K-8157 COAL FIRED POWER PLANT (2 X 50MW)

K-8157 COAL FIRED POWER PLANT (2 X 50MW)

ENERGY BOILERS (CAE)

TURBINE SYSTEMS
STEAM TURBINES (TA) - DSL ARE 50 - 1
-CONDENSING TURBINE WITH TWO ADJUSTABLE OUTLETS, SUCH AS "ACTING" ON A SINGLE LINE OF TREES, DESIGNED TO DRIVE THE AC GENERATOR DIRECT-TYPE TH 60-2
-IS COMPOSED OF TWO BODIES: THE BODY OF HIGH PRESSURE (CIP) AND MEDIUM AND LOW PRESSURE BODY (CMP + CJP)
-HAS TWO ADJUSTABLE OUTLETS (PLUG SOCKETS AND PLUG HEATING) AND FIVE FIXED DOSES REGENERATIVE CIRCUIT FEED

SQUARES OF 600 CARS OVER T/H (WITH BUCKET WHEEL AND ARM LENGTH 12 M) - 4 PCS
-TIP HAMMER CRUSHERS CCA - 160 TO 2 PIECES
- RUBBER BANDS COAL TRANSPORT

THE MAIN EQUIPMENT IS ADDED TO ENSURE PROPER OPERATION FOLLOWING:
- SOLID FUEL STORAGE
- INSTALLATIONS AND INDUSTRIAL WATER SUPPLIES AND WASTEWATER DISCHARGE
- INSTALLATION OF EXHAUST HYDRAULIC SLAG
- WATER TREATMENT STATION
TO USE COAL, WEIGHT 88%, 12% NATURAL GAS

QUANTITY: 1

In stock
SKU
K-8157
Call Image
Call: +1 (864) 574-0404

We will send this product in 2 days. Read more...

Call us now for more info about our products.

Return purchased items and get all your money back.

Buy this product and earn 10 special loyalty points!


REFERENCE NUMBER: K-8157
COAL FIRED POWER PLANT (2 X 50MW)

ENERGY BOILERS (CAE)TURBINE SYSTEMS

STEAM TURBINES (TA) - DSL ARE 50 - 1
-CONDENSING TURBINE WITH TWO ADJUSTABLE OUTLETS, SUCH AS "ACTING" ON A SINGLE LINE OF TREES, DESIGNED TO DRIVE THE AC GENERATOR DIRECT-TYPE TH 60-2
-IS COMPOSED OF TWO BODIES: THE BODY OF HIGH PRESSURE (CIP) AND MEDIUM AND LOW PRESSURE BODY (CMP + CJP)
-HAS TWO ADJUSTABLE OUTLETS (PLUG SOCKETS AND PLUG HEATING) AND FIVE FIXED DOSES REGENERATIVE CIRCUIT FEED

* ELECTRICAL CONNECTION=MAXIMUM POSSIBLE ELECTRIC POWER TO BE PRODUCED TO FUNCTION AS GRAPHIC ELECTRIC (THERMAL POWER RESULTING CONSEQUENCES)

* THERMAL POWER=MAXIMUM POSSIBLE THERMAL POWER TO BE EXTRACTED FROM THE PLUGS AND/OR EXHAUST BACKPRESSURE TO FUNCTION AFTER THERMAL GRAPHIC (ELECTRIC POWER RESULTS ACCORDINGLY) 

SQUARES OF 600 CARS OVER T/H (WITH BUCKET WHEEL AND ARM LENGTH 12 M) - 4 PCS
-TIP HAMMER CRUSHERS CCA - 160 TO 2 PIECES
- RUBBER BANDS COAL TRANSPORT

THE MAIN EQUIPMENT IS ADDED TO ENSURE PROPER OPERATION FOLLOWING:
- SOLID FUEL STORAGE
- INSTALLATIONS AND INDUSTRIAL WATER SUPPLIES AND WASTEWATER DISCHARGE
- INSTALLATION OF EXHAUST HYDRAULIC SLAG
- WATER TREATMENT STATION
TO USE COAL, WEIGHT 88%, 12% NATURAL GAS

RESOURCES, WATER, ENERGY, NATURAL GAS ACTIVITIES:
THA ANNUAL AMOUNT OF ENERGY SOURCE LIGNITE
S.0 COAL SA - 544 322 T
S.C GAS SA - 22826788 NM3 METHANE
INDUSTRIAL AND TECHNOLOGICAL WATER RIVER - 2,726,200 M.C.
INDUSTRIAL AND TECHNOLOGICAL - 188,000 CUBIC METERS WATER DEPTH DRILLING

