Search results for: 'and'
- K-6715 ESCHER WYSS BACK PRESSURE STEAM TURBINE YEAR 1964
K-6715 ESCHER WYSS BACK PRESSURE STEAM TURBINE YEAR 1964
MANUFACTURER: ESCHER WYSS
TYPE: 135-200
POWER ELECTRICAL: 3.0 MW
PRESSURE/TEMP.: 60 BAR/400°C
BACK PRESSURE: 11 BAR
YEAR OF MANUFACTURER: 1964
CONDITION: GOOD
VOLTAGE: 11 KV/50 HZ
SCOPE OF SUPPLY:
TURBINE AND GENERATOR,PIPING AND ELECTR. BOXESQUANTITY: 1
Learn More - K-2919 MAN-BHKW COMPLETE MODULES 500KW YEAR 2009
K-2919 MAN-BHKW COMPLETE MODULES 500KW YEAR 2009
ELECTRICAL POWER 500 KW
THERM. POWER 400 KW
FUEL: BIO OIL AND DIESEL
YEAR2009
ONLY BETWEEN 6000 AND 9000 HOURS
INCLUDING ELECTRICAL BOXES
HEAT EXCHANGER
CATALYSATORS
11 KV / 50 HZQUANTITY: 8
Learn More - K-2584 STANDARDKESSEL STEAM HEAT RECOVERY BOILER 25 T/H YEAR 1999
K-2584 STANDARDKESSEL STEAM HEAT RECOVERY BOILER 25 T/H YEAR 1999
YEAR 1999
25 T/H
25 BAR
GERMAN RATES UNDER 150ppm NOX AND CO
SIEMENS CONTROL
ECO: 19 TO
BOILER BORE: 3.50M
BOILER LENGTH: 6.70M
WEIGHT: 60
INSUALATION: 200mm V2A III D
TURBINE EXHAUST GASES AND NATURAL GAS WITH EXTRA BURNERQUANTITY: 1
Learn More - K-2553 COMPLETE POWER PLANT 8.8MW YEAR 2005
K-2553 COMPLETE POWER PLANT 8.8MW YEAR 2005
WARTSILA W 20 V
8.8MW
11KV
INCLUDING 4 STEAM BOILERS WITH 13 BARS AND 4.7 T/H COOLERS AND TRANSFORMERS
NATURAL GAS FUEL
YEAR 2005
50 HZ
EXCELLENT CONDITIONQUANTITY: 4
Learn More - NATURAL GAS FIRED CHP PLANT WITH JENBACHER 995KW 50HZ GAS GENERATORNATURAL GAS FIRED CHP PLANT WITH JENBACHER 995KW / 50HZ GAS GENERATOR DELIVERED IN YEAR 1997, TOTAL OPERATING HOURS 55,000 GENERATOR DRIVER JENBACHER 20 CYLINDER / 1500 RPM GAS ENGINES TYPE J320 GS N.L. COMPLETE PLANT, ELECTRICAL OUTPUT 995KW 400 / 230V / 40HZ FROM ALTERNATORS HEAT RECOVERY FOR 80 C DEGREE WATER AND STEAM BOILER 6 T/H AT 10 BAR ( SUPPL. FIRED) EQUIPMENT IS STILL INSTALLED AND IN A FAIR CONDITION Learn More
- ALSTOM GAS POWER PLANT, 252 MWREFERENCE NUMBER: T-6937 ALSTOM GAS POWER PLANT, 252 MW ALSTOM GAS POWER PLANT 252 MW WITH SIEMENS TECHNOLOGY STILL INSTALLED, USED ONLY TEST AND MAINTENANCE OPERATION 500 HOURS QUANTITY: 1 Learn More
- K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006
K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006
COAL FIRED STEAM TURBINE POWER PLANT
300MW
COAL OIL GAS
BIOMASS FIRED
OUTPUT: 600 MW
180 BAR
540°C
MANUFCATURER/TYPE: BBC-ABB
YEAR: 2006
ONLY 13,300 AND 45,000 RUNNING HOURS AFTER MAJOR OVERHAULALTERNATOR ACEC TC 1498
COOLING: HYDROGEN 22 KV 3000 TR 1550 KVA
MAIN TRAFO: WESTINGHOUSE 375 MVA 156/22 KV
COUPLE TRAFO: ALSTHOM 20 MVA 22/6.4 KV
START TRAFO: ALSTHOM 20 MVA 71.5/6.4 KVFUELPUMPS: ID:3 / HD:3 LD:2881/HD:2223
16 BURNERS TANGENIALGASBURNERS: TANGENIAL 16 PCS 5000 NM3
COAL GRINDING MILLS:
(4) LOESCHE LM 19.20D
25 T/HR(2) LOESCHE LM 20.20D
35 T/HRBIOMASS POWER GENERATION BY CFB (CIRCULATING FLUIDIZED BED) BOILER 20 MWe FIRED BY WOOD DERIVED WASTES CUT INTO CHIPS. COMPLETE SAWDUST INSTALLATION.
UNIT 1
172,000 HOURS, OVERHAULED IN 2006
NEW ROTOR (HD, MD, LD)
ONLY 13,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN APRIL 2011 ONLY 408 HOURS UNTIL NOW!UNIT 2
265,000 HOURS, OVERHAULED IN 2006 (HD, MD, LD)
45,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN NOVEMBER 2011 ONLY 13,300 HOURS UNTIL NOW!
189 KG/CM2, 540˚C, 3000 T/MINPLANT ORIGINALLY FROM THW 1970’S BUT RENEWED IN 2006
STILL INSTALLED
IMMEDIATE DISMANTLING POSSIBLE
BOILER INTAKE CAPACITY: 3500 T/H
NEW PLCQUANTITY: 2
Learn More - K-2570 COMPLETE CHP POWER PLANT 0.34MW YEAR 2007
K-2570 COMPLETE CHP POWER PLANT 0.34MW YEAR 2007
WURZ /SCANIA ENGINE
0.34MW
BIO FUEL AND DIESEL ENGINE
YEAR 2007- NEW ENGINE IN 2010QUANTITY: 1
Learn More - K-2554 CATERPILLAR COMPLETE POWER PLANT 6.5MW YEAR 2005
K-2554 CATERPILLAR COMPLETE POWER PLANT 6.5MW YEAR 2005
6.5MW
11KV
INCLUDING STEAM BOILER WITH 12 BARS AND 2.9 T/H
NATURAL GAS FUEL
YEAR 2005
50 HZ
EXCELLENT CONDITIONQUANTITY: 2
Learn More - K-2547 GAS TURBINE POWER PLANT 5.2MW YEAR 1989
K-2547 GAS TURBINE POWER PLANT 5.2MW YEAR 1989
SOLAR TAURUS 6- SOLO NOx
5.2MW
YEAR 1989- GAS TURBINE RECONDITIONED IN 2010
STEAM BOILER
25 T/H/ 16-25 BAR AND GAS COMPRESSORS
NATURAL GAS
50 HZQUANTITY: 1
Learn More