Search results for: 'COMBINED CYCLE COMPLETE POWER PLANT'
- Related search terms
- Complete
- Complete p
- Complete ca
- Complete T
- complete a
-
TT-1818 SIEMENS COMBINED CYCLE COMPLETE POWER PLANT, 420 MW, YEAR 2009 TO 2010TT-1818 SIEMENS COMBINED CYCLE COMPLETE POWER PLANT, 420 MW, YEAR 2009 TO 2010 SIEMENS ELECTRIC YEAR 2009 TO 2010 COMBINED CYCLE COMPLETE POWER PLANT 420 MW COMBINED CYCLE PLANT USED IMMEDIATE DELIVERY Learn More -
C-3994 BARGEMOUNTED POWER PLANT, CAPACITY 220MWC-3994 BARGEMOUNTED POWER PLANT, CAPACITY 220MW
A. ONCE THROUGH STEAM GENERATOR
B. BARGE
C. CHILLERS
D. AIR COMPRESSOR
E. GAS TURBINE
F. STEAM TURBINE
G. FEEDWATER SYSTEM
H. CLOSED COOLING WATER SYSTEM
I. AUXILIARY COOLING WATER SYSTEM
J. CONDENSATE POLISHING UNIT (CPU)
K. WASTE WATER SYSTEM
L. PLANT ELECTRICAL SYSTEM
M. BLACK START DG SET
N. PLANT CONTROLS AND INSTRUMENTATION
O. PLANT FIRE FIGHTING SYSTEM
P. START UP VACUUM SYSTEM
Q. STEAM TURBINE DEAERATING CONDENSERQUANTITY: 1 PLANT
Learn More -
M-4835 POWER AND INDUSTRIAL PLANTS FOR SALEREFERENCE NUMBER: M-4835 (1111VEHJXX10) L POWER AND INDUSTRIAL PLANTS FOR SALE QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 230 COMBINED CYCLE GAS TURBINE POWER PLANT SIEMENS V94-2 1988 1 220 COMBINED CYCLE POWER PLANT 50 HZ, FUEL: DUAL FUEL (NATURAL GAS OR HFO/DIESEL) GE FRAME 6B CCPP 1992, RUNNING HOURS: 135 000, PREUSED 1 180 GAS TURBINE 125 MW, STEAM TURBINE 55 MW, 50 HZ, FUEL LFO AND NG GE FRAME 9E CCPP 2005, RUNNING HOURS: 2000 2 128 COMPLETE POWER PLANTS, 15 KV, FUEL: NATURAL GAS AND LIGHT OIL GE FRAME PG9171E NEW 2 127 GAS TURBINE PACKAGES FIAT AVIO MODEL TG 50 – D5 1998,DISMANTLED, OVERHAULED, UPGRADED FROM SIEMENS AND DISMANTLED 2 125 COMPLETE PLANT, 2 UNITS ABB GAS TURBINE PACKAGES, FUEL: DUAL FUEL, 50 HZ ABB, 50WT 18H-66 1995, JUST OVERHAULED, WARRANTY POSSIBLE 1 93 COMBINED CYCLE POWER PLANT. FUEL : NATURAL GAS GE FRAME 6FA 1997 MAJOR INSPECTION IN 2009 1 73 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. SIEMENS WESTINGHOUSE AND MITSUBISHI. 1999, RUNNING HOURS 97 000 1 70 COMBINED CYCLE POWER PLANT THOMASSEN/ABB 2009, RUNNING HOURS UNDER 90 000 CONDITION GOOD, 2009 OVERHAULED 5 66 GAS TURBINE PACKAGES, 50 OR 60 HZ ROLLS ROYCE, TRENT 60 2014, RUNNING HOURS ZERO 3 49 GAS TURBINE POWER PLANT, 50 HZ 3 UNITS GE LM 6000 PC 2004, RUNNING HOURS 6000 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 46 COMPLETE PLANT, INCLUDES 5 GAS TURBINE PACKAGES, INCLUDING 1 STEAM TURBINE, BOILER AND AUXILIARIES. FUEL: NATURAL GAS AND NAPHTA. 