ 60 Hz
EX STOCK
THESE ARE BRAND NEW UNITS, WARRANTY TRANSFERRABLE
MUST BE SOLD AS A PACKAGE ONLY, NOT AVAILABLE INDIVIDUALLY
PACKAGE IS COMPLETE WITH CONTROL SYSTEMS, ETC.
QUANTITY: 7
Learn More
YY-3186 82MW (ROLLS ROYCE TRENT 60 +SST600) CCPP FOR SALE (50Hz)
AN UNUSED 82MW ISO RATED COMBINED CYCLE POWER PLANT. THE PLANT’S MAIN EQUIPMENT IS COMPOSED OF A ROLLS ROYCE TRENT 60 DLE GAS TURBINE (ALSO KNOWN AS THE SGT-A65), A NOOTER/ERIKSEN HRSG, AND A SIEMENS SST-300 STEAM TURBINE.
QUANTITY: 1 Learn More
TT-3707 SGT600 OPEN CYCLE GENERATOR SET, 25 MW OUTPUT, 50Hz, YEAR 2002, DUAL FUEL
SGT600 OPEN CYCLE GENERATOR SET
USED
25 MW OUTPUT
50Hz OPERATION
QUANTITY: 1
Learn More
TT-6239 SIEMENS SGT 600 TURBINE, DLE, YEAR 2011, 25 MW, 10.5 KV, 50 Hz
MAINTENANCE RECORD:
A-THE MAINTENANCE MAINLY INVOLVES PASSING HOT AIR FROM THE DRYER TO THE COMBUSTION CHAMBER. WE HAVE PREVIOUSLY TRIED TURNING THE DRYER. DESICCANT IS PLACED INSIDE THE STEAM DRUM OF THE WASTE HEAT BOILER.
B-THE LAST RUN WAS IN DECEMBER 2017, AND IT WAS STARTED EVERY THREE MONTHS FOR ABOUT A YEAR. FINALLY, WE COMMUNICATED WITH SIEMENS TO ADOPT A LONG-TERM MAINTENANCE METHOD, SO WE DID NOT ATTEMPT TO IGNITE AGAIN.
IMMEDIATE DELIVERY
Learn More