R-3276 GOTHOT CAST IRON ROASTER ASSEMBLY PROJECT - 120 KILOS

R-3276 GOTHOT CAST IRON ROASTER ASSEMBLY PROJECT - 120 KILOS

THIS INCLUDES A LEFT-SIDE DUMP ROASTER, LOADER, DE-STONER, AFTERBURNER.
IT IS CURRENTLY IN STORAGE IN 8 PALLETS AND WILL REQUIRE ASSEMBLY AND RE-PAINTING AND SOME REBUILDING OF THE DRUM "DUMP DOOR" ASSEMBLY.
THE ROASTER WAS WORKING UNTIL THE DAY IT WAS DISCONNECTED. HOWEVER THE MOTORS AND FAN BLADES AS WELL AS SOME CONNECTING TUBES ARE OLD ENOUGH TO WARRANT RELACING. THIS IS A PROJECT - BUT GOTHOT IS WORTH PRESERVING
AFTERBURNER WAS BUILT BY DIEDRICH AND IS MUCH NEWER THAN THE ROASTER.
IT IS 3 PHASE POWER AND NATURAL GAS.

QUANTITY: 1

In stock
SKU
R-3276
Call Image
Call: +1 (864) 574-0404

We will send this product in 2 days. Read more...

Call us now for more info about our products.

Return purchased items and get all your money back.

Buy this product and earn 10 special loyalty points!


REFERENCE NUMBER: R-3276
GOTHOT CAST IRON ROASTER ASSEMBLY PROJECT - 120 KILOS

THIS INCLUDES A LEFT-SIDE DUMP ROASTER, LOADER, DE-STONER, AFTERBURNER.
IT IS CURRENTLY IN STORAGE IN 8 PALLETS AND WILL REQUIRE ASSEMBLY AND RE-PAINTING AND SOME REBUILDING OF THE DRUM "DUMP DOOR" ASSEMBLY.
THE ROASTER WAS WORKING UNTIL THE DAY IT WAS DISCONNECTED. HOWEVER THE MOTORS AND FAN BLADES AS WELL AS SOME CONNECTING TUBES ARE OLD ENOUGH TO WARRANT RELACING. THIS IS A PROJECT - BUT GOTHOT IS WORTH PRESERVING
AFTERBURNER WAS BUILT BY DIEDRICH AND IS MUCH NEWER THAN THE ROASTER.
IT IS 3 PHASE POWER AND NATURAL GAS.

QUANTITY: 1

Write Your Own Review
You're reviewing:R-3276 GOTHOT CAST IRON ROASTER ASSEMBLY PROJECT - 120 KILOS