50 HZ. SIEMENS TYPHOON AND ALSTOM. 2000, LOW HOURS, STILL IN OPERATION 1 42 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. GE LM 6000PA 1997, LAST HOT END OVERHAUL WAS AT 86.080 HOURS IN AUG 2010 1 41 GAS TURBINE PACKAGE WITH HRSG, 50HZ FUEL: NATURAL GAS/FUEL OIL THOMASSEN PG-6541 1995, LAST OVERHAUL AT 118350 1 40 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS AND LIGHT OIL. 50 HZ. GE FRAME 6 B, DRY LOW NOX 1992, RECENTLY OVERHAULED, STILL GOOD FOR MORE THAN 24.000 RUNNING HOURS. READY TO SHIP. 5 37 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ SGT 750 SIEMENS NEW, ZERO HOURS 1 31,2 GAS TURBINE PACKAGES, 31,2 MW , 50/60 HZ, SGT 700 NEW, ZERO HOURS 5 31 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ GE TM2500 NEW 1 29,65 GAS TURBINE GENERATOR, 50 HZ, 11 KV SGT 700 2011, RUNNING HOURS ZERO (NEW) 1 27 COMBINED CYLE POWER PLANT, 27 MW, NATURAL GAS GE RLM 2500 PE AND ALSTOM STEAM TURBINE GAS TURBINE 1994, STEAM TURBINE 1996 1 26,59 GAS TURBINE, FUEL: GAS FRAME 5, PG-5371 PA 1995, RUNNING HOURS 174,104 4 24,6 CORE ENGINE FUEL: NATURAL GAS, 50 HZ SIEMENS SGT 600 (EX ABB GT 10B) 1994-1997, ZERO HOUR OVERHAULED 1 16 GAS TURBINE PACKAGE DUEAL FUEL ROLLS ROYCE AVON 1534-102L ZERO HOUR OVERHAULED IN 2008 1 14,25 NATURAL GAS ENGINE SOLAR TITAN 130 SOLONOX, 50 HZ TURBOMACH T19501 2007, ZERO RUNNING HOURS, AS NEW 3 12,9 GAS TURBINES SIEMENS, 60 HZ SIEMENS SGT 400 2014, NEW NEVER USED 1 11,86 GAS TURBINE, 60 HZ SOLAR MARS 100 15000 SOLONOX 1996, RUNNING HOURS 34 000 SINCE LAST OVERHAUL 2 9,2 CHP PLANT ELECTRIC, NATURAL GAS AND LIGHT DIESEL&BOTH SOLAR CENTAUR 50 T5701 2005 AND 2008, RUNNING HOURS 26 000 AND 2 500 1 8,8 COMBINED CYCLE GAS TURBINE POWER PLANT. 60 HZ. SOLAR MARS 90. 1989, LAST MAJOR OVERHAUL IN 2004, ONLY 1225 RUNNING HOURS 1 7,5 NATURAL GAS ENGINE SOLAR TAURUS T70, 50 HZ TURBOMACH SOLONOX + WHRB 2007, ZERO RUNNING HOURS AS NEW 1 5,5 GAS TURBINE, 50 HZ, NATURAL GAS SGT 200 1989, RUNNING HOURS 126 340 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 5,2 DUAL NATURAL GAS AND OIL ENGINE TAURUS 60, 50 HZ SOLAR TAURUS 60, SOLONOX T7301 1998, RUNNING HOURS17 700 1 1,4 GAS TURBINE PACKAGE INCL. HRSG, 50 HZ KAWASAKI KA 1334 1995, RUNNING HOURS AFTER MAJOR OVERHAUL 4000 Learn More -