PRODUCTION AND DISTRIBUTION OF HEAT AND ELECTRICITY
MWH PRODUCED ELECTRICITY 250 212 2502 12 SEN
ELECTRICITY DELIVERED MWH 190227 190227
59985 59985 MWH ELECTRICITY CONSUMPTION
356 212 54 555 MWH OF HEAT PRODUCED 410 767
250 554 19 680 MWH OF HEAT DELIVERED 270 234
105 658 34 875 MWH OF HEAT CONSUMED 140 533
544322 544322 TONS OF COAL CONSUMPTION
GAS CONSUMPTION NMC 22826788 15760892 7065896

DESCRIPTION OF THE MAIN ACTIVITIES AND PROCESSES
PLANT PROFILE ACTIVITY IS THE COMBINED PRODUCTION OF ELECTRICITY AND HEAT (IN HEATING) BASED ON LIGNITE AND NATURAL GAS.
ELECTRICITY IS DELIVERED IN A NETWORK OF 110 KV ELECTRIC SOCIETY, AND HEAT IS DELIVERED IN THE FORM OF HOT WATER THAT FEEDS A NETWORK OF 43 CONSUMERS THROUGH THERMAL

HEATING POWER PLANT IS IN OPERATION A PLANT BURNING HIGH EXISTNTA
TYPE 1 CONSISTS OF TWO BOILERS ENERGY C1 AND C2 WITH THERMAL POWER OF 337 MWT EACH OUTBREAK ISSUING A CONCRETE CHIMNEY WITH A HEIGH OF 280 M AND TOP DIAMETER OF 8.5.M
THE DISTRICT HEATING POWER PLANT OPERATES CONTINUOUSLY; THE PRODUCTION ACTIVITY IS UNFOLDING AS FOLLOWS:
-PLANT LARGE COMBUSTION PLANTS (LCPS) ENERGY STEAM BOILERS C1 AND C2: OCTOBER 15, 15 APRIL (IN THE COLD SEASON)
-THERMAL POWER PLANT (CTP) 2 BOILERS 30 T/H: 15 APRIL 15 OCTOBER (IN THE WARM SEASON OF THE YEAR) WITH HEAT OUTPUT OF 23.4 MWT EACH
IMA DESCIERE: BOILERS C1 AND C2 (TYPE CR 1244) ARE ENERGETIC STEAM BOILERS 420 T/H SUPERHEATED STEAM WITH TN=540°C AND PN=137 BAR, LIGNITE AND NATURAL GAS FUEL, EACH BOILER WITH HEAT OINPUT OF 337 MWT
FLUE GAS IS DISCHARGE TO A COMMON STACK
CTP DESCRIPTION: 3 BOILER 30 T/H HEAT OUTPUT OF 23.4 MWT EACH
NATURAL GAS FUEL USED

THE MAIN PHASES ANDO PERATIONS OF THE PROCESS THAT TAKE PLACE AT CET ORDER TO ACCOMPLISH BASIC ACTIVITIES:
-SUPPLY, STORAGE, AND PREPARATION OF SOLID FUEL LIGNITE
-PREPARATION OF PROCESS WATER
-PRODUCTION OF STEAM ENERGY
-THE ELECTRICITY AND HEAT COGENERATION
-PRODUCTION AND SUPPLY OF ELECTRICITY
-TRANSPORT AND DISTRIBUTION OF THERMAL ENERGY TO CONSUMERS
-TRANSPORT AND DISPOSAL OF BURNING SLAG AND ASH DEPOSITS
-ACTIVITIES AND OPERATIONS: TRANSPORTATION, MAINTENANCE, COMPUTER, COMMERCIAL

SUPPLY, STORAGE AND PREPARATION OF SOLID FUEL COAL
CARBON SHUTTLE ARE DOWNLOADED FROM A SCAFFOLD OVERHEAD RAILWAY
AFTER DOWNLOADING COAL IS TAKEN OVER FOUR CARS TRANSPORTED ON RUBBER CONVEYORS, CRUSHING JAW CRUSHERS AND TWO SORTING GRIDS WITH TWO ROTATING BARS IS OBTAINED UP TO 30mm IN SIZE
AFTER CRUSHING COAL BUNKERS ARE DELIVERED DIRECTLY TO THE COAL SUPPLY BOILERS OR DEPOSITED IN THE COAL, THUS ENSURING STOCK FOR THE WINTER

PREPARATION OF PROCESS WATER
THIS SECTION PROVIDES THE TECHNOLOGICAL PROCESS IN THE COLLECTION, TREATMENT, AND DISPOSAL OF ALL CATEGORIES OF WATER RESULTING FROM THE ACTIVITIES

