Search results for: 'SIEMENS GAS TURBINE s'
- TT-8276 SIEMENS SGT-800 TURBINES, 220 MW, YEAR 2025, 50/60 Hz (55MW each unit x 4) - NEWTT-8276 SIEMENS SGT-800 TURBINES, 220 MW, YEAR 2025, 50/60 Hz (55MW each unit x 4) - NEW 1. POWER GENERATION 220 MW 2. DUAL FUEL (NATURAL GAS / DIESEL) 3. DUAL FREQUENCY (60 Hz/ 50Hz) 4. SIEMENS SGT-800 TURBINES 5. YEAR OF MANUFACTURE: 2025 QUANTITY: 4 UNITS Learn More
- TT-8039 SIEMENS SST-400 30MW STEAM TURBINE+38MW GENERATOR FOR POWER PLANT, YEAR 2011TT-8039 SIEMENS SST-400 30MW STEAM TURBINE+38MW GENERATOR FOR POWER PLANT, YEAR 2011 1. SIEMENS SST-400 30MW STEAM TURBINE+38MW GENERATOR FOR POWER PLANT 2. BRAND: SIEMENS 3. MODEL: SST400 4. TYPE: STEAM TURBINES 5. CONDITION: NEW QUANTITY: 1 Learn More
- TT-6523 SIEMENS SST-400 STEAM TURBINE - NEW, YEAR 2011TT-6523 SIEMENS SST-400 STEAM TURBINE - NEW, YEAR 2011 1. BRAND: SIEMENS TURBINES 2. MODEL: SIEMENS SST400 3. CONDITION: NEW QUANTITY: 1 Learn More
- K-2539 SIEMENS COMPLETE POWER PLANT 180MW YEAR 2001
K-2539 SIEMENS COMPLETE POWER PLANT 180MW YEAR 2001
MAKE: SIEMENS
2 UNITS V 64.3 SIEMENS GAS TURBINES AND STEAM TURBINE
2 BOILERS AND AUXILIARIES
NATURAL GAS AND LFO
50 HZQUANTITY: 1
Learn More - YY-2425 LM2500 PE SAC, 22.4 MW, WITH GE 6 STAGE POWER TURBINE, GAS TURBINES, QUANTITY 2YY-2425 LM2500 PE SAC, 22.4 MW, WITH GE 6 STAGE POWER TURBINE, GAS TURBINES, QUANTITY 2 ITEM 001 2500 HOURS AFTER ENGINE OVERHAUL ITEM 002 6500 HOURS AFTER ENGINE OVERHAUL Learn More
- TT-7348 SIEMENS SST-400 STEAM TURBINE GENERATOR PACKAGE - NEW, 24.5 MW, YEAR 2014, 50 HzTT-7348 SIEMENS SST-400 STEAM TURBINE GENERATOR PACKAGE - NEW, 24.5 MW, YEAR 2014, 50 Hz 1. SIEMENS SST-400 STEAM TURBINE GENERATOR PACKAGE 2. BRAND SIEMENS 3. MODEL SST400 4. TYPE GAS TURBINES QUANTITY: 1 Learn More
- TT-6830 SIEMENS/RENTECH CONDENSING STEAM TURBINE-GENERATOR PACKAGE, 24.5MW, UNUSED, YEAR 2013 TO 2014, 50 HzTT-6830 SIEMENS/RENTECH CONDENSING STEAM TURBINE-GENERATOR PACKAGE, 24.5MW, UNUSED, YEAR 2013 TO 2014, 50 Hz ALREADY DISMANTLED THE PACKAGE AND CAN MAKE IT AVAILABLE FOR DELIVERY IN 2 WEEKS Learn More
- TT-6725 SIEMENS SGTA05 KB7HE, 5.7MW EACH, YEAR 2020, 60HzTT-6725 SIEMENS SGTA05 KB7HE, 5.7MW EACH, YEAR 2020, 60Hz 1. SIEMENS SGTA05 KB7HE 2. MOBILE PACKAGE 3. YEAR OF MANUFACTURE 2020 QUANTITY: 2 Learn More
- TT-6239 SIEMENS SGT 600 TURBINE, DLE, YEAR 2011, 25 MW, 10.5 KV, 50 HzTT-6239 SIEMENS SGT 600 TURBINE, DLE, YEAR 2011, 25 MW, 10.5 KV, 50 Hz MAINTENANCE RECORD: A-THE MAINTENANCE MAINLY INVOLVES PASSING HOT AIR FROM THE DRYER TO THE COMBUSTION CHAMBER. WE HAVE PREVIOUSLY TRIED TURNING THE DRYER. DESICCANT IS PLACED INSIDE THE STEAM DRUM OF THE WASTE HEAT BOILER. B-THE LAST RUN WAS IN DECEMBER 2017, AND IT WAS STARTED EVERY THREE MONTHS FOR ABOUT A YEAR. FINALLY, WE COMMUNICATED WITH SIEMENS TO ADOPT A LONG-TERM MAINTENANCE METHOD, SO WE DID NOT ATTEMPT TO IGNITE AGAIN. IMMEDIATE DELIVERY Learn More
- TT-5576 SIEMENS SIMPLE CYCLE-SGT-800, 47.5MW, 13.8KV, DF, 60Hz OR 50Hz, BOP(PIX), YEAR 2013TT-5576 SIEMENS SIMPLE CYCLE-SGT-800, 47.5MW, 13.8KV, DF, 60Hz OR 50Hz, BOP(PIX), YEAR 2013 SIEMENS SIMPLE CYCLE-SGT-800 47.5MW BOP(PIX) QUANTITY: 3 Learn More