YY-3149 420 MW COMBINED CYCLE POWER PLANTYY-3149 420 MW COMBINED CYCLE POWER PLANT 1 NO. - 420 MW SIEMENS ELECTRIC (2009/10), COMBINED CYCLE COMPLETE POWER PLANT, HAVING THE FOLLOWING TECHNICAL SPECIFICATIONS: Learn More -
YY-2535 GE LM6000PA 42+7MW CHP PLANTYY-2535 GE LM6000PA 42+7MW CHP PLANT THE EXTENSIVE LIST OF ACCOMPANYING EQUIPMENT INCLUDES: 1. GE LM6000PA GAS TURBINE EQUIPPED WITH WATER INJECTION, PAIRED WITH A BRUSH ALTERNATOR WITH 42 MW OUTPUT CAPACITY. THIS GAS TURBINE SUPPORTS NATURAL GAS OR DISTILLATE FUEL. 2. GT MK V CONTROL UNIT WITH AUXILIARY SYSTEMS. 3. SIEMENS BACK PRESSURE STEAM TURBINE WITH 7MW OUTPUT CAPACITY. 4. NOOTER ERIKSON HRSG CAPABLE OF SUPPLEMENTARY FIRING WITH NATURAL GAS OR DISTILLATE FUEL. 5. DUAL BELLIS AND MORCOM THREE-STAGE RECIPROCATING NATURAL GAS COMPRESSORS. 6. WATER TREATMENT PLANT COMPOSED OF TWIN BED RESIN EXCHANGE UNITS AND MIXED BED UNITS. 7. MASSIVE STORAGE TANKS FOR DISTILLATE OIL AND HEAVY FUEL OIL, COMPLETE WITH NECESSARY PIPING AND PUMPS. 8. TWO 11/132 KV TRANSFORMERS RATED AT 40 MVA EACH. 9. STANDBY DIESEL GENERATOR FOR BACKUP POWER. 10. SERCK DISTRIBUTED CONTROL SYSTEM (DCS) FOR INTEGRATED CONTROL AND MONITORING. 11. THREE CONTROL AND GENERAL SERVICE AIR COMPRESSORS. 12. AN EXTENSIVE FIRE DETECTION AND SUPPRESSION SYSTEM, SECURITY CAMERAS, AND GAS DETECTION SYSTEM FOR SAFETY AND SECURITY. 13. A CBISS CONTINUOUS EMISSIONS MONITORING SYSTEM (CEMS) TO ENSURE ADHERENCE TO ENVIRONMENTAL STANDARDS. ALL THE NECESSARY CABLING, TRANSFORMERS, SWITCHGEAR, AND PRESSURE-REDUCING STATIONS ASSOCIATED WITH THE ABOVE-MENTIONED PLANT ARE INCLUDED. A BONUS OF UNIQUE SPARE PARTS, EXTENSIVE MANUALS, RECORDS, AND DRAWINGS ARE ALSO PART OF THE PACKAGE, ENSURING SMOOTH OPERATION AND MAINTENANCE. A GE LM6000PA CHP PLANT REPRESENTS A ROBUST, EFFICIENT SOLUTION TO YOUR POWER AND HEATING NEEDS, OFFERING THE RELIABILITY AND FLEXIBILITY NEEDED FOR YOUR OPERATIONS. QUANTITY: 1 UNIT AVAILABLE FOR PURCHASE Learn More -
TT-4060-B GENERAL ELECTRIC LM2500 SAC COMPLETE POWER PLANT, 22MW, YEAR 2022, 5000 HOURS, 50HzTT-4060-B GENERAL ELECTRIC LM2500 SAC COMPLETE POWER PLANT, 22MW, YEAR 2022, 5000 HOURS, 50Hz WE OFFER TWO TURBINES AND GENERATOR ALONE OR THE TURBINE ALONE, GENERATION 2 QUANTITY: 2 Learn More