Description Item 001 York air cooled chillers Capacity: 50 ton Year 2017 to 2024 Volts 208 to 460 60 Hz Phase 3 In stock Item 002 York air cooled chiller Capacity: 70 ton Year 2024 Voltage 460 60 Hz Air cooled Phase 3 In stock Item 003 York air cooled chillers Capacity: 100 ton Year 2023 to 2024 Voltage 460 60 Hz Air cooled Phase 3 Single point circuit breaker 44F leaving water, 54F entering chilled water temperature 95F air on condenser Control transformer Brazed plate and frame heat exchanger Service isolation valves Hail guards for condenser coils Low sound condenser fans Fully louvered enclosure Hot gas bypass Low ambient operation Neoprene isolators Single point connection with circuit breaker Factory startup In stock Item 004 York air cooled chiller Capacity: 150 ton Year 2023 Voltage 460 60 Hz Air cooled Phase 3 150 TR capacity (nominal) 145.3 TR @ AHRI design conditions 460/3/60 VAC Single point circuit breaker, 5KA SCWR R-410A refrigerant 44F leaving water, 54F entering chilled water temperature 95F air on condenser Control transformer Brazed plate and frame heat exchanger Service isolation valves Hail guards for condenser coils Low sound condenser fans In stock Item 005 York air cooled chiller Capacity: 500 ton Year 2023 Voltage 460 60 Hz Air cooled Phase 3 500 TR capacity (nominal) 478.9 TR @ AHRI design conditions 460/3/60 VAC Single point circuit breaker, 5KA SCWR R-410A refrigerant 44F leaving water, 54F entering chilled water temperature 95F air on condenser Control transformer Hybrid falling film heat exchanger Service isolation valves Hail guards for condenser coils Low sound condenser fans Arriving May 2024 Item 006 Trane air cooled chiller Capacity: 500 ton Year 2024 Air cooled Phase 3 Arriving September 2024