Search results for: 'Siemens Sgt-r'
- Related search terms
- Siemens gen
- Siemens sgt
- siemens gas turbine
- SIEMENS GAS TURBINE'
- SIEMENS++GAS+TURBINE
- TT-2153 SIEMENS SGT-800 GAS TURBINE, 54 MW, 11 KV, 50 Hz AND 1500 RPM, FUEL NATURAL GAS, FREQUENCY 50/60 HzTT-2153 SIEMENS SGT-800 GAS TURBINE, 54 MW, 11 KV, 50 Hz AND 1500 RPM, FUEL NATURAL GAS, FREQUENCY 50/60 Hz GROSS EFFICIENCY 38.86.0% HEAT RATE9, 256 KJ/KWH UNUSED CONDITION: EXCELLENT (NEW SURPLUS) TURBINES STORED TO SIEMENS RECOMMENDATION. NOTE: THIS IS A PACKAGE DEAL AND REQUIRES BUYER TO PURCHASE ALL 3 UNITS. POI AND POF REQUIRED UPFRONT. QUANTITY: 3 Learn More
- YY-3513 SIEMENS SGT-600 GAS TURBINES, 24.5 MW EACH, 1.500 RPM, 9 TURBINESYY-3513 SIEMENS SGT-600 GAS TURBINES, 24.5 MW EACH, 1.500 RPM, 9 TURBINES SIEMENS SGT-600 GAS TURBINES (AS-IS, WHERE-IS BASIS) POWER OUTPUT: 24.5 MW EACH FREQUENCY: 50 Hz VOLTAGE: 11 KV RPM: 1.500 RPM QUANTITY: 9 Learn More
- T-1652 SGT 400 GAS TURBINE, 50Hz, YEAR 2017, 11 KV, 12.9 MWT-1652 SGT 400 GAS TURBINE, 50Hz, YEAR 2017, 11 KV, 12.9 MW SGT 400 GAS TURBINE TYPE: STANDARD BRAND: SIEMENS CATEGORY: ENGINES/GENERATORS/MOTORS/TRANSMISSIONS SUBCATEGORY: TURBINE IN STOCK: YES CONDITION: EXCELLENT TYPE: UNUSED SGT-400 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOM: UNIT(S) TO BE SUPPLIED ARE UNUSED, WITH ZERO RUNNING HOURS, NEVER INSTALLED THESE UNITS HAVE BEEN STORED INDOORS SINCE MANUFACTURE. QUANTITY: 2 Learn More
- YY-3559 13 MW SIEMENS SGT-400 NATURAL GAS TURBINE GENSET 22 PICES 2022 NEW – UNUSEDYY-3559 13 MW SIEMENS SGT-400 NATURAL GAS TURBINE GENSET 22 PICES 2022 NEW – UNUSED DETAILS: 1. MANUFACTURER SIEMENS 2. MODEL SGT-400 3. YEAR 2022 4. CONDITION NEW 5. CATEGORY NATURAL GAS TURBINES 6. SUBCATEGORIES 10 - 99 MW 7. WATTAGE 13 MW 8. HOURS ZERO 9. FREQUENCY 50 Hz 10. FUEL TYPE NATURAL GAS 11. VOLTAGE 230 V 12. SIZE (L X W X H) 14.0 X 3.1 X 4.3 M 13. WEIGHT APPROX. 84 TON Learn More
- YY-3558 13 MW SIEMENS SGT-400 NATURAL GAS TURBINE GENSET 12 PICES 2022 NEW UNUSEDYY-3558 13 MW SIEMENS SGT-400 NATURAL GAS TURBINE GENSET 12 PICES 2022 NEW UNUSED DETAILS: 1. MANUFACTURER SIEMENS 2. MODEL SGT-400 3. YEAR 2022 4. CONDITION NEW 5. CATEGORY NATURAL GAS TURBINES 6. SUBCATEGORIES 10 - 99 MW 7. WATTAGE 13 MW 8. HOURS ZERO 9. FREQUENCY 50 Hz 10. FUEL TYPE NATURAL GAS 11. VOLTAGE 230 V 12. SIZE (L X W X H) 14.0 X 3.1 X 4.3 M 13. WEIGHT APPROX. 84 TON Learn More
