TT-7894 GE FRAME 5PA GAS TURBINE GENERATOR – NEW, 26MW, 60 Hz
1. GE FRAME 5PA GAS TURBINE GENERATOR
2. BRAND NEW
3. BRAND: GENERAL ELECTRIC
4. CONDITION: BRAND NEW, NEVER INSTALLED
QUANTITY: 1
Learn More
J-4753 GE FRAME 9E GAS TURBINE GENERATOR UNITS, 109.49 MW
TWO UNITS OF FRAME 9E GAS TURBINE GENERATOR UNITS (CONSISTING OF AUXILIARY COMPARTMENT, TURBINE COMPARTMENT, GENERATOR COMPARTMENT)
TWO UNITS OF MARK V CONTROL SYSTEM
1 UNIT OF GE STEAM TURBINE GENERATOR UNIT (118.26 MW) (CONSISTING OF AUXILIARY COMPARTMENT, STEAM TURBINE COMPARTMENT, GENERATOR COMPARTMENT)
YEAR: 1992
Learn More
TT-7587 SIEMENS TG50D5/W701DS GAS TURBINE GENERATOR, 127.8 MW, YEAR 1995
1. SIEMENS WESTINGHOUSE TG50D5/W701DS 127.8 MW GAS TURBINE GENERATOR PACKAGES FOR SALE. THE TURBINE PACKAGES TOGETHER OFFER 255 MW READY TO SHIP EQUIPMENT. THIS TECHNOLOGY IS ONE OF THE MOST WIDESPREAD MIDDLE SIZE ENGINES (100-104 MW) FOR POWER GENERATION AND THE ONLY TURBINE OF ITS SIZE THAT CAN OPERATE ON HEAVY FUEL OIL (HFO).
2. THE UNITS ARE OFFERED WITH SOME OF THE REQUIRED BALANCE OF PLANT BY SEPARATE NEGOTIATION.
3. THESE UNITS WERE INSTALLED AND OPERATED IN A POWER STATION FROM 1996 UNTIL THE END OF 2004, WHEN THEY WERE DISMANTLED AS THE RESULT OF A PLANT UPGRADE. THE UNITS WERE PURCHASED AND UPGRADED BY THE BUYER TO 127.8 MW NOMINAL CAPACITY EACH. THEY ALSO FULLY REFURBISHED THE UNITS TO ZERO HOURS. THE TURBINES HAVE THE CAPABILITY OF BEING ABLE TO SWITCH BETWEEN NATURAL GAS AND LIQUID FUEL WHILE STILL OPERATING UNDER LOAD.
QUANTITY: 2
Learn More
YY-2907 LM2500 PLUS PK- MDWG03 GAS TURBINE-GENERATOR PACKAGES, YEAR 2002, QUANTITY 2, 30 MW, 11 KV, 50 Hz
YEAR OF MANUFACTURE: 2002
YEAR COMMISSIONED: 2005
OPERATING HOURS: 55,000
HOURS AFTER LAST MO: ~5,000 ONLY
STATUS: ON FOUNDATION
FUEL: NATURAL GAS & LIQUID FUEL
QUANTITY: 2 Learn More
YY-2991 SIEMENS SGT-A05 GAS TURBINE MOBILE GENERATORS, 12 UNITS
MULTIPLE UNITS AVAILABLE
LOW HOUR AERO-DERIVATIVE GAS TURBINE PACKAGES
TOTAL QUANTITY: 12
Learn More