Search results for: 'Technical'
- Related search terms
- Technical da
- Technical date
- technical sales position
-
K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983
COAL FIRED STEAM POWER PLANT 330 MW
PLANT FOR RELOCATION
EQUIPMENT AND AUXILIARIES IN EXCELLENT CONDITIONSUMMARY OF MAIN ADVANTAGES:
THE STEAM PLANT IS AVAILABLE NOW AND CAN BE REINSTALLED IN SHORT TIME
POWER AVAILABLE IN SHORT TIME
THE EQUIPMENT IS OFFERED AT ATTRACTIVE CONDITIONS
LOW INVESTMENT COST
THE MAIN EQUIPMENT IS BASED ON STATE OF THE ART DESIGN & EMISSION CONTROL
COMMERCIAL LIFE TIME FOR MANY YEARS TO COME
RELOCATION IN COOPERATION WITH OEM SUPERVISING AND GUARANTEES OVERALL CONCEPTTECHNICAL DATA OF BOILER:
OEM
STEAM OUTPUT DESIGN PRESSURE LIVE STEAM REHEAT TEMP FUEL980 T/H
203 BAR
184 BAR / GRAD CBROWN COAL, APPROXIMATELY 9,000 KJ/KG
HARD COAL POSSIBLE AS WELL (24,000 - 28,000 KJ/KG)CONSUMPTION APPROXIMATELY 280 T/H AT FULL LOAD WITH BROWN COAL
APPROXIMATELY 110 T/H AT FULL LOAD WITH HARD COALGRINDING MILLS: 6
EMISSION SO2 200 MG/NM3 X 200 MG/NM3 ASHES 50 MG/NM3 EXHAUST TEMP 70°C
TECHNICAL DATA STEAM TURBINE:
OEM
OUTPUT
LIVE STEAM: 330/345 MW, 177.5 BAR, 535°CGENERAL REMARKS:
PLANT HAS GONE IN COMMERCIAL OPERATION IN 1983
PLANT AND EQUIPMENT HAS BEEN IN OPERATION BASICALLY DURING THE WINTER PERIOD AND HAS 84,300 HOURS ACCUMULATED ONLY
ALL EQUIPMENT IS IN EXCELLENT CONDITION AND PROFESSIONALLY PRESERVEDENTIRE PLANT WITH ALL AUXILIARIES IS AVAILABLE FOR RELOCATION
SCOPE AND CONDITIONS:
DISASSEMBLED, PACKED, AND SHIPPED OR TURNKEY SOLUTION CAN BE NEGOTIATED
RELOCATION WILL BE INCOORDINATION WITH THE OEM WHO IS WILLING TO GIVE A CERTAIN LEVEL OF GUARANTEE FOR THE RELOCATED PLANTQUANTITY: 1
Learn More -
K-8157 COAL FIRED POWER PLANT (2 X 50MW)K-8157 COAL FIRED POWER PLANT (2 X 50MW)
ENERGY BOILERS (CAE)
TURBINE SYSTEMS
STEAM TURBINES (TA) - DSL ARE 50 - 1
-CONDENSING TURBINE WITH TWO ADJUSTABLE OUTLETS, SUCH AS "ACTING" ON A SINGLE LINE OF TREES, DESIGNED TO DRIVE THE AC GENERATOR DIRECT-TYPE TH 60-2
-IS COMPOSED OF TWO BODIES: THE BODY OF HIGH PRESSURE (CIP) AND MEDIUM AND LOW PRESSURE BODY (CMP + CJP)
-HAS TWO ADJUSTABLE OUTLETS (PLUG SOCKETS AND PLUG HEATING) AND FIVE FIXED DOSES REGENERATIVE CIRCUIT FEEDSQUARES OF 600 CARS OVER T/H (WITH BUCKET WHEEL AND ARM LENGTH 12 M) - 4 PCS
-TIP HAMMER CRUSHERS CCA - 160 TO 2 PIECES
- RUBBER BANDS COAL TRANSPORTTHE MAIN EQUIPMENT IS ADDED TO ENSURE PROPER OPERATION FOLLOWING:
- SOLID FUEL STORAGE
- INSTALLATIONS AND INDUSTRIAL WATER SUPPLIES AND WASTEWATER DISCHARGE
- INSTALLATION OF EXHAUST HYDRAULIC SLAG
- WATER TREATMENT STATION
TO USE COAL, WEIGHT 88%, 12% NATURAL GASQUANTITY: 1
Learn More