- YY-3279 SGT – 600 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOMYY-3279 SGT – 600 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOM UNIT(S) TO BE SUPPLIED ARE UNUSED, WITH ZERO RUNNING HOURS, NEVER INSTALLED. Learn More
- M-4835 POWER AND INDUSTRIAL PLANTS FOR SALEREFERENCE NUMBER: M-4835 (1111VEHJXX10) L POWER AND INDUSTRIAL PLANTS FOR SALE QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 230 COMBINED CYCLE GAS TURBINE POWER PLANT SIEMENS V94-2 1988 1 220 COMBINED CYCLE POWER PLANT 50 HZ, FUEL: DUAL FUEL (NATURAL GAS OR HFO/DIESEL) GE FRAME 6B CCPP 1992, RUNNING HOURS: 135 000, PREUSED 1 180 GAS TURBINE 125 MW, STEAM TURBINE 55 MW, 50 HZ, FUEL LFO AND NG GE FRAME 9E CCPP 2005, RUNNING HOURS: 2000 2 128 COMPLETE POWER PLANTS, 15 KV, FUEL: NATURAL GAS AND LIGHT OIL GE FRAME PG9171E NEW 2 127 GAS TURBINE PACKAGES FIAT AVIO MODEL TG 50 – D5 1998,DISMANTLED, OVERHAULED, UPGRADED FROM SIEMENS AND DISMANTLED 2 125 COMPLETE PLANT, 2 UNITS ABB GAS TURBINE PACKAGES, FUEL: DUAL FUEL, 50 HZ ABB, 50WT 18H-66 1995, JUST OVERHAULED, WARRANTY POSSIBLE 1 93 COMBINED CYCLE POWER PLANT. FUEL : NATURAL GAS GE FRAME 6FA 1997 MAJOR INSPECTION IN 2009 1 73 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. SIEMENS WESTINGHOUSE AND MITSUBISHI. 1999, RUNNING HOURS 97 000 1 70 COMBINED CYCLE POWER PLANT THOMASSEN/ABB 2009, RUNNING HOURS UNDER 90 000 CONDITION GOOD, 2009 OVERHAULED 5 66 GAS TURBINE PACKAGES, 50 OR 60 HZ ROLLS ROYCE, TRENT 60 2014, RUNNING HOURS ZERO 3 49 GAS TURBINE POWER PLANT, 50 HZ 3 UNITS GE LM 6000 PC 2004, RUNNING HOURS 6000 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 46 COMPLETE PLANT, INCLUDES 5 GAS TURBINE PACKAGES, INCLUDING 1 STEAM TURBINE, BOILER AND AUXILIARIES. FUEL: NATURAL GAS AND NAPHTA. 50 HZ. SIEMENS TYPHOON AND ALSTOM. 2000, LOW HOURS, STILL IN OPERATION 1 42 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. GE LM 6000PA 1997, LAST HOT END OVERHAUL WAS AT 86.080 HOURS IN AUG 2010 1 41 GAS TURBINE PACKAGE WITH HRSG, 50HZ FUEL: NATURAL GAS/FUEL OIL THOMASSEN PG-6541 1995, LAST OVERHAUL AT 118350 1 40 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS AND LIGHT OIL. 50 HZ. GE FRAME 6 B, DRY LOW NOX 1992, RECENTLY OVERHAULED, STILL GOOD FOR MORE THAN 24.000 RUNNING HOURS. READY TO SHIP. 5 37 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ SGT 750 SIEMENS NEW, ZERO HOURS 1 31,2 GAS TURBINE PACKAGES, 31,2 MW , 50/60 HZ, SGT 700 NEW, ZERO HOURS 5 31 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ GE TM2500 NEW 1 29,65 GAS TURBINE GENERATOR, 50 HZ, 11 KV SGT 700 2011, RUNNING