TT-5649 STEAM TURBINE POWER PLANT, 147MW, 60Hz, YEAR 1999

TT-5649 STEAM TURBINE POWER PLANT, 147MW, 60Hz, YEAR 1999 STEAM TURBINE POWER PLANT BRAND: MITSUBISHI (JAPAN) MANUFACTURING YEAR: 1999 RUNNING HOUR: 43,970 HOURS OUTPUT: 147MW (AT GENERATOR TERMINAL)
In stock
SKU
TT-5649
Call Image
Call: +1 (864) 574-0404

We will send this product in 2 days. Read more...

Call us now for more info about our products.

Return purchased items and get all your money back.

Buy this product and earn 10 special loyalty points!


REFERENCE NUMBER: TT-5649 STEAM TURBINE POWER PLANT, 147MW, 60Hz, YEAR 1999 STEAM TURBINE POWER PLANT BRAND: MITSUBISHI (JAPAN) MANUFACTURING YEAR: 1999 RUNNING HOUR: 43,970 HOURS OUTPUT: 147MW (AT GENERATOR TERMINAL) TYPE: EXHAUST RE-HEATING, RE-USABLE, CONDENSATE TURBINE SPEED: 3600RPM FUEL: PULVERIZED COAL COAL CONSUMPTION: 3220KG X 8/H=25.76TON/H EXTRACTION STAGE NO.: 7 STAGES MAIN STEAM PRESSURE: 169KG/CM2G (16.57MPA) MAIN STEAM TEMPERATURE: 566℃ REHEATING STEAM TEMPERATURE: 538℃ REHEATING STEAM PRESSURE: 30.4KG/CM2 (2.98MPA) EXHAUST ROOM PRESSURE: 722MMHGVAC (-0.0959MPA) -COOLING WATER: SEA WATER -CONDENSATION OF WATER MACHINE -AIR EXTRACTOR -HIGH PRESSURE WATER SUPPLY HEATER X 3UNITS -LOW PRESSURE WATER SUPPLY HEATER X 3UNITS (GENERATOR) BRAND: MITSUBISHI (JAPAN) MANUFACTURING YEAR: 1999 OUTPUT: 147MW (163,334MVA) FREQUENCY: 60Hz VOLTS: 15,000V CURRENT: 6287A POWER FACTOR: 0.9 PHASE: 3 POLE: 2 FIELD MAGNETIC CURRENT: 1475A BRUSHLESS TYPE AIR COOLING WEIGHT: APPROX. 180TON REPLACE THE STATOR WITH A NEW ONE: YEAR 2016 REPLACE THE INNER FRAME WITH A NEW ONE: YEAR 2018 REPLACE THE BEARING WITH A NEW ONE: YEAR 2019 (BOILER) MANUFACTURING YEAR: 1999 TYPE: SINGLE-BODY RADIATION REHEATING TYPE, NATURAL CIRCULATION TYPE STEAM CAPACITY: 460TON/H (100%MCR) MAIN STEAM PRESSURE: 174KG/CM2G (SUPER HEATER OUTLET) MAIN STEAM TEMPERATURE: 569℃ (SUPER HEATER OUTLET) REHEATING STEAM TEMPERATURE: 541℃9 (RE-HEATER OUTLET) COMBUSTION: COAL OR COAL/A-HEAVY OIL FUEL: COAL (100%MCR), A-HEAVY OIL (35%MCR) PULVERIZED COAL BURNERS (8 UNITS): 3220 KG/H (PER BURNER) COAL CONSUMPTION: 3220KG X 8/H=25.76TON/H HEAVY OIL BURNER (8 UNITS): 1,670 KG/H (PER BURNER) HEAVY OIL BURNER IGNITION DEVICE (8 UNITS): ELECTRIC IGNITION TYPE GAS IGNITER START FUEL: A-HEAVY OIL FOR IGNITION: LPG OR A-HEAVY OIL COMBUSTION TYPE: ROTATION COMBUSTION MAIN FUEL: PULVERIZED COAL (PULVERIZED COAL MACHINE) SUPPLY COAL MACHINE: 20TON/H X 3 UNITS CAPACITY: 18TON /H (270KW) X 3UNITS BURNER (LOW NOX BURNER) (MAIN EQUIPMENT LIST OF BOILER) -STEAM DRUM -FURNACE -SUPER HEATER -COAL SAVER -RENEWABLE AIR PREHEATER -STEAM-TYPE AIR PREHEATER -ASH TREATMENT DEVICE (MAIN AUXILIARY OF POWER PLANT) -PULVERIZED COAL MACHINE -TRANSFORMER -ELECTRIC TYPE DUST COLLECTOR -PURE WATER MANUFACTURING DEVICE -AMMONIA SUPPLY DEVICE -AIR COMPRESSOR -FIRE EXTINGUISHING EQUIPMENT -DESULFURIZATION DEVICE -DE-NITRITE DEVICE -AIR-VENTILATION DEVICE -SEAWATER INTAKE EQUIPMENT -CONTINUOUS COAL UNLOADER (600 TONS/H) -COAL-CARRYING CONVEYOR -COAL TRANSPORT CONVEYOR: 4 UNITS
Write Your Own Review
You're reviewing:TT-5649 STEAM TURBINE POWER PLANT, 147MW, 60Hz, YEAR 1999