Search results for: 'Turbi'
- Related search terms
- Turbine 13”
- turbine T
- turbine genera
- turbin plant
- turbine 10
-
TT-7052 ELLIOT STEAM TURBINES W/ HYUNDAI-IDEAL ELECTRIC GENERATOR SET, YEAR 2016, 60 Hz, 6.5 MW, 6600 VOLTSTT-7052 ELLIOT STEAM TURBINES W/ HYUNDAI-IDEAL ELECTRIC GENERATOR SET, YEAR 2016, 60 Hz, 6.5 MW, 6600 VOLTS ITEM 001 1. STEAM TURBINE "ELLIOT" WITH GENERATOR SET "HYUNDAI-IDEAL ELECTRIC" 2. BRAND: ELLIOT-HYUNDAI-IDEAL ELECTRIC 3. MODEL: 2 DYR6 ITEM 002 1. MULTI-STAGE STEAM TURBINE “ ELLIOTT”. 2. MODEL 2DYR6 3. YEAR 2016 ITEM 003 1. BRUSHLESS SYNCHRONOUS GENERATOR “HYUNDAI-IDEAL ELECTRIC” 2. OUTPUT 6.595 KW-4P- 6600 VOLT; 60 Hz 3. WEIGHT 20,000 KG 4. WITH START-UP AND 2 YEAR SPARE PARTS Learn More -
TT-6997 ELLIOTT STEAM TURBINE PAIRED WITH HYUNDAI-IDEAL ELECTRIC GENERATOR SET - NEW, YEAR 2016TT-6997 ELLIOTT STEAM TURBINE PAIRED WITH HYUNDAI-IDEAL ELECTRIC GENERATOR SET - NEW, YEAR 2016 1. ELLIOTT STEAM TURBINE PAIRED WITH HYUNDAI-IDEAL ELECTRIC GENERATOR SET 2. NEW, NEVER USED 3. MODEL: 2 DYR6 4. CAPACITY: 7MW QUANTITY: 1 Learn More -
TT-5672 GE 9HA GAS TURBINE PACKAGE, 373MW, 50HzTT-5672 GE 9HA GAS TURBINE PACKAGE, 373MW, 50Hz GE 9HA GAS TURBINE PACKAGE 373MW, 50Hz GE 9HA.01 QUANTITY: 1 Learn More -
TT-5282 SIEMENS STEAM TURBINE, 3 MW, DIESEL FUEL AND NATURAL GAS FUEL GENERATORS, YEAR 2010TT-5282 SIEMENS STEAM TURBINE, 3 MW, DIESEL FUEL AND NATURAL GAS FUEL GENERATORS, YEAR 2010 SIEMENS STEAM TURBINE USED 3 MW SIEMENS SST/HOWDEN SST-110 TWIN AFA 46 K CAPACITY 3224 KW QUANTITY: 1 Learn More -
TT-5219 GE 9HA GAS TURBINE PACKAGE – NEW, 373 MW, 50Hz, YEAR 2015, DUAL FUELTT-5219 GE 9HA GAS TURBINE PACKAGE – NEW, 373 MW, 50Hz, YEAR 2015, DUAL FUEL BRAND: GE TURBINES MODEL: 9HA.01 NEW/UNUSED DUAL FUEL CONDITION: NEW YEAR: 2015 Learn More -
YY-2985 COMPLETE AND UNUSED SGT-400 50Hz GAS TURBINE DRIVEN GENERATOR PACKAGESYY-2985 COMPLETE AND UNUSED SGT-400 50Hz GAS TURBINE DRIVEN GENERATOR PACKAGES THE SIEMENS SGT-400 FAST POWER GAS TURBINE GENERATOR SET IS A SYSTEM DESIGNED FOR RAPID DEPLOYMENT. QUANTITY: 5 Learn More -
TT-3977 TURBINE BARGE, 48MW, YEAR 2001TT-3977 TURBINE BARGE, 48MW, YEAR 2001 TURBINE BARGE USED MODEL: 48MW BARGE YEAR: 1998 QUANTITY: 1 Learn More -
