Search results for: 'Packa'
- Related search terms
- packagin
- packaging
- package damaged in transit
- Packaging Source
- packaging center
-
TT-5668 P&W FT8-2 PACKAGE, 26MW, 60Hz, NATURAL GAS, YEAR 2007TT-5668 P&W FT8-2 PACKAGE, 26MW, 60Hz, NATURAL GAS, YEAR 2007 P&W FT8-2 PACKAGE, 26MW NATURAL GAS, 60Hz DRY LOW NOX QUANTITY: 1 Learn More -
TT-5497 CAPSTONE C1000S MICRO TURBINE GENERATOR PACKAGE, 1 MW, YEAR 2023TT-5497 CAPSTONE C1000S MICRO TURBINE GENERATOR PACKAGE, 1 MW, YEAR 2023 CAPSTONE C1000S MICRO TURBINE GENERATOR PACKAGE 1 MW CAPACITY 1000 KW UNUSED QUANTITY: 1 Learn More -
TT-5219 GE 9HA GAS TURBINE PACKAGE – NEW, 373 MW, 50Hz, YEAR 2015, DUAL FUELTT-5219 GE 9HA GAS TURBINE PACKAGE – NEW, 373 MW, 50Hz, YEAR 2015, DUAL FUEL BRAND: GE TURBINES MODEL: 9HA.01 NEW/UNUSED DUAL FUEL CONDITION: NEW YEAR: 2015 Learn More -
TT-4992 GENERAL ELECTRIC 7EA GTG PACKAGED POWER PLANT, 60 Hz, YEAR 2014TT-4992 GENERAL ELECTRIC 7EA GTG PACKAGED POWER PLANT, 60 Hz, YEAR 2014 GENERAL ELECTRIC 7EA GTG PACKAGED POWER PLANT YEAR: 2014 CONDITION DETAILS: NEVER USED OPERATIONAL STATUS: DISCONNECTED QUANTITY: 1 Learn More -
TT-4769 SCHRAMM TXD 200 DRILL RIG & PACKAGE OF SUPPORT EQUIPMENT, YEAR 2017TT-4769 SCHRAMM TXD 200 DRILL RIG & PACKAGE OF SUPPORT EQUIPMENT, YEAR 2017 SCHRAMM TXD 200 DRILL RIG & PACKAGE OF SUPPORT EQUIPMENT CONDITION USED YEAR 2017 QUANTITY: 1 Learn More -
TT-4767 SCHRAMM T130XD DRILL RIG & PACKAGE OF SUPPORT, YEAR 2007TT-4767 SCHRAMM T130XD DRILL RIG & PACKAGE OF SUPPORT, YEAR 2007 SCHRAMM T130XD DRILL RIG & PACKAGE OF SUPPORT EQUIPMENT YEAR 2007 CONDITION USED QUANTITY: 1 Learn More -
YY-2985 COMPLETE AND UNUSED SGT-400 50Hz GAS TURBINE DRIVEN GENERATOR PACKAGESYY-2985 COMPLETE AND UNUSED SGT-400 50Hz GAS TURBINE DRIVEN GENERATOR PACKAGES THE SIEMENS SGT-400 FAST POWER GAS TURBINE GENERATOR SET IS A SYSTEM DESIGNED FOR RAPID DEPLOYMENT. QUANTITY: 5 Learn More -
TT-3480 MATTHYS ROLL PACKAGING LINE, WORKING WIDTH 6700mm, YEAR 2018TT-3480 MATTHYS ROLL PACKAGING LINE, WORKING WIDTH 6700mm, YEAR 2018 QUANTITY: 1 Learn More -
YY-2389 KERLIX BANDAGE PACKAGING MACHINE, WORKING FREQUENCY 6 TO 10 CUT PER MINYY-2389 KERLIX BANDAGE PACKAGING MACHINE, WORKING FREQUENCY 6 TO 10 CUT PER MIN QUANTITY: 1 Learn More -
YY-2311 GE TM2500+ GENERATION 6 GENERATOR PACKAGE – 26 MW EACH, 11,000 V, 50/60 Hz, DIESEL OR NATURAL GAS, YEAR 2011YY-2311 GE TM2500+ GENERATION 6 GENERATOR PACKAGE – 26 MW EACH, 11,000 V, 50/60 Hz, DIESEL OR NATURAL GAS, YEAR 2011 -AT 50 Hz THE UNITS ARE DESIGNED TO PRODUCE 26 MW OF POWER -AT 60 Hz THE UNITS ARE DESIGNED TO PRODUCE 30 MW OF POWER -DEPENDING ON LOCATION TEMPERATURE -THESE ARE CONTINUOUS POWER UNITS DETAILS: 1. 31MW CONTINUOUS RATED (GE ADVERTISED AT ISO CONDITIONS); 2. YEAR OF MANUFACTURE: 2011; 3. PACKAGE SN: 2011-TM006 AND 2011-TM008; 4. CURRENTLY CONFIGURED AS 11KV 50HZ, YET CAN OPERATE AT EITHER 50HZ OR 60HZ; 5. 2 UNITS AVAILABLE; 6. EQUIPMENT IS CONFIGURED TO OPERATE ON LIQUID FUEL OR NATURAL GAS; 7. CURRENT OPERATING HOURS AS OF JULY 30, 2022: TM006 – 1726 HOURS TM008 – 2174 HOURS; 8. HOURS REFLECT TOTAL TIME SINCE NEW: HOURS MAY GO UP AS UNITS ARE STILL CONNECTED FOR EMERGENCY USE ONLY. 9. PRICE INCLUDES THE GT1 REPAIRS RECOMMENDED BY GE IN THE ATTACHED INVESTIGATIVE REPORT; 10. HPT REPLACEMENT ON GT1 ONLY: - LEAD TIME FOR REPAIRS IS 12-14 WEEKS BASED ON CURRENT AVAILABILITY (SUBJECT TO CHANGE); - SCOPE OF SUPPLY FOR EACH UNIT IS LISTED IN APPENDIX A. Learn More