TT-7787 WARTSILA POWER PLANT, 169 MW, 60Hz, YEAR 2010
TT-7787 WARTSILA POWER PLANT, 169 MW, 60Hz, YEAR 2010
1. WARTSILA POWER PLANT
2. COMMERCIAL OPERATION START: JANUARY 2010
3. CONTRACT STATUS: OPERATED UNDER STANDBY MODE UNTIL DECEMBER 2024
4. 20 X WARTSILA 20V32
5. 8.45MW EACH, 60Hz
6. HFO, BUT CONVERTIBLE TO DIESEL OR BIODIESEL. GREEN.
VERY GOOD CONDITION
In stock
SKU
TT-7787
REFERENCE NUMBER: TT-7787
WARTSILA POWER PLANT, 169 MW, 60Hz, YEAR 2010
1. WARTSILA POWER PLANT
2. COMMERCIAL OPERATION START: JANUARY 2010
3. CONTRACT STATUS: OPERATED UNDER STANDBY MODE UNTIL DECEMBER 2024
4. 20 X WARTSILA 20V32
5. 8.45MW EACH, 60Hz
6. HFO, BUT CONVERTIBLE TO DIESEL OR BIODIESEL. GREEN.
HIGHLIGHTS
7. 20 GENERATING SETS (GENSETS) MOUNTED ON STEEL SPRING FOUNDATIONS
8. SYNCHRONOUS THREE-PHASE GENERATORS WITH TURBOCHARGED DIESEL ENGINES
9. COMPREHENSIVE AUXILIARY SYSTEMS:
10. FUEL TREATMENT AND BOOSTER SYSTEMS
11. BLACK START GENERATOR
12. CHARGE AIR, COOLING WATER, AND EXHAUST SYSTEMS
13. STEAM GENERATION AND COMPRESSED AIR SYSTEMS
14. PLC-BASED CONTROL & MONITORING WITH CENTRAL AND LOCAL PANELS
15. MV POWER DISTRIBUTION WITH GENERATOR CUBICLES, SWITCHGEAR, AND TRANSFORMERS
CURRENT CONDITION
16. RUNNING HOURS: MOST GENSETS REMAIN WITHIN OPTIMAL MAINTENANCE RANGES
17. 70% OF UNITS ARE BELOW OR APPROACHING 6,000 HOURS, WELL BELOW OVERHAUL THRESHOLD
18. CLEAN AND WELL-MAINTAINED MECHANICAL AND ELECTRICAL INFRASTRUCTURE
19. DISMANTLING-READY: ALL SYSTEMS MODULAR AND FEASIBLE FOR RELOCATION
SCOPE OF SUPPLY
20. CIVIL WORKS: BUILDINGS AND CIVIL STRUCTURES THAT CAN BE DISMANTLED
21. MECHANICAL EQUIPMENT: ALL EQUIPMENT AND AUXILIARY UNITS/MODULES
22. ELECTRICAL & CONTROL: PANELS, CABLING, ETC. (EXCLUDING HIGH-VOLTAGE SYSTEM)
KEY SYSTEMS DESCRIPTION
23. GENSET: DIESEL ENGINE + SYNCHRONOUS GENERATOR ON A FLEXIBLE BASE
24. ENGINE MODULES: LUBRICATION, FUEL, COOLING, AND EXHAUST MODULES STEAM TRACING, SEPARATORS, SILENCERS, ETC.
25. BLACK START UNIT: INDEPENDENT GENERATOR FOR STARTUP WITHOUT GRID SUPPORT
26. FUEL TREATMENT: SEPARATOR UNITS WITH PUMPS AND HEATERS
27. COMPRESSED AIR SYSTEM: FOR ENGINE START AND PNEUMATIC OPERATIONS
28. COOLING SYSTEM: LOW-TEMPERATURE & HIGH-TEMPERATURE WATER CIRCUITS
29. CHARGE AIR SYSTEM: TURBOCHARGED AND INTERCOOLED INTAKE AIR
30. EXHAUST SYSTEM: HEAT RECOVERY + NOISE REDUCTION
31. STEAM GENERATION: EXHAUST HEAT + AUXILIARY BOILER
32. CONTROL SYSTEM: CENTRAL + LOCAL PANELS, PLCS, SYNCHRONIZERS
33. POWER DISTRIBUTION: MV SWITCHGEAR, TRANSFORMERS, PROTECTION RELAYS (HV NOT INCLUDED)
34. PACKING LIST: ENGINES, GENERATORS, MODULES, AUXILIARY SYSTEMS, ETC.
35. ADDITIONAL NOTES: HIGH VOLTAGE SYSTEM: NOT INCLUDED IN SCOPE
36. CONDITION & MODULARITY: SYSTEM IS DESIGNED FOR MODULAR DISASSEMBLY AND TRANSPORT
37. VERY GOOD CONDITION
Write Your Own Review