YY-2908 UNUSED 15.2MW SOLAR T 130 GAS TURBINE GENERATOR PACKAGES, QUANTITY 2, 22.789 KVA, 11 KV, 50 HzYY-2908 UNUSED 15.2MW SOLAR T 130 GAS TURBINE GENERATOR PACKAGES, QUANTITY 2, 22.789 KVA, 11 KV, 50 Hz YEAR OF MANUFACTURE: 2013/14 CONDITION: AS NEW OPERATING HOURS: 0 STATUS: INSTALLED FUEL: NG OR SYNGAS QUANTITY: 2 Learn More -
M-4835 POWER AND INDUSTRIAL PLANTS FOR SALEREFERENCE NUMBER: M-4835 (1111VEHJXX10) L POWER AND INDUSTRIAL PLANTS FOR SALE QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 230 COMBINED CYCLE GAS TURBINE POWER PLANT SIEMENS V94-2 1988 1 220 COMBINED CYCLE POWER PLANT 50 HZ, FUEL: DUAL FUEL (NATURAL GAS OR HFO/DIESEL) GE FRAME 6B CCPP 1992, RUNNING HOURS: 135 000, PREUSED 1 180 GAS TURBINE 125 MW, STEAM TURBINE 55 MW, 50 HZ, FUEL LFO AND NG GE FRAME 9E CCPP 2005, RUNNING HOURS: 2000 2 128 COMPLETE POWER PLANTS, 15 KV, FUEL: NATURAL GAS AND LIGHT OIL GE FRAME PG9171E NEW 2 127 GAS TURBINE PACKAGES FIAT AVIO MODEL TG 50 – D5 1998,DISMANTLED, OVERHAULED, UPGRADED FROM SIEMENS AND DISMANTLED 2 125 COMPLETE PLANT, 2 UNITS ABB GAS TURBINE PACKAGES, FUEL: DUAL FUEL, 50 HZ ABB, 50WT 18H-66 1995, JUST OVERHAULED, WARRANTY POSSIBLE 1 93 COMBINED CYCLE POWER PLANT. FUEL : NATURAL GAS GE FRAME 6FA 1997 MAJOR INSPECTION IN 2009 1 73 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. SIEMENS WESTINGHOUSE AND MITSUBISHI. 1999, RUNNING HOURS 97 000 1 70 COMBINED CYCLE POWER PLANT THOMASSEN/ABB 2009, RUNNING HOURS UNDER 90 000 CONDITION GOOD, 2009 OVERHAULED 5 66 GAS TURBINE PACKAGES, 50 OR 60 HZ ROLLS ROYCE, TRENT 60 2014, RUNNING HOURS ZERO 3 49 GAS TURBINE POWER PLANT, 50 HZ 3 UNITS GE LM 6000 PC 2004, RUNNING HOURS 6000 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 46 COMPLETE PLANT, INCLUDES 5 GAS TURBINE PACKAGES, INCLUDING 1 STEAM TURBINE, BOILER AND AUXILIARIES. FUEL: NATURAL GAS AND NAPHTA. 50 HZ. SIEMENS TYPHOON AND ALSTOM. 2000, LOW HOURS, STILL IN OPERATION 1 42 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. GE LM 6000PA 1997, LAST HOT END OVERHAUL WAS AT 86.080 HOURS IN AUG 2010 1 41 GAS TURBINE PACKAGE WITH HRSG, 50HZ FUEL: NATURAL GAS/FUEL OIL THOMASSEN PG-6541 1995, LAST OVERHAUL AT 118350 1 40 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS AND LIGHT OIL. 50 HZ. GE FRAME 6 B, DRY LOW NOX 1992, RECENTLY OVERHAULED, STILL GOOD FOR MORE THAN 24.000 RUNNING HOURS. READY TO SHIP. 5 37 