YY-2967 GE 9371FA GAS TURBINE GENERATOR 228.9MW + STEAM TURBINE GENERATOR HARBIN TURBIN/CHINA 127MW, ALTANATOR FOR GT TOSHIBA 299KVA 50Hz, FOR STEAM TURBINE HARBIN 158.824MVA 50Hz
YEAR OF MFG IS 2008 BUT START OPERATION FROM 2012, TOTAL OPERATION HOUR IS 23,000 HOURS. COMPLEX BOROSCOPE INSPECTION MADE ON 2021 AND TOP CONDITION AND NO FURTHER REPAIR MEASURES ARE NECESSARY.
Learn More
TT-7894 GE FRAME 5PA GAS TURBINE GENERATOR – NEW, 26MW, 60 Hz
1. GE FRAME 5PA GAS TURBINE GENERATOR
2. BRAND NEW
3. BRAND: GENERAL ELECTRIC
4. CONDITION: BRAND NEW, NEVER INSTALLED
QUANTITY: 1
Learn More
YY-2311 GE TM2500+ GENERATION 6 GENERATOR PACKAGE – 26 MW EACH, 11,000 V, 50/60 Hz, DIESEL OR NATURAL GAS, YEAR 2011
-AT 50 Hz THE UNITS ARE DESIGNED TO PRODUCE 26 MW OF POWER
-AT 60 Hz THE UNITS ARE DESIGNED TO PRODUCE 30 MW OF POWER
-DEPENDING ON LOCATION TEMPERATURE
-THESE ARE CONTINUOUS POWER UNITS
DETAILS:
1. 31MW CONTINUOUS RATED (GE ADVERTISED AT ISO CONDITIONS);
2. YEAR OF MANUFACTURE: 2011;
3. PACKAGE SN: 2011-TM006 AND 2011-TM008;
4. CURRENTLY CONFIGURED AS 11KV 50HZ, YET CAN OPERATE AT EITHER 50HZ OR 60HZ;
5. 2 UNITS AVAILABLE;
6. EQUIPMENT IS CONFIGURED TO OPERATE ON LIQUID FUEL OR NATURAL GAS;
7. CURRENT OPERATING HOURS AS OF JULY 30, 2022: TM006 – 1726 HOURS TM008 – 2174 HOURS;
8. HOURS REFLECT TOTAL TIME SINCE NEW:
HOURS MAY GO UP AS UNITS ARE STILL CONNECTED FOR EMERGENCY USE ONLY.
9. PRICE INCLUDES THE GT1 REPAIRS RECOMMENDED BY GE IN THE ATTACHED INVESTIGATIVE REPORT;
10. HPT REPLACEMENT ON GT1 ONLY:
- LEAD TIME FOR REPAIRS IS 12-14 WEEKS BASED ON CURRENT AVAILABILITY (SUBJECT TO CHANGE);
- SCOPE OF SUPPLY FOR EACH UNIT IS LISTED IN APPENDIX A.
Learn More
TT-8553 GE TM2500+ GEN 6 DUAL FUEL (NATURAL GAS & DIESEL) TURBINE GENERATOR, 29 MW, YEAR 2012, 50-60 Hz
1. GE TM2500+ GEN 6 DUAL FUEL (NATURAL GAS & DIESEL) TURBINE
2. THIS UNIT DELIVERS FAST, MOBILE POWER, ENSURING A STABLE ENERGY SUPPLY DURING OUTAGES.
3. MOUNTED ON A TRAILER FOR QUICK DEPLOYMENT, IT'S IDEAL FOR BASE LOAD BRIDGING, DISASTER RELIEF, PLANT SHUTDOWNS, AND MAINTENANCE.
4. ITS RELIABLE PERFORMANCE GUARANTEES POWER WHENEVER AND WHEREVER IT IS NEEDED
QUANTITY: 1 Learn More
YY-2961 25 MW GAS TURBINE GENERATOR (GT 10B2 - SGT 600)
BRIEF PLANT HISTORY:
THE GT PACKAGE IS THE FAMOUS GT 10 B2 DLE PG WHICH WAS COMMISSIONED IN 2001 CONSISTING OF GAS TURBINE, GENERATOR AND ALL RELATED AUXILIARIES EQUIPMENT/SYSTEMS. IT IS IN EXCELLENT CONDITION AND AVAILABLE FOR IMMEDIATE SALE AND RELOCATION.
QUANTITY: 3
Learn More
YY-2907 LM2500 PLUS PK- MDWG03 GAS TURBINE-GENERATOR PACKAGES, YEAR 2002, QUANTITY 2, 30 MW, 11 KV, 50 Hz
YEAR OF MANUFACTURE: 2002
YEAR COMMISSIONED: 2005
OPERATING HOURS: 55,000
HOURS AFTER LAST MO: ~5,000 ONLY
STATUS: ON FOUNDATION
FUEL: NATURAL GAS & LIQUID FUEL
QUANTITY: 2 Learn More