YY-2894 NEW SIEMENS SGT 400, YEAR 2018
SIEMENS SGT 400 (12.9 MW) GAS TURBINE
· 11-STAGE COMPRESSOR, 6 COMBUSTION CHAMBERS, 2-STAGE POWER TURBINE
· GAS FUEL SYSTEM
· DLE COMBUSTION SYSTEM
· HOT-END DRIVE
· 2-SHAFT ENGINE
· LEFT-HAND EXHAUST
· MAIN LUBRICATION PUMP
· EQUIVALENT OPERATING HOURS : 0H
· TOTAL STARTS : 0
· NEW, NEVER INSTALLED OR COMMISSIONED
QUANTITY: 1
Learn More
TT-3267 GENERAL ELECTRIC / AEG-KANIS PG 5341 GAS TURBINE, 50Hz, YEAR 1982
YEAR OF CONSTRUCTION 1982
CONDITION USED
MACHINE TYPE: GAS TURBINE
MANUFACTURER: GE / GENERAL ELECTRIC / AEG-KANIS
MODEL: PG 5341 “P”
YEAR OF CONSTRUCTION: 1982
CONDITION: EXCELLENT (USED)
UPDATE: 12.09.2023
RATED POWER: 25MW (EL)
EXHAUST GAS TEMPERATURE: 486°C
FUEL: FUEL OIL, DIESEL
TOTAL RATED THERMAL INPUT: 88,9 MW
FREQUENCY: 50Hz
SCOPE OF SUPPLY: COMPLETE PLANT WITH 4X: TURBINE-GEARBOX-GENERATOR AND AUXILIARIES
Learn More
YY-2425 LM2500 PE SAC, 22.4 MW, WITH GE 6 STAGE POWER TURBINE, GAS TURBINES, QUANTITY 2
ITEM 001
2500 HOURS AFTER ENGINE OVERHAUL
ITEM 002
6500 HOURS AFTER ENGINE OVERHAUL
Learn More
TT-1886 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz, (16 X 3.2MW), YEAR 2008
KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT
51.2MW 60Hz
(16 X 3.2MW)
MAIN SPECIFICATIONS
GAS TURBINE MODEL: M1T-23
BRAND: KAWASAKI
POWER OUTPUT: 3,200KWE
FREQUENCY & VOLTAGE: 60Hz & 6600V
YEAR OF PRODUCTION: 2008
RUNNING HOURS: ABOUT 60 HOURS
FUEL OIL: NATURAL GAS
PLANT AUXILIARY EQUIPMENT: 1 SET
Learn More
TT-1767 TAURUS T60 TURBINES, 50-60Hz, YEAR 2012
TAURUS T60 TURBINES
TYPE: STANDARD
BRAND: SOLAR
CATEGORY: ENGINES/GENERATORS/MOTORS/TRANSMISSIONS
SUBCATEGORY: TURBINE
TYPE: NEW SURPLUS
CONDITION: EXCELLENT
50Hz NATURAL GAS (CAN CONVERT TO DUAL DIESEL/NG WITH ADDITIONAL CHARGES)
YEAR: 2012
Learn More
T-1652 SGT 400 GAS TURBINE, 50Hz, YEAR 2017, 11 KV, 12.9 MW
SGT 400 GAS TURBINE
TYPE: STANDARD
BRAND: SIEMENS
CATEGORY: ENGINES/GENERATORS/MOTORS/TRANSMISSIONS
SUBCATEGORY: TURBINE
IN STOCK: YES
CONDITION: EXCELLENT
TYPE: UNUSED
SGT-400 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOM:
UNIT(S) TO BE SUPPLIED ARE UNUSED, WITH ZERO RUNNING HOURS, NEVER INSTALLED
THESE UNITS HAVE BEEN STORED INDOORS SINCE MANUFACTURE.
QUANTITY: 2 Learn More
TT-1468 SIEMENS SGT 500 GAS TURBINES – NEW, YEAR 2007, 18.47MW EACH
SGT500 NEW AND NEVER USED UNITS
SIEMENS SGT TURBINES
YEAR 2007
POWER OUTPUT 18.47MW EACH
DUAL FUEL GAS & LIQUID
QUANTITY: 2
Learn More