Search results for: 'gas c'
-
YY-2208 HUMAN CREMATION MACHINE, LIGHT DIESEL FUEL, GAS, NATURAL GAS, LIQUEFIED GASYY-2208 HUMAN CREMATION MACHINE, LIGHT DIESEL FUEL, GAS, NATURAL GAS, LIQUEFIED GAS DETAILS: 1. INCORPORATES EFFICIENT HEAT EXCHANGER AND SPECIAL AIR PATH STRUCTURE, MAKE FULL USE OF WASTE HEAT COMBUSTION FUEL GAS, IMPROVING HEAT UTILIZATION RATE, GOOD ENVIRONMENTAL PROTECTION INDEX, SAVES FUEL AND SHORTENS CREMATION TIME. 2. NEW REFRACTORY MATERIALS (EXCLUSIVE FORMULA) THAT ARE RESISTANT TO HIGH TEMPERATURE WITH LOW SPECIFIC HEAT. GREATLY EXTEND THE SERVICE LIFE. 3. SPECIAL CASTING MATERIAL, HIGH TEMPERATURE RESISTANCE, LONG SERVICE LIFE; SHORTENS THE COOLING CYCLE. THE BRICK STRUCTURE ON BOTH SIDES OF THE ASH PICKING FURNACE DOOR WILL NOT HAVE CRACKS CAUSED BY DESIGN OR QUALITY PROBLEMS GUARANTEED FOR ONE YEAR. REFRACTORY MATERIALS, THE FURNACE CONTACT ARE WITH FLAME HAS PHOSPHORIC ACID A CHARACTERISTIC COMBINATION BRICK WHICH CAN RESIST RAPID COOLING AND RAPID HEAT, AND THE ARCHED ROOF INCORPORATES HIGH ALUMINUM SINTERED MOLDING BRICK. THE FURNACE BODY IS SURROUNDED BY ALUMINUM SILICATE WOOL WITH GOOD HEAT INSULATION AND HEAT PRESERVATION PERFORMANCE. THE THICKNESS IS 180mm. 4. ALL OPERATING SYSTEMS OF THE EQUIPMENT HAVE THREE SETS OF OPERATION FUNCTIONS, NAMELY AUTOMATIC, SEMI-AUTOMATIC AND MANUAL, WHICH CAN BE SWITCH BETWEEN THEM WITHOUT INTERFERENCE. AUTOMATIC CONTROL, TELECOMMUNICATION OPERATION AND ANIMATION DISPLAY. KEEPING THE OPERATOR AWAY FROM THE CREMATION SITE AND PROTECTING THE OPERATOR. AT THE SAME TIME EQUIPPED WITH A STANDBY OPERATING SYSTEM. LOW NOISE MOTOR EQUIPMENT, THERMOCOUPLE RESISTANCE TO HIGH TEMPERATURE. ALL ELECTRICAL CABINETS OF THE EQUIPMENT ARE EXTERNAL. 5. THE OIL SUPPLY SYSTEM INCORPORATES AUTOMATIC CONTROL AND MANUAL CONTROL, AND INCORPORATES OIL PROTECTION TECHNOLOGY, WHICH CAN EFFECTIVELY PREVENT FUEL OIL FROM RUNNING, BUBBLING, LEAKING AND CAUSING FURNACE EXPLOSION ACCIDENTS INCLUDING ANTI-LEAKAGE TECHNOLOGY TO BETTER PROTECT THE PERSONAL SAFETY OF OPERATORS. 6. THE BLOWER, THE INDUCED DRAFT FAN, THE FURNACE DOOR MOTOR, THE BODY CART MOTOR, THE PREPARATORY DOOR MOTOR AND THE FLUE GATE MOTOR ARE ALL INSTALLED WITH AN INTEGRATED DEVICE FOR OVER-CURRENT AND SHORT-CIRCUIT PROTECTION. 7. SPECIAL DIESEL METERING DEVICE, ACCURATE METERING. QUANTITY: 1 Learn More -
TT-6597 MTU OPEN TYPE NATURAL GAS GENERATORS, 1.5 MW, 50Hz EXCELLENT FULL DESCRIPTION OF A GENERATORTT-6597 MTU OPEN TYPE NATURAL GAS GENERATORS, 1.5 MW, 50Hz EXCELLENT FULL DESCRIPTION OF A GENERATOR QUANTITY: 10 Learn More -
TT-7050 ROLLS ROYCE GAS TURBINE, 4 MW, YEAR 1999, YEAR 2011, NATURAL GAS, CORE ENGINETT-7050 ROLLS ROYCE GAS TURBINE, 4 MW, YEAR 1999, YEAR 2011, NATURAL GAS, CORE ENGINE 1. YEAR OPERATIONAL PERIOD: 1999 TO 2011 2. TOTAL RUNNING HOURS: 39,500 HOURS 3. BRAND: ROLLS ROYCE - ALLISON 4. TYPE: 501 KB5S-LE4 5. ASSEMBLED/ENCAPSULATED BY: TURBOMECA (FRANCE) 6. ABSORBED POWER (GAS): 13.6 MW 7. FUELS/OXIDIZER: NATURAL GAS AT 19 BAR, AIR (FILTERED) QUANTITY: 1 Learn More -
