L-5951 WESTINGHOUSE 100 MW GAS TURBINES, LNG FIRED, 60 Hz, YEAR 1995

REFERENCE NUMBER: L-5951

WESTINGHOUSE 100 MW GAS TURBINES, LNG FIRED, 60 Hz, YEAR 1995

 

GAS TURBINES

MAKE: WESTINGHOUSE

YEAR: 1995 (STOPPED IN JUNE 2013)

100 MW EACH X 6 = 600 MW TOTAL

 

QUANTITY: 5

In stock
SKU
L-5951
Call Image
Call: +1 (864) 574-0404

We will send this product in 2 days. Read more...

Call us now for more info about our products.

Return purchased items and get all your money back.

Buy this product and earn 10 special loyalty points!


REFERENCE NUMBER: L-5951

WESTINGHOUSE 100 MW GAS TURBINES, LNG FIRED, 60 Hz, YEAR 1995

 

GAS TURBINES

MAKE: WESTINGHOUSE

YEAR: 1995 (STOPPED IN JUNE 2013)

100 MW EACH X 6 = 600 MW TOTAL

LNG FIRED

FREQUENCY: 60 Hz

MODEL: W501D5

AXIAL FLOW

4 STAGE

INLET TEMP: 1093°C

EXHAUST TEMP: 530°C

EXHAUST FLOW: 1313272 KGS/H

TAC TEMP: 15°C

SPEED GOVERNOR DEHC

 

STARTING SYSTEM:

ELECTRIC MOTOR

CAPACITY: 1530 KW

 

14 X COMBUSTORS

CAN-ANNULAR

 

COMPRESSOR

AXIAL FLOW

AIR MASS FLOW: 358 Nm/MIN

INLET TEMP: 15°C

PRESSURE RATIO: 14:01

OUTLET PRESSURE: 14.462 KG/ SQUARE CM

19 STAGES

OUTLET TEMP: 389°C

 

2 X WESTINGHOUSE GENERATORS (ALTERNATORS)

TYPE: OAC (OPEN-AIR-COOLED)

RATED POWER: 129 (143) MW (MVA)

POWER FACTOR: 90%

FREQUENCY: 60 Hz

SPEED: 3600 RPM

RATED CURRENT: 13.8 KV/5731 AMPS

INSULATION CLASS: F

 

EXCITER

SPEED: 3600 RPM

TYPE: PMG

RATED CURRENT: 325 VOLTS/ 1006 AMPS

PROTECTION DEVICES: 87G, 59 GN, 40, 32, 46, 51V, 60, 25

NEUTRAL GROUNDING : NGR

BUS BAR ; IPB (3 PHASE)

ROTATION DIRECTION: CW5

 

3.OPERATION HOURS 

GAS TURBINE #1. NO LONGER AVAILABLE

GAS TURBINE #2. 37, 013HOURS (1996.1~2013.6) 

GAS TURBINE #3. 39, 800HOURS (1996.1~2013.6) 

GAS TURBINE #4. 41, 541HOURS (1996.7~2013.6) 

GAS TURBINE #5 41, 819HOURS (1996.7~2013.6) 

GAS TURBINE #6. 40, 524HOURS (1996.7~2013.6) 

 

4.OPERATION HOURS FROM OVERHAUL TO STOP 

GAS TURBINE #1: NO LONGER AVAILABLE

GAS TURBINE #2: 16, 611 HOURS 

GAS TURBINE #3: 17, 098 HOURS 

GAS TURBINE #4: 15, 686 HOURS 

GAS TURBINE #5: 17, 978 HOURS 

GAS TURBINE #6: 16, 921 HOURS

 

QUANTITY: 5

Write Your Own Review
You're reviewing:L-5951 WESTINGHOUSE 100 MW GAS TURBINES, LNG FIRED, 60 Hz, YEAR 1995