THE MAIN SOURCE OF INDUSTRIAL WATER S.C. CET FROM THE RIVER WATER IS DRAWN NECESSARY THROUGH A PUMPING STATION EQUIPPED WITH FOUR PUMPS TYPE MV 253
IT IS THEN PUMPED TO AN UNDERGROUND PIPE WITH CET DN=800mm AND LENGTH L = 12,332 M
IN TIMES OF FLOODS OR RIVER, WHEN NOT USING WATER FROM THIS SOURCE
(OR PUMP STATION SHUTDOWN DURING) USING DEEP WELLS DRILLED INSIDE CET

WATER PREPARATION TECHNOLOGY INCLUDES THE FOLLOWING PROCESSES:
-PUMPING WATER FROM SOURCES
-PREHEATING THE RAW WATER (DURING WINTER)
-PREPARATION OF REAGENTS FOR PRETREATMENT, SOFTENING, DEMINERALIZATION
-PRETREATMENT WATER/POND IN DECENTORI SUSPENSION, WATER FILTRATION
-WATER SOFTENING
-WATER DEMINERALIZATION
-TREATMENT OF CONDENSATE RECOVERED
-PUMPING OF SLUDE/SLUDE FROM THE PRETREATMENT AND FILTRATION PUMP STATION BAGGER
-NEUTRALIZATION OF WASTE WATER FROM THE DEMINERALIZATION

PRODUCTION OF STEAM ENERGY
IS DONE IN ONE OF TWO LARGE BOILERS BURNING PLANT IS COMPOSED

CONSTRUCTION FEATURES:
DESCRIPTION OF 337 MWT POWER BOILER STEAM 420 T/H
-RADIATION BOILER TYPE CR 1244, WITH WALLS AND DRUM MEMBRANE
-NATURAL CIRCULATION AND DEPRESSION IN OUTBREAK
-TWO GAS PATHS
-WITH ECONOMIZER AND SUPERHEATER 4
-BASIC FUEL: COAL, NATURAL GAS TO SUPPORT
- LOWER CALORIFIC VALUE - COAL: 1350 - 1800 KCAL/KG
- NATURAL GAS: 8050 KCAL/NM3
-LIGNITE COMBUSTION SYSTEM: DIRECT INJECTION
-COMBUSTION PLANTS: COAL DUST BURNERS 6 SLOTTED
EVACUATION OF COMBUSTION GASES: EACH STEAM BOILER PLANT IS EQUIPPED WITH A DUSTING ELECTROSTATIC (IDE) COMPOSED OF TWO ELECTROSTATIC DRY HORIZONTAL TYPE BS 672

EACH BOILER HAS AUXILIARY EQUIPMENT COMPRISES THE FOLLOWING:
-6 STRIP COAL SUPPLY
-6 COAL MILLS (FAN TYPE)
-2 AIR FANS
-BURNING GRILL
-TRANSPORT OF SLAG AND ASH
-2 SLAG CRUSHER
-2 ROTARY AIR PREANCALZITOARE
-2 ELECTROSTATIC
-2 FANS FUME

THE TWO BOILERS ARE CONNECTED TO A COMMON STACK WITH A HEIGHT = SMOKE 280 M AND DIAMETER - 8.5 M AT YOUR PEAK THAT ENSURES A GOOD DISPERSION IN THE ATMOSPHER OF FLUE GAS

CHARACTERISTICS WHICH ENSURE THE FLOW RATE OF THE BOILER:
LOWER CALORIFIC VALUE COAL Q = 1350 - 1800 KCAL/KG TOTAL COAL
MOISTURE (INITIAL STATE) WTI 37 46%; ASH CONTENT IN COAL
(INITIAL STATE): 20 - 31%
XILOIDA SUBSTANCE: 5 - 18%
CTP THERMAL POWER PLANT
HEATING STEAM POWER TECHNOLOGY IS DESIGNED TO PROVIDE DOMESTIC SERVICES TO START UP FROM COLD THE PLANT
THE SUMMER REGIME IS THE SOURCE OF HEAT FOR TWO PEAK BOILERS BV BV 2 AND 3

IT IS EQUIPPED WITH TWO INDUSTRIAL STEAM BOILERS WITH NATURAL CIRCULATION, USING NATURAL GAS AS FUEL

THE BOILERS ARE OF THE TYPE WITH HORIZONTAL GAS ROADS AND PRESSURE ON THE GAS COMBUSTION
CIRCULATION IS PROVIDED BY A FAN FOR EACH BOILER FLUE GAS, FLUE BEING DONE ON TWO METAL CHIMNEYS, CYLINDRICAL HAVING H = 26 M AND D = 1.3 M