TT-3855 CUMMINS NATURAL GAS GENERATOR SET, 1.4MW, 1400 KW, NATURAL GAS, YEAR 2017, 50Hz/60HzTT-3855 CUMMINS NATURAL GAS GENERATOR SET, 1.4MW, 1400 KW, NATURAL GAS, YEAR 2017, 50Hz/60Hz SERIES ENGINE MODEL C1400 N6C. USED YEAR 2017 SYSTEM INCLUDES BUILDING, COOLING SYSTEM, TRANSFORMER. TOTAL HOURS: 5400 1400 KW USED AS BACK UP GENERATOR WEIGHT: 28,300 LBS. Learn More -
TT-4534 CATERPILLAR G3520C GAS ENGINE, 2 MW, 11,000 VOLTS, NATURAL GASTT-4534 CATERPILLAR G3520C GAS ENGINE, 2 MW, 11,000 VOLTS, NATURAL GAS ASK FOR MORE DETAILS ! QUANTITY: 4 Learn More -
M-3804 NATURAL GAS FIRED CHP PLANT WITH PERKINS 815KW GAS GENERATORSREFERENCE NUMBER: M-3804
NATURAL GAS FIRED CHP PLANT WITH PERKINS 815KW GAS GENERATORS
NATURAL GAS FIRED CHP PLANT
WITH PERKINS 2 X 815KW / 50HZ GAS GENERATORS
DELIVERED BY AUTHORIZED PERKINS DEALER IN YEAR 2008 – BUT NEWER, NEVER STARTED
GENERATOR DRIVERS 2 X PERKINS V16 CYLINDER / 1500 RPM GAS ENGINES TYPE 4016 TESI
COMPLETE PLANT, ELECTRICAL OUTPUT 2 X 815KW 400 / 230 V / 50 HZ FROM ALTERNATORS
HEAT RECOVERY FOR 80 C DEGREE WATER, CAPACITY 1400 KWTH
EQUIPMENT IS IN VERY GOOD, LIKE NEW CONDITION
Learn More -
NATURAL GAS FIRED CHP PLANT WITH JENBACHER 995KW 50HZ GAS GENERATORNATURAL GAS FIRED CHP PLANT WITH JENBACHER 995KW / 50HZ GAS GENERATOR DELIVERED IN YEAR 1997, TOTAL OPERATING HOURS 55,000 GENERATOR DRIVER JENBACHER 20 CYLINDER / 1500 RPM GAS ENGINES TYPE J320 GS N.L. COMPLETE PLANT, ELECTRICAL OUTPUT 995KW 400 / 230V / 40HZ FROM ALTERNATORS HEAT RECOVERY FOR 80 C DEGREE WATER AND STEAM BOILER 6 T/H AT 10 BAR ( SUPPL. FIRED) EQUIPMENT IS STILL INSTALLED AND IN A FAIR CONDITION Learn More -
TT-5202 JENBACHER GAS GENERATOR COMPLETE POWER PLANT, 3760 KV, GAS GENERATOR, JMS 616 GS/N L, YEAR 2010, 50 HzTT-5202 JENBACHER GAS GENERATOR COMPLETE POWER PLANT, 3760 KV, GAS GENERATOR, JMS 616 GS/N L, YEAR 2010, 50 Hz HOURS (1) 8445 (2) 12442 (3) 28397 (4) 32858 ALL ACCESSORIES AVAILABLE QUANTITY: 4 Learn More -
M-4835 POWER AND INDUSTRIAL PLANTS FOR SALEREFERENCE NUMBER: M-4835 (1111VEHJXX10) L POWER AND INDUSTRIAL PLANTS FOR SALE QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 230 COMBINED CYCLE GAS TURBINE POWER PLANT SIEMENS V94-2 1988 1 220 COMBINED CYCLE POWER PLANT 50 HZ, FUEL: DUAL FUEL (NATURAL GAS OR HFO/DIESEL) GE FRAME 6B CCPP 1992, RUNNING HOURS: 135 000, PREUSED 1 180 GAS TURBINE 125 MW, STEAM TURBINE 55 MW, 50 HZ, FUEL LFO AND NG GE FRAME 9E CCPP 2005, RUNNING HOURS: 2000 2 128 COMPLETE POWER PLANTS, 15 KV, FUEL: NATURAL GAS AND LIGHT OIL GE FRAME PG9171E NEW 2 127 GAS TURBINE PACKAGES FIAT AVIO MODEL TG 50 – D5 1998,DISMANTLED, OVERHAULED, UPGRADED FROM SIEMENS AND DISMANTLED 2 125 COMPLETE PLANT, 2 UNITS ABB GAS TURBINE PACKAGES, FUEL: DUAL FUEL, 50 HZ ABB, 50WT 18H-66 1995, JUST OVERHAULED, WARRANTY POSSIBLE 1 93 COMBINED CYCLE POWER PLANT. FUEL : NATURAL GAS GE FRAME 6FA 1997 MAJOR INSPECTION IN 2009 1 73 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. SIEMENS WESTINGHOUSE AND MITSUBISHI. 