R-3276 GOTHOT CAST IRON ROASTER ASSEMBLY PROJECT - 120 KILOS
R-3276 GOTHOT CAST IRON ROASTER ASSEMBLY PROJECT - 120 KILOS
THIS INCLUDES A LEFT-SIDE DUMP ROASTER, LOADER, DE-STONER, AFTERBURNER.
IT IS CURRENTLY IN STORAGE IN 8 PALLETS AND WILL REQUIRE ASSEMBLY AND RE-PAINTING AND SOME REBUILDING OF THE DRUM "DUMP DOOR" ASSEMBLY.
THE ROASTER WAS WORKING UNTIL THE DAY IT WAS DISCONNECTED. HOWEVER THE MOTORS AND FAN BLADES AS WELL AS SOME CONNECTING TUBES ARE OLD ENOUGH TO WARRANT RELACING. THIS IS A PROJECT - BUT GOTHOT IS WORTH PRESERVING
AFTERBURNER WAS BUILT BY DIEDRICH AND IS MUCH NEWER THAN THE ROASTER.
IT IS 3 PHASE POWER AND NATURAL GAS.
QUANTITY: 1
REFERENCE NUMBER: R-3276
GOTHOT CAST IRON ROASTER ASSEMBLY PROJECT - 120 KILOS
THIS INCLUDES A LEFT-SIDE DUMP ROASTER, LOADER, DE-STONER, AFTERBURNER.
IT IS CURRENTLY IN STORAGE IN 8 PALLETS AND WILL REQUIRE ASSEMBLY AND RE-PAINTING AND SOME REBUILDING OF THE DRUM "DUMP DOOR" ASSEMBLY.
THE ROASTER WAS WORKING UNTIL THE DAY IT WAS DISCONNECTED. HOWEVER THE MOTORS AND FAN BLADES AS WELL AS SOME CONNECTING TUBES ARE OLD ENOUGH TO WARRANT RELACING. THIS IS A PROJECT - BUT GOTHOT IS WORTH PRESERVING
AFTERBURNER WAS BUILT BY DIEDRICH AND IS MUCH NEWER THAN THE ROASTER.
IT IS 3 PHASE POWER AND NATURAL GAS.
QUANTITY: 1