YY-2241 124 MW GE FRAME 9E CHP COMPLETE POWER PLANT, 50 Hz

YY-2241 124 MW GE FRAME 9E CHP COMPLETE POWER PLANT, 50 Hz GAS TURBINE MODEL / TYPE: GENERAL ELECTRIC -GE FRAME 9E - PG9171(E) 50Hz; SINGLE TURBINE DESIGN OUTPUT: 124 MW; DESIGN HEAT RATE: NET HEAT RATE AT GENERATOR TERMINALS KJ/KWH 10 716 ±1%; DLN SYSTEM: DLN1; COMMISSIONING DATE: 2009; SHUT-DOWN DATE: NOVEMBER 2017. WELL PRESERVED TO DATE; TOTAL FIRED TIME: 56500; PLANNED MAINTENANCE DATE: 2012 HOT GAS PATH INSPECTION, 2015 MAJOR INSPECTION; RATED OUTPUT / TERMINAL VOLTAGE: 150 MVA – 15 KV; TRANSFORMERS: STEP UP TRANSFORMER: 153 MVA. TURBINE EFFICIENCY: NET HEAT RATE AT GENERATOR TERMINAL IS 10,760 kJ/kWh QUANTITY: 1
In stock
SKU
YY-2241
Call Image
Call: +1 (864) 574-0404

We will send this product in 2 days. Read more...

Call us now for more info about our products.

Return purchased items and get all your money back.

Buy this product and earn 10 special loyalty points!


REFERENCE NUMBER: YY-2241 124 MW GE FRAME 9E CHP COMPLETE POWER PLANT, 50 Hz DETAILS: GAS TURBINE MODEL / TYPE: GENERAL ELECTRIC -GE FRAME 9E - PG9171(E) 50Hz; SINGLE TURBINE DESIGN OUTPUT: 124 MW; DESIGN HEAT RATE: NET HEAT RATE AT GENERATOR TERMINALS KJ/KWH 10 716 ±1%; DLN SYSTEM: DLN1; COMMISSIONING DATE: 2009; SHUT-DOWN DATE: NOVEMBER 2017. WELL PRESERVED TO DATE; TOTAL FIRED TIME: 56500; PLANNED MAINTENANCE DATE: 2012 HOT GAS PATH INSPECTION, 2015 MAJOR INSPECTION; RATED OUTPUT / TERMINAL VOLTAGE: 150 MVA – 15 KV; TRANSFORMERS: STEP UP TRANSFORMER: 153 MVA. AUXILARY EQUIPMENTS: LUBRICATING SYSTEM; AIR PROCESSING UNIT; COOLING WATER SYSTEM; STARTING MEANS SYSTEM; GAS FUEL SYSTEM; FIRE PROTECTION SYSTEM; INLET BLEED HEATING SYSTEM; HYDRAULIC SUPPLY SYSTEM; VENTILATION SYSTEM; COMPRESSOR WASHING SYSTEM; INLET AND EXHAUST SYSTEM. HRSG MODEL / TYPE: NOOTER ERIKSON 212 T/H 41 BARG 435 °C. HRSG MODULES: HP SUPERHEATER 2; HP SUPERHEATER 1; HP EVAPORATOR; HP ECONOMIZER; HP DRUM; PLATFORMS, STAIRS, LADDERS; INTERCONNECTING PIPING AND VALVES; EXHAUST STACK; ECONOMIZER BYPASS SYSTEM. DISMANTLING, PACKING AND LOADING TO TRUCKS WILL TAKE ABOUT 3 MONTHS. GE BORESCOPE INSPECTION REPORT FROM 2019 AFTER SHUTDOWN WILL BE SHARED DURING INSPECTION. MAJOR INSPECTION REPORT FROM 2015 BY GE, WILL BE SHARED DURING INSPECTION. TOTAL FIRED HOURS AT THIS TIME WAS 48,000. EMISSION REPORTS TO BE SHARED DURING INSPECTION. CAN BE OPERATED IN THE EU. FIRED HOURS: 56,500 FIRED STARTS: 120 TURBINE EFFICIENCY: NET HEAT RATE AT GENERATOR TERMINAL IS 10,760 kJ/kWh QUANTITY: 1
Write Your Own Review
You're reviewing:YY-2241 124 MW GE FRAME 9E CHP COMPLETE POWER PLANT, 50 Hz