TT-7524 SUCKER MULLER HACOBA INDIGO DYEING AND SIZING MACHINE, WIDTH 2000mm, YEAR 2003
TT-7524 SUCKER MULLER HACOBA INDIGO DYEING AND SIZING MACHINE, WIDTH 2000mm, YEAR 2003
1. SUCKER MULLER HACOBA INDIGO DYEING AND SIZING MACHINE
2. YEAR: 2003
3. BRAND: SUCKER MULLER HACOBA
In stock
SKU
TT-7524
REFERENCE NUMBER: TT-7524
SUCKER MULLER HACOBA INDIGO DYEING AND SIZING MACHINE, WIDTH 2000mm, YEAR 2003
1. SUCKER MULLER HACOBA INDIGO DYEING AND SIZING MACHINE
2. YEAR: 2003
3. BRAND: SUCKER MULLER HACOBA
4. INDIGO DYEING AND SIZING MACHINE - 14 BOXES (DYE AND WASH)
5. 2 SIZING BOXES
6. TECHNICAL DATA: 25 TO 35 M/MIN (82 TO 115 FT/MIN)
7. 2000mm (78.7 IN) WIDTH
8. PLATE DIAMETER: 1400mm (55.1 IN)
9. CYLINDER DIAMETER: 456mm (17.95 IN)
10. MECHANISMS: ENTRY SCRAY
11. WASH BOX 1, 2, 3
12. OXIDATION ZONE
13. DYEING BOXES 1-7
14. VAPORIZER
15. WASH BOX 1, 2, 3
16. SIZING A & B
17. DRUM DRYER, EXIT
ITEM 001
1. SUCKER WARPING MACHINE, 460 POSITIONS, 1600 TO 1700mm WIDTH YEAR: 2003
2. CONTROL SYSTEM: SIEMENS S7300/S7200
3. BRAKING SYSTEM: HYDRAULIC, DRUM Ø 575mm
4. CREELS: ELECTRIC HOOK STOP SENSOR, MANUAL WARP CUTTING
5. MACHINE SPEED: 800RPM
6. ENERGY CONSUMPTION: 55KWH
ITEM 002
1. SUCKER INDIGO DYEING AND SIZING MACHINE, 1800mm WIDTH, YEAR 2003
2. ENTRY AND EXIT ROLLERS ARE 1800mm WIDE
3. 1 BOX FOR DESIZING
4. 8 DYEING BOXES
5. 5 WASHING BOXES
6. 2 SIZING BOXES
7. CONTROL SYSTEM: SIEMENS S7400
8. ACCUMULATOR: TWO INDEPENDENT SECTIONS, ONE CAN ACCUMULATE WHILE THE OTHER IS AT REST. EACH SECTION CONSISTS OF 24 GROOVED CYLINDERS. EVERYTHING IS OPERATED BY A HYDRAULIC SYSTEM WITH A PUMP AND CONTROL VALVES TO REGULATE FLOW, WITH HYDRAULIC SYSTEM COOLING THROUGH WATER. TRANSMISSION IS CARRIED OUT VIA GEARS AND CHAINS, SYNCHRONIZED BY A GEAR MOTOR AND CONTROL SYSTEM.
9. DESIZING BOX: 1200L VOLUME, FOULARD Ø 288mm 6 CYLINDERS FOR MATERIAL TRANSPORT, SUBMERGED CYLINDERS SUPPORTED BY BEARINGS AND BUSHINGS.
10. WASHING BOX: FOULARD Ø 288mmAT THE EXIT, 3 CYLINDERS FOR MATERIAL TRANSPORT INSIDE THE BOX, 4 EXTRACTOR CYLINDERS, CYLINDERS SUPPORTED BY BEARINGS AND BUSHINGS, CASCADE-TYPE WATER FEED FLOW.
11. DYEING BOX: 1000L VOLUME, FOULARD Ø 288mmAT THE EXIT, 6 CYLINDERS FOR MATERIAL TRANSPORT, SUBMERGED CYLINDERS SUPPORTED BY BEARINGS AND BUSHINGS, FLOW RATE BETWEEN 1-3L/MIN.
