Search results for: 'gas comp'
- YY-3149 420 MW COMBINED CYCLE POWER PLANTYY-3149 420 MW COMBINED CYCLE POWER PLANT 1 NO. - 420 MW SIEMENS ELECTRIC (2009/10), COMBINED CYCLE COMPLETE POWER PLANT, HAVING THE FOLLOWING TECHNICAL SPECIFICATIONS: Learn More
- TT-4140 BRUCKNER TWO PASS VERTICAL INFRARED FABRIC DRYER, WIDTH 2100mm, YEAR 1995TT-4140 BRUCKNER TWO PASS VERTICAL INFRARED FABRIC DRYER, WIDTH 2100mm, YEAR 1995 BRUCKNER INFRARED UNIT TYPE IR-TROCKNER YEAR 1995 WIDTH: 2100mm IMMEDIATE DELIVERY QUANTITY: 1 Learn More
- TT-3982 GENERAL ELECTRIC PG9171E, 39,900 HOURS, YEAR 2008TT-3982 GENERAL ELECTRIC PG9171E, 39,900 HOURS, YEAR 2008 QUANTITY: 1 Learn More
- TT-3851 TITAN T250 SOLAR TURBINES, NATURAL GAS TURBINE, 22.37 MW, YEAR 2017TT-3851 TITAN T250 SOLAR TURBINES, NATURAL GAS TURBINE, 22.37 MW, YEAR 2017 22.37 MW NEW / NEVER-USED 30,000 HP SOLAR TURBINES TITAN 250 PACKAGE IS A RARE SURPLUS OPPORTUNITY AND OFFERS EXCELLENT ECONOMICS TO A SELECT BUYER. QUANTITY: 1 Learn More
- TT-3325 RESINATED & THERMOBONDED AIR LAID SHODDY FELT PRODUCTION LINE, WORKING WIDTH 2200mmTT-3325 RESINATED & THERMOBONDED AIR LAID SHODDY FELT PRODUCTION LINE, WORKING WIDTH 2200mm FLOOR MIXING CONVEYOR BELT BALE BREAKER 1500mm WIDTH POWDER DOSIFIER FOR RESINATING FIBER IN LINE DUCT MIXING SYSTEM QUANTITY: 1 Learn More
- TT-3267 GENERAL ELECTRIC / AEG-KANIS PG 5341 GAS TURBINE, 50Hz, YEAR 1982TT-3267 GENERAL ELECTRIC / AEG-KANIS PG 5341 GAS TURBINE, 50Hz, YEAR 1982 YEAR OF CONSTRUCTION 1982 CONDITION USED MACHINE TYPE: GAS TURBINE MANUFACTURER: GE / GENERAL ELECTRIC / AEG-KANIS MODEL: PG 5341 “P” YEAR OF CONSTRUCTION: 1982 CONDITION: EXCELLENT (USED) UPDATE: 12.09.2023 RATED POWER: 25MW (EL) EXHAUST GAS TEMPERATURE: 486°C FUEL: FUEL OIL, DIESEL TOTAL RATED THERMAL INPUT: 88,9 MW FREQUENCY: 50Hz SCOPE OF SUPPLY: COMPLETE PLANT WITH 4X: TURBINE-GEARBOX-GENERATOR AND AUXILIARIES Learn More
- TT-2884 SAND WASHING TROMMEL WASH PLANT ON PORTABLE TRAILER, 20” X 10’TT-2884 SAND WASHING TROMMEL WASH PLANT ON PORTABLE TRAILER, 20” X 10’ QUANTITY: 1 Learn More
- TT-2795 LM2500 CORE ENGINES, 22.5 MW WITH 649 TO 2320 HOURSTT-2795 LM2500 CORE ENGINES, 22.5 MW WITH 649 TO 2320 HOURS QUANTITY: 2 Learn More
- TT-2274 FIBRE EXTRUSION TECHNOLOGIES LIMITED FET-100 SERIES PILOT MELT SPINNING SYSTEM, YEAR 2020TT-2274 FIBRE EXTRUSION TECHNOLOGIES LIMITED FET-100 SERIES PILOT MELT SPINNING SYSTEM, YEAR 2020 FIBRE EXTRUSION TECHNOLOGIES LIMITED FET-100 SERIES PILOT MELT SPINNING SYSTEM FOR CONTINUOUS FILAMENT YARN APPLICATIONS (MULTIFILAMENT) YEAR 2020 AVAILABLE FOR IMMEDIATE SALE QUANTITY: 1 Learn More
- TT-1952 KAWASAKI GAS TURBINE GENERATOR, 5570KW, 60Hz, YEAR 2002TT-1952 KAWASAKI GAS TURBINE GENERATOR, 5570KW, 60Hz, YEAR 2002 QUANTITY: 1 Learn More