BASIC TECHNICAL FEATURES OF BOILERS CTP:
NOMINAL FLOW: 30 T/H
MINIMUM FLOW: 12 T/H
NOMINAL PRESSURE: 16 ATA
250 + 35 °C STEAM TEMPERATURE
SUPPLY WATER TEMPERATURE 1000 °C
SCHEME THERMAL POWER PLANT
COMPRISES HEAT SUPPLY WATER
PREHEATER 1 PC
COOLER CONDENSATE FROM
PREANCALZITOR 1 PC STEAM
COOLER GETTER 1 PC
HEAT GETTER 1 PC
ELECTROPUMP WATER SUPPLY 4 PCS
PURIFY COOLER 1 PC
FEED WATER IS DEMINERALIZED WATER USED IN CHEMICAL SECTOR-WATER

THE ELECTRICITY AND HEAT COGENERATION
COMBINED ELECTRICITY AND HEAT IS THE STEAM TURBINES ARE EQUIPPED WITH PLUGS FOR EXTRACTION OF STEAM FOR INDUSTRIAL USE AND FOR HEATING, TURBINE ELECTRIC GENERATOR WHICH TRAINS ONE POWER OF 50 MWE

DESCRIPTION PROCESS: HIGH TEMPERATURE AND PRESSURE STEAM IS USED TRAIN THE THERMAL ENERGY TURBINES IS CONVERTED INTO MECHANICAL ENERGY OF ROTATION
SOME OF THE STEAM IS TAKEN FOR PREHEATING BOILER FREED WATER, ANOTHER PART IS TAKEN FROM STEAM VENTS INDUSTRIAL STEAM AND DISTRICT HEATING AND A SMALL CAPACITOR REACHES THE TURBINE WHERE IT CONDENSES WITH WATER COOLING
TURBINE TO DRIVE AND ELECTRIC GENERATOR TO PROVIDE ELECTRICITY AND STEAM PRODUCTION TAKE AFTER A PARTIAL RELAXATION IN THE TURBINE PRODUCES HEAT IN THE BOILERS
(COGENERATION - THE SIMULATENOUS PRODUCTION OF ELECTRICITY AND HEAT)
IN WINTER, THE HEATING SYSTEM IS COGENERATION (HEAT) BETWEEN 15 APRIL 30 OCTOBER USING COAL AS FUEL

STEAM BOILER TURBING POWER STATION BOILER OF THE HEATING PUMPS
NETWORK HEATING
IN THE REGIME OF SUMMER, WHEN HEAT DEMAND IS LIMITED TO THE NECESSARY PREPARATION PRODUCING DOMESTIC HOT WATER HEATING IS DONE IN TWO BV2 AND BV3 PEAK BOILERS USING STEAM PRODUCED BY THE TWO INDUSTRIAL STEAM CTP CTP 1 AND 2 RUNNING ON NATURAL GAS


PRODUCTION AND SUPPLY OF ELECTRICITY
ELECTRIC GENERATORS SUPPLIED ELECTRICITY AT 10.5 KV VOLTAGE AND THROUGH
TRANSFORMER 110 / 10.5 KV ARE CONNECTED TO NATIONAL ENERGY SYSTEM
GENERATORS ARE CONNECTED ACROSS TRANSFORMER OF 10.516 KV TO POWER TURBINES AND BOILERS OWN SERVICES
POWER PLANT FOR INTERNAL SERVICES ARE PROVIDED FOR TRANSFORMERS OF 25 MR 110 / 6 KV BARS CONNECTED TO 110 KV STATION
CONTACT 110 KV STATION POWER PLANT WITH SEN IS ACHIEVED THROUGH FOUR 110 KV OVERHEAD LINES

TRANSPORT AND DISTRIBUTION OF THERMAL ENERGY TO CONSUMERS
HEATING PUMP STATON:
PUMPING WATER HEATING NETWORKS IS ACHIEVED THROUGH A PUMPING STATION
ALSO IN THIS STATION ARE LOCATED EQUIPMENT NECESSARY TO COMPLETE THE CIRCUIT WITH WATER BOTH IN NORMAL OPERATION AS WELL WAS IN THE EMERGENCY REGIME
MAIN HEATING EQUIPMENT INSTALLED IN THE STATION ARE:
-STANDARD STAGE I HEATING, HOT WATER ASPIRING COLLECTOR AND A RETURN PUMPED INTO THE BOILERS AND WATER HEATERS STILL IN PEAK NO. 2 AND 3
-EMERGENCY TANKS (2 X 5000 M3) AND EMERGENCY ELECTRO PUMP (FLOW 440 T/H) WATER FLOW IN THE NETWORK ADDED INSURANCE IN CASE OF EMERGENCY

THE UNIT WAS STOPPED IN 2011, IS IN OPERATION, THE REASON BEING THE NATURE OF ECONOMIC
ALL EQUIPMENT, FACILITIES, PIPELINES ARE IN CONSERVATION

QUANTITY: 1

Write Your Own Review
You're reviewing:K-8157 COAL FIRED POWER PLANT (2 X 50MW)