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ SGT 750 SIEMENS NEW, ZERO HOURS 1 31,2 GAS TURBINE PACKAGES, 31,2 MW , 50/60 HZ, SGT 700 NEW, ZERO HOURS 5 31 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ GE TM2500 NEW 1 29,65 GAS TURBINE GENERATOR, 50 HZ, 11 KV SGT 700 2011, RUNNING HOURS ZERO (NEW) 1 27 COMBINED CYLE POWER PLANT, 27 MW, NATURAL GAS GE RLM 2500 PE AND ALSTOM STEAM TURBINE GAS TURBINE 1994, STEAM TURBINE 1996 1 26,59 GAS TURBINE, FUEL: GAS FRAME 5, PG-5371 PA 1995, RUNNING HOURS 174,104 4 24,6 CORE ENGINE FUEL: NATURAL GAS, 50 HZ SIEMENS SGT 600 (EX ABB GT 10B) 1994-1997, ZERO HOUR OVERHAULED 1 16 GAS TURBINE PACKAGE DUEAL FUEL ROLLS ROYCE AVON 1534-102L ZERO HOUR OVERHAULED IN 2008 1 14,25 NATURAL GAS ENGINE SOLAR TITAN 130 SOLONOX, 50 HZ TURBOMACH T19501 2007, ZERO RUNNING HOURS, AS NEW 3 12,9 GAS TURBINES SIEMENS, 60 HZ SIEMENS SGT 400 2014, NEW NEVER USED 1 11,86 GAS TURBINE, 60 HZ SOLAR MARS 100 15000 SOLONOX 1996, RUNNING HOURS 34 000 SINCE LAST OVERHAUL 2 9,2 CHP PLANT ELECTRIC, NATURAL GAS AND LIGHT DIESEL&BOTH SOLAR CENTAUR 50 T5701 2005 AND 2008, RUNNING HOURS 26 000 AND 2 500 1 8,8 COMBINED CYCLE GAS TURBINE POWER PLANT. 60 HZ. SOLAR MARS 90. 1989, LAST MAJOR OVERHAUL IN 2004, ONLY 1225 RUNNING HOURS 1 7,5 NATURAL GAS ENGINE SOLAR TAURUS T70, 50 HZ TURBOMACH SOLONOX + WHRB 2007, ZERO RUNNING HOURS AS NEW 1 5,5 GAS TURBINE, 50 HZ, NATURAL GAS SGT 200 1989, RUNNING HOURS 126 340 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 5,2 DUAL NATURAL GAS AND OIL ENGINE TAURUS 60, 50 HZ SOLAR TAURUS 60, SOLONOX T7301 1998, RUNNING HOURS17 700 1 1,4 GAS TURBINE PACKAGE INCL. HRSG, 50 HZ KAWASAKI KA 1334 1995, RUNNING HOURS AFTER MAJOR OVERHAUL 4000 Learn More -
TT-8553 GE TM2500+ GEN 6 DUAL FUEL (NATURAL GAS & DIESEL) TURBINE GENERATOR, 29 MW, YEAR 2012, 50-60 HzTT-8553 GE TM2500+ GEN 6 DUAL FUEL (NATURAL GAS & DIESEL) TURBINE GENERATOR, 29 MW, YEAR 2012, 50-60 Hz 1. GE TM2500+ GEN 6 DUAL FUEL (NATURAL GAS & DIESEL) TURBINE 2. THIS UNIT DELIVERS FAST, MOBILE POWER, ENSURING A STABLE ENERGY SUPPLY DURING OUTAGES. 3. MOUNTED ON A TRAILER FOR QUICK DEPLOYMENT, IT'S IDEAL FOR BASE LOAD BRIDGING, DISASTER RELIEF, PLANT SHUTDOWNS, AND MAINTENANCE. 4. ITS RELIABLE PERFORMANCE GUARANTEES POWER WHENEVER AND WHEREVER IT IS NEEDED QUANTITY: 1 Learn More