Search results for: 'turbine 1'
- Related search terms
- turbine
- turbines
- turbine generator
- turbine plant
- turbine 10
- K-2539 SIEMENS COMPLETE POWER PLANT 180MW YEAR 2001
K-2539 SIEMENS COMPLETE POWER PLANT 180MW YEAR 2001
MAKE: SIEMENS
2 UNITS V 64.3 SIEMENS GAS TURBINES AND STEAM TURBINE
2 BOILERS AND AUXILIARIES
NATURAL GAS AND LFO
50 HZQUANTITY: 1
Learn More - K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983
K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983
COAL FIRED STEAM POWER PLANT 330 MW
PLANT FOR RELOCATION
EQUIPMENT AND AUXILIARIES IN EXCELLENT CONDITIONSUMMARY OF MAIN ADVANTAGES:
THE STEAM PLANT IS AVAILABLE NOW AND CAN BE REINSTALLED IN SHORT TIME
POWER AVAILABLE IN SHORT TIME
THE EQUIPMENT IS OFFERED AT ATTRACTIVE CONDITIONS
LOW INVESTMENT COST
THE MAIN EQUIPMENT IS BASED ON STATE OF THE ART DESIGN & EMISSION CONTROL
COMMERCIAL LIFE TIME FOR MANY YEARS TO COME
RELOCATION IN COOPERATION WITH OEM SUPERVISING AND GUARANTEES OVERALL CONCEPTTECHNICAL DATA OF BOILER:
OEM
STEAM OUTPUT DESIGN PRESSURE LIVE STEAM REHEAT TEMP FUEL980 T/H
203 BAR
184 BAR / GRAD CBROWN COAL, APPROXIMATELY 9,000 KJ/KG
HARD COAL POSSIBLE AS WELL (24,000 - 28,000 KJ/KG)CONSUMPTION APPROXIMATELY 280 T/H AT FULL LOAD WITH BROWN COAL
APPROXIMATELY 110 T/H AT FULL LOAD WITH HARD COALGRINDING MILLS: 6
EMISSION SO2 200 MG/NM3 X 200 MG/NM3 ASHES 50 MG/NM3 EXHAUST TEMP 70°C
TECHNICAL DATA STEAM TURBINE:
OEM
OUTPUT
LIVE STEAM: 330/345 MW, 177.5 BAR, 535°CGENERAL REMARKS:
PLANT HAS GONE IN COMMERCIAL OPERATION IN 1983
PLANT AND EQUIPMENT HAS BEEN IN OPERATION BASICALLY DURING THE WINTER PERIOD AND HAS 84,300 HOURS ACCUMULATED ONLY
ALL EQUIPMENT IS IN EXCELLENT CONDITION AND PROFESSIONALLY PRESERVEDENTIRE PLANT WITH ALL AUXILIARIES IS AVAILABLE FOR RELOCATION
SCOPE AND CONDITIONS:
DISASSEMBLED, PACKED, AND SHIPPED OR TURNKEY SOLUTION CAN BE NEGOTIATED
RELOCATION WILL BE INCOORDINATION WITH THE OEM WHO IS WILLING TO GIVE A CERTAIN LEVEL OF GUARANTEE FOR THE RELOCATED PLANTQUANTITY: 1
Learn More - K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006
K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006
COAL FIRED STEAM TURBINE POWER PLANT
300MW
COAL OIL GAS
BIOMASS FIRED
OUTPUT: 600 MW
180 BAR
540°C
MANUFCATURER/TYPE: BBC-ABB
YEAR: 2006
ONLY 13,300 AND 45,000 RUNNING HOURS AFTER MAJOR OVERHAULALTERNATOR ACEC TC 1498
COOLING: HYDROGEN 22 KV 3000 TR 1550 KVA
MAIN TRAFO: WESTINGHOUSE 375 MVA 156/22 KV
COUPLE TRAFO: ALSTHOM 20 MVA 22/6.4 KV
START TRAFO: ALSTHOM 20 MVA 71.5/6.4 KVFUELPUMPS: ID:3 / HD:3 LD:2881/HD:2223
16 BURNERS TANGENIALGASBURNERS: TANGENIAL 16 PCS 5000 NM3
COAL GRINDING MILLS:
(4) LOESCHE LM 19.20D
25 T/HR(2) LOESCHE LM 20.20D
35 T/HRBIOMASS POWER GENERATION BY CFB (CIRCULATING FLUIDIZED BED) BOILER 20 MWe FIRED BY WOOD DERIVED WASTES CUT INTO CHIPS. COMPLETE SAWDUST INSTALLATION.
UNIT 1
172,000 HOURS, OVERHAULED IN 2006
NEW ROTOR (HD, MD, LD)
ONLY 13,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN APRIL 2011 ONLY 408 HOURS UNTIL NOW!UNIT 2
265,000 HOURS, OVERHAULED IN 2006 (HD, MD, LD)
45,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN NOVEMBER 2011 ONLY 13,300 HOURS UNTIL NOW!
189 KG/CM2, 540˚C, 3000 T/MINPLANT ORIGINALLY FROM THW 1970’S BUT RENEWED IN 2006
STILL INSTALLED
IMMEDIATE DISMANTLING POSSIBLE
BOILER INTAKE CAPACITY: 3500 T/H
NEW PLCQUANTITY: 2
Learn More - K-2584 STANDARDKESSEL STEAM HEAT RECOVERY BOILER 25 T/H YEAR 1999
K-2584 STANDARDKESSEL STEAM HEAT RECOVERY BOILER 25 T/H YEAR 1999
YEAR 1999
25 T/H
25 BAR
GERMAN RATES UNDER 150ppm NOX AND CO
SIEMENS CONTROL
ECO: 19 TO
BOILER BORE: 3.50M
BOILER LENGTH: 6.70M
WEIGHT: 60
INSUALATION: 200mm V2A III D
TURBINE EXHAUST GASES AND NATURAL GAS WITH EXTRA BURNERQUANTITY: 1
Learn More