Search results for: 'm-53'
- Related search terms
- m-5311
- M-5311 POTDEVIN
- M-5311+POTDEVIN
- M-5337
- M-5337+thies+e
-
K-8157 COAL FIRED POWER PLANT (2 X 50MW)K-8157 COAL FIRED POWER PLANT (2 X 50MW)
ENERGY BOILERS (CAE)
TURBINE SYSTEMS
STEAM TURBINES (TA) - DSL ARE 50 - 1
-CONDENSING TURBINE WITH TWO ADJUSTABLE OUTLETS, SUCH AS "ACTING" ON A SINGLE LINE OF TREES, DESIGNED TO DRIVE THE AC GENERATOR DIRECT-TYPE TH 60-2
-IS COMPOSED OF TWO BODIES: THE BODY OF HIGH PRESSURE (CIP) AND MEDIUM AND LOW PRESSURE BODY (CMP + CJP)
-HAS TWO ADJUSTABLE OUTLETS (PLUG SOCKETS AND PLUG HEATING) AND FIVE FIXED DOSES REGENERATIVE CIRCUIT FEEDSQUARES OF 600 CARS OVER T/H (WITH BUCKET WHEEL AND ARM LENGTH 12 M) - 4 PCS
-TIP HAMMER CRUSHERS CCA - 160 TO 2 PIECES
- RUBBER BANDS COAL TRANSPORTTHE MAIN EQUIPMENT IS ADDED TO ENSURE PROPER OPERATION FOLLOWING:
- SOLID FUEL STORAGE
- INSTALLATIONS AND INDUSTRIAL WATER SUPPLIES AND WASTEWATER DISCHARGE
- INSTALLATION OF EXHAUST HYDRAULIC SLAG
- WATER TREATMENT STATION
TO USE COAL, WEIGHT 88%, 12% NATURAL GASQUANTITY: 1
Learn More -
TT-8654 SIEMENS SGT 5/6-2000E (94.2) POWER GENERATION, 498 MW, GAS FIRED, 60 HzTT-8654 SIEMENS SGT 5/6-2000E (94.2) POWER GENERATION, 498 MW, GAS FIRED, 60 Hz 1. POWER GENERATION 498 MW TOTAL 2. GAS FIRED 3. FREQUENCY (60 Hz) 4. MODEL: SIEMENS SGT5/6-2000E (VERSION 94.2) 5. OUTPUT: 166 MW PER UNIT (BASE LOAD) 6. CONFIGURATION: SIMPLE CYCLE; CONVERTIBLE TO COMBINED CYCLE OR CHP 7. FUEL: NATURAL GAS (OTHER FUELS POSSIBLE WITH MODIFICATION) 8. CONDITION: BRAND NEW, NEVER USED, ZERO HOURS 9. SERVICEABILITY: FULL SIEMENS OEM SUPPORT, GLOBAL SPARES AVAILABILITY, ROBUST INSTALLED BASE (SEPARATELY QUOTED SERVICE) QUANTITY: 3 Learn More -
K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983
COAL FIRED STEAM POWER PLANT 330 MW
PLANT FOR RELOCATION
EQUIPMENT AND AUXILIARIES IN EXCELLENT CONDITIONSUMMARY OF MAIN ADVANTAGES:
THE STEAM PLANT IS AVAILABLE NOW AND CAN BE REINSTALLED IN SHORT TIME
POWER AVAILABLE IN SHORT TIME
THE EQUIPMENT IS OFFERED AT ATTRACTIVE CONDITIONS
LOW INVESTMENT COST
THE MAIN EQUIPMENT IS BASED ON STATE OF THE ART DESIGN & EMISSION CONTROL
COMMERCIAL LIFE TIME FOR MANY YEARS TO COME
RELOCATION IN COOPERATION WITH OEM SUPERVISING AND GUARANTEES OVERALL CONCEPTTECHNICAL DATA OF BOILER:
OEM
STEAM OUTPUT DESIGN PRESSURE LIVE STEAM REHEAT TEMP FUEL980 T/H
203 BAR
184 BAR / GRAD CBROWN COAL, APPROXIMATELY 9,000 KJ/KG
HARD COAL POSSIBLE AS WELL (24,000 - 28,000 KJ/KG)CONSUMPTION APPROXIMATELY 280 T/H AT FULL LOAD WITH BROWN COAL
APPROXIMATELY 110 T/H AT FULL LOAD WITH HARD COALGRINDING MILLS: 6
EMISSION SO2 200 MG/NM3 X 200 MG/NM3 ASHES 50 MG/NM3