GE, 9FA CCPP, 2015, 810 MW, Natural Gas, 50Hz

Description

  1. Overview
    1. GE 9FA combined cycle power plant
    2. 810 MW total capacity
    3. Natural gas fuel, 50 Hz frequency
    4. Year of commission: 2015
    5. Fired hours: 2,000 hours
  2. Package Included
    1. 2 x 257 MW GE 9FA package
    2. 2 x CMI heat recovery steam generator
    3. 2 x 144 MW Alstom steam turbine package
    4. 2 x 405 MW CCGT in 1+1+1 configuration
  3. Condition
    1. Operated under full GE LTSA
    2. Equipment is sold as-is, installed
    3. Inspection arrangements welcome