TT-2817 GENERAL ELECTRIC LM2500 PE SAC GAS TURBINE, 22.5 MW, WITH GE SIX-STAGE PT
TT-2817 GENERAL ELECTRIC LM2500 PE SAC GAS TURBINE, 22.5 MW, WITH GE SIX-STAGE PT
QUANTITY: 2
In stock
SKU
TT-2817
REFERENCE NUMBER: TT-2817
GENERAL ELECTRIC LM2500 PE SAC GAS TURBINE, 22.5 MW, WITH GE SIX-STAGE PT
GENERAL ELECTRIC LM2500 PE SAC
POWER TURBINE: LM2500 SIX STAGE
TOTAL HOURS SINCE NEW: UNKNOWN
RATED POWER: 22.5 MW
OPERATING MODE: PARTIAL LOAD
TIME SINCE LAST OVERHAUL: 2320 AND 6490 HOURS
WITH GE SIX-STAGE PT
EXCELLENT CONDITION
THE ENGINES HAVE BEEN OVERHAULED BY GE RHEDEN AND GE ITALY AND RUN FOR A FEW HOURS ON GAS FUEL ONLY AS STANDBY UNITS.
PRESERVED AND MAINTAINED ON A REGULAR BASIS AFTER DECOMMISSIONING.
DOCUMENTATION AVAILABLE.
UNITS CAN BE INSPECTED IN OUR WAREHOUSE.
LM2500 PE SAC WITH 6-STAGE PT: RATED POWER 24 MW.
ENGINES WERE USED FOR "ON DEMAND" OFFSHORE GAS COMPRESSOR DRIVES WITH REDUCED LOADS OF 12-15 MW.
(EACH ENGINE IS CURRENTLY EQUIPPED WITH GAS FUEL NOZZLES).
ENGINES DECOMMISSIONED IN 2019 DUE TO THE CLOSING OF OPERATION AND HAVE BEEN PRESERVED AND MAINTAINED PERIODICALLY SINCE.
THE LAST OF REPORTS FROM GE ENERGY, ITALY, AND THE NETHERLANDS WILL BE SHARED UPON INSPECTION OF THE ENGINES.
QUANTITY: 2
Write Your Own Review