Description Overview Based on GE Frame 9FA technology, supplied, installed, but not commissioned. The plant equipment is available as a complete package, including major equipment, auxiliaries and balance of plant (BOP). Plant Configuration Overview Total configuration: 2 × GE Frame 9FA gas turbines 2 × CMI triple pressure HRSG 1 × GE steam turbine Combined cycle output: ~750 MW per block Status: installed / partially installed Not commissioned Units have never been fired or operated Gas Turbine Island Gas turbines Quantity: 2 units Brand: GE Model: Frame 9FA +e DLN2+ Fuel: dual fuel Frequency: 50 Hz Site rated output: 241,000 kW per unit Year of manufacture / delivery: 2012 Status: installed, unused Gas turbine generators Brand: GE Rated capacity: 310,725 kVA Gas turbine transformers Brand: Hyundai Type: oil-filled Rating: 335 MVA Voltage: 15.75 kV Steam Turbine Island Steam turbine Quantity: 1 unit Brand: GE Model: GE-D11 Type: condensing Rated output: 276,040 kW (370,175.7 hp) Configuration: HP: 10 stages IP: 8 stages LP: 2 × 5 stages Status: unused, packaged and stored Steam turbine generator Brand: GE Rated capacity: 324,760 kVA Steam turbine transformer Brand: Hyundai Type: oil-filled Rating: 335 MVA Voltage: 15.75 kV Heat Recovery Steam Generators (HRSG) Quantity: 2 units Brand: CMI – Belgium Type: triple pressure, horizontal, natural circulation Status: approx. 90% mechanically constructed Auxiliaries & Balance of Plant (BOP) A complete auxiliary and BOP scope supplied primarily by Aker Solutions, including: Black start system – Sterling Wilson Distributed control system (DCS) GE Mark VIe control system for GT & ST Cooling towers – Hamon Electrical BOP & switchyard equipment Hyundai power transformers Fuel gas conditioning system Pumps (CW, vertical, horizontal, ACW booster) Piping, valves, heaters, instrumentation Isolated phase bus duct HT switchgear, control & relay panels Unit auxiliary transformers Cabling, cable trays, grounding systems Installation & Storage Status Major equipment installed but not commissioned HRSG: partially erected (~90%) Steam turbine: stored, unused Approximately 400 containers of equipment remain stored and not yet installed, including: electrical systems Mechanical auxiliaries Piping & hardware Instruments & control components Shelf-life items (batteries, filters, paints, etc.) Warranty Status The plant has not been commissioned, therefore: Original GE warranty has not been consumed GE warranty reactivation is possible Subject to payment of an applicable fee, GE can reinstate and warrant the units Commercial Notes Available as complete package or by negotiated scope Ideal for fast-track deployment Significant savings compared to new-build lead times Immediate availability subject to agreement Quantity: 2