YY-2894 NEW SIEMENS SGT 400, YEAR 2018
SIEMENS SGT 400 (12.9 MW) GAS TURBINE
· 11-STAGE COMPRESSOR, 6 COMBUSTION CHAMBERS, 2-STAGE POWER TURBINE
· GAS FUEL SYSTEM
· DLE COMBUSTION SYSTEM
· HOT-END DRIVE
· 2-SHAFT ENGINE
· LEFT-HAND EXHAUST
· MAIN LUBRICATION PUMP
· EQUIVALENT OPERATING HOURS : 0H
· TOTAL STARTS : 0
· NEW, NEVER INSTALLED OR COMMISSIONED
QUANTITY: 1
Learn More
TT-1886 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz, (16 X 3.2MW), YEAR 2008
KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT
51.2MW 60Hz
(16 X 3.2MW)
MAIN SPECIFICATIONS
GAS TURBINE MODEL: M1T-23
BRAND: KAWASAKI
POWER OUTPUT: 3,200KWE
FREQUENCY & VOLTAGE: 60Hz & 6600V
YEAR OF PRODUCTION: 2008
RUNNING HOURS: ABOUT 60 HOURS
FUEL OIL: NATURAL GAS
PLANT AUXILIARY EQUIPMENT: 1 SET
Learn More
T-1652 SGT 400 GAS TURBINE, 50Hz, YEAR 2017, 11 KV, 12.9 MW
SGT 400 GAS TURBINE
TYPE: STANDARD
BRAND: SIEMENS
CATEGORY: ENGINES/GENERATORS/MOTORS/TRANSMISSIONS
SUBCATEGORY: TURBINE
IN STOCK: YES
CONDITION: EXCELLENT
TYPE: UNUSED
SGT-400 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOM:
UNIT(S) TO BE SUPPLIED ARE UNUSED, WITH ZERO RUNNING HOURS, NEVER INSTALLED
THESE UNITS HAVE BEEN STORED INDOORS SINCE MANUFACTURE.
QUANTITY: 2 Learn More
YY-3065 TM2500 GAS TURBINE PACKAGE, 23MW, OVERHAULED 2018, WITH SPARE TURBINE LM2500
KEY POINTS:
1. THE UNIT IS IMMEDIATELY OPERATIONAL, FACILITATING SWIFT INITIATION OF POWER GENERATION.
2. UNDERWENT A SIGNIFICANT OVERHAUL IN 2018, WITH ABOUT 14,600 HOURS OF OPERATION SINCE.
3. COMPATIBLE WITH NATURAL GAS AND DIESEL, OFFERING FLEXIBILITY IN FUEL USE.
4. SOLD IN ITS CURRENT CONDITION, INCLUDING EXTRA COMPONENTS (TM2500 SPARE HOT SECTION AND A BRUSH GENERATOR NEEDING OVERHAUL).
QUANTITY AVAILABLE: 1
Learn More