12. SIZING BOX: 150L VOLUME, AUXILIARY FOULARD Ø 212 TO 240mm MAIN FOULARD Ø 211 TO 240mm, 6 CYLINDERS FOR MATERIAL TRANSPORT INSIDE THE BOX.
13. PRE-DRYING: 8 DRUMS, ROTARY JOINT AND DRAINAGE SYSTEM, CHAIN AND GEAR TRANSMISSION SYSTEM POWERED BY A GEAR MOTOR.
14. DRYER: 16 TEFLON-COATED DRUMS, ROTARY JOINT AND DRAINAGE SYSTEM, CHAIN AND GEAR TRANSMISSION SYSTEM POWERED BY A GEAR MOTOR.
15. HEAD: 1 TAKE-UP CYLINDER Ø 253mm NOMINAL, WIDTH FOR 2200mm, WARP COMB SYSTEM. HYDRAULIC SYSTEM WITH PUMP AND CONTROL VALVES TO REGULATE FLOW, COOLING BY WATER. TRANSMISSION VIA GEARS AND CHAINS, SYNCHRONIZED BY A GEAR MOTOR AND CONTROL SYSTEM.
16. INDIGO DOSAGE: 50,000L TANK FOR STORING PRE-REDUCED INDIGO AND FEEDING THE DYE BOXES.
17. 2 CREELS - ONE WITH 16 WARPED CYLINDER POSITIONS AND ANOTHER WITH 14 POSITIONS.
18. INTRODUCTION SYSTEM: UNWINDING CYLINDER FOR FEEDING INTO THE DESIZING BOX, 1 CYLINDER Ø 212mm.
19. EXTRACTION SYSTEM: 5 EXTRACTORS ALONG THE MACHINE - 3 IN THE PRE-DRYING SECTION AND 2 IN THE DRYING SECTION.
20. GENERAL DESCRIPTION: THE PROCESS CONSISTS OF INDIGO DYEING AND SIZING AS PREPARATION FOR THE WEAVING PROCESS.
21. THE MACHINE HAS 2 CREELS AT THE ENTRY, WHERE 16 WARPED CYLINDERS ARE POSITIONED IN ONE AND 14 IN THE OTHER.
22. THE MATERIAL PASSES THROUGH A DESIZING BOX TO REMOVE IMPURITIES FROM THE RAW MATERIAL AND PREVIOUS PROCESSES, IMPROVING DYEING QUALITY.
23. THE PROCESS CONTINUES IN THE WASHING BOXES TO REMOVE TRACES OF THE DESIZING PROCESS.
24. AFTER WASHING, THE DYEING PROCESS BEGINS IN 8 BOXES (WHICH CAN BE LIFTED MECHANICALLY FOR EASIER MAINTENANCE).
25. THE MATERIAL THEN GOES THROUGH THE PRE-DRYING SYSTEM BEFORE REACHING TWO SIZING BOXES FOR WARP SIZING (ROLLER WIDTH: 1800mm, SQUEEZE ROLLERS COVERED WITH RUBBER).
26. FINALLY, THE MATERIAL PASSES THROUGH THE DRYER AND THE ACCUMULATION SYSTEM BEFORE REACHING THE END OF THE PROCESS AT THE MACHINE’S HEAD, WHERE THE DYED AND SIZED WARP IS WOUND ONTO CYLINDERS, READY FOR WEAVING.
27. CONTROL ROOM COOLING SYSTEM: RIETEL BRAND.
28. YEAR: 2003
29. FREQUENCY: 60Hz
30. VOLTAGE: 440VAC
31. CONTROL VOLTAGE: 24V DC
32. OPERATING CAPACITY: 1,900,000
33. ENERGY CONSUMPTION: 48KWH
34. STEAM CONSUMPTION: 4800LBH
35. WATER CONSUMPTION: 18M³/H
36. MACHINE SPEED: 25-35M/MIN