HOURS ZERO (NEW) 1 27 COMBINED CYLE POWER PLANT, 27 MW, NATURAL GAS GE RLM 2500 PE AND ALSTOM STEAM TURBINE GAS TURBINE 1994, STEAM TURBINE 1996 1 26,59 GAS TURBINE, FUEL: GAS FRAME 5, PG-5371 PA 1995, RUNNING HOURS 174,104 4 24,6 CORE ENGINE FUEL: NATURAL GAS, 50 HZ SIEMENS SGT 600 (EX ABB GT 10B) 1994-1997, ZERO HOUR OVERHAULED 1 16 GAS TURBINE PACKAGE DUEAL FUEL ROLLS ROYCE AVON 1534-102L ZERO HOUR OVERHAULED IN 2008 1 14,25 NATURAL GAS ENGINE SOLAR TITAN 130 SOLONOX, 50 HZ TURBOMACH T19501 2007, ZERO RUNNING HOURS, AS NEW 3 12,9 GAS TURBINES SIEMENS, 60 HZ SIEMENS SGT 400 2014, NEW NEVER USED 1 11,86 GAS TURBINE, 60 HZ SOLAR MARS 100 15000 SOLONOX 1996, RUNNING HOURS 34 000 SINCE LAST OVERHAUL 2 9,2 CHP PLANT ELECTRIC, NATURAL GAS AND LIGHT DIESEL&BOTH SOLAR CENTAUR 50 T5701 2005 AND 2008, RUNNING HOURS 26 000 AND 2 500 1 8,8 COMBINED CYCLE GAS TURBINE POWER PLANT. 60 HZ. SOLAR MARS 90. 1989, LAST MAJOR OVERHAUL IN 2004, ONLY 1225 RUNNING HOURS 1 7,5 NATURAL GAS ENGINE SOLAR TAURUS T70, 50 HZ TURBOMACH SOLONOX + WHRB 2007, ZERO RUNNING HOURS AS NEW 1 5,5 GAS TURBINE, 50 HZ, NATURAL GAS SGT 200 1989, RUNNING HOURS 126 340 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 5,2 DUAL NATURAL GAS AND OIL ENGINE TAURUS 60, 50 HZ SOLAR TAURUS 60, SOLONOX T7301 1998, RUNNING HOURS17 700 1 1,4 GAS TURBINE PACKAGE INCL. HRSG, 50 HZ KAWASAKI KA 1334 1995, RUNNING HOURS AFTER MAJOR OVERHAUL 4000 Learn More
- TT-1508 SIEMENS SGT-800 GENERATOR SET, 50 Hz, 47.5 MWTT-1508 SIEMENS SGT-800 GENERATOR SET, 50 Hz, 47.5 MW GAS TURBINE GENERATOR PLANT THIS USED SGT GENSET HAS FORMERLY BEEN USED BY A PAPER FACTORY AND HAS BEEN PROFESSIONALLY DISMANTLED AND PACKED BY THE ORIGINAL MANUFACTURER SIEMENS IN MARCH 2022. QUANTITY: 2 SETS Learn More
- J-4827 SIEMENS SGT5-4000F / V94.3A(1), 187,500 KW EACH, DUAL FUEL (GAS/DIESEL), 50 HzJ-4827 SIEMENS SGT5-4000F / V94.3A(1), 187,500 KW EACH, DUAL FUEL (GAS/DIESEL), 50 Hz NO SPLIT SALE POSSIBLE, MUST BUY ALL 3 UNITS TOGETHER MAKE: SIEMENS MODEL: SGT5-400F / V94.3A(1) ISO RATED CAPACITY: 187,500 KW EACH FUEL: DUAL FUEL (GAS AND DIESEL) GENERATOR MANUFACTURER: SIEMENS FREQUENCY: 50 Hz RATED CAPACITY: 221 MVA YEAR: 1999 QUANTITY: 3 Learn More
- YY-2985 COMPLETE AND UNUSED SGT-400 50Hz GAS TURBINE DRIVEN GENERATOR PACKAGESYY-2985 COMPLETE AND UNUSED SGT-400 50Hz GAS TURBINE DRIVEN GENERATOR PACKAGES THE SIEMENS SGT-400 FAST POWER GAS TURBINE GENERATOR SET IS A SYSTEM DESIGNED FOR RAPID DEPLOYMENT. QUANTITY: 5 Learn More