1999, RUNNING HOURS 97 000 1 70 COMBINED CYCLE POWER PLANT THOMASSEN/ABB 2009, RUNNING HOURS UNDER 90 000 CONDITION GOOD, 2009 OVERHAULED 5 66 GAS TURBINE PACKAGES, 50 OR 60 HZ ROLLS ROYCE, TRENT 60 2014, RUNNING HOURS ZERO 3 49 GAS TURBINE POWER PLANT, 50 HZ 3 UNITS GE LM 6000 PC 2004, RUNNING HOURS 6000 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 46 COMPLETE PLANT, INCLUDES 5 GAS TURBINE PACKAGES, INCLUDING 1 STEAM TURBINE, BOILER AND AUXILIARIES. FUEL: NATURAL GAS AND NAPHTA. 50 HZ. SIEMENS TYPHOON AND ALSTOM. 2000, LOW HOURS, STILL IN OPERATION 1 42 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. GE LM 6000PA 1997, LAST HOT END OVERHAUL WAS AT 86.080 HOURS IN AUG 2010 1 41 GAS TURBINE PACKAGE WITH HRSG, 50HZ FUEL: NATURAL GAS/FUEL OIL THOMASSEN PG-6541 1995, LAST OVERHAUL AT 118350 1 40 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS AND LIGHT OIL. 50 HZ. GE FRAME 6 B, DRY LOW NOX 1992, RECENTLY OVERHAULED, STILL GOOD FOR MORE THAN 24.000 RUNNING HOURS. READY TO SHIP. 5 37 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ SGT 750 SIEMENS NEW, ZERO HOURS 1 31,2 GAS TURBINE PACKAGES, 31,2 MW , 50/60 HZ, SGT 700 NEW, ZERO HOURS 5 31 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ GE TM2500 NEW 1 29,65 GAS TURBINE GENERATOR, 50 HZ, 11 KV SGT 700 2011, RUNNING HOURS ZERO (NEW) 1 27 COMBINED CYLE POWER PLANT, 27 MW, NATURAL GAS GE RLM 2500 PE AND ALSTOM STEAM TURBINE GAS TURBINE 1994, STEAM TURBINE 1996 1 26,59 GAS TURBINE, FUEL: GAS FRAME 5, PG-5371 PA 1995, RUNNING HOURS 174,104 4 24,6 CORE ENGINE FUEL: NATURAL GAS, 50 HZ SIEMENS SGT 600 (EX ABB GT 10B) 1994-1997, ZERO HOUR OVERHAULED 1 16 GAS TURBINE PACKAGE DUEAL FUEL ROLLS ROYCE AVON 1534-102L ZERO HOUR OVERHAULED IN 2008 1 14,25 NATURAL GAS ENGINE SOLAR TITAN 130 SOLONOX, 50 HZ TURBOMACH T19501 2007, ZERO RUNNING HOURS, AS NEW 3 12,9 GAS TURBINES SIEMENS, 60 HZ SIEMENS SGT 400 2014, NEW NEVER USED 1 11,86 GAS TURBINE, 60 HZ SOLAR MARS 100 15000 SOLONOX 1996, RUNNING HOURS 34 000 SINCE LAST OVERHAUL 2 9,2 CHP PLANT ELECTRIC, NATURAL GAS AND LIGHT DIESEL&BOTH SOLAR CENTAUR 50 T5701 2005 AND 2008, RUNNING HOURS 26 000 AND 2 500 1 8,8 COMBINED CYCLE GAS TURBINE POWER PLANT. 60 HZ. SOLAR MARS 90. 1989, LAST MAJOR OVERHAUL IN 2004, ONLY 1225 RUNNING HOURS 1 7,5 NATURAL GAS ENGINE SOLAR TAURUS T70, 50 HZ TURBOMACH SOLONOX + WHRB 2007, ZERO RUNNING HOURS AS NEW 1 5,5 GAS TURBINE, 50 HZ, NATURAL GAS SGT 200 1989, RUNNING HOURS 126 340 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 5,2 DUAL NATURAL GAS AND OIL ENGINE TAURUS 60, 50 HZ SOLAR TAURUS 60, SOLONOX T7301 1998, RUNNING HOURS17 700 1 1,4 GAS TURBINE PACKAGE INCL. HRSG, 50 HZ KAWASAKI KA 1334 1995, RUNNING HOURS AFTER MAJOR OVERHAUL 4000 Learn More -
K-8177 GAS TURBINES, COMBINED CYCLE POWER PLANTS, DIESEL & GAS ENGINESK-8177 GAS TURBINES, COMBINED CYCLE POWER PLANTS, DIESEL & GAS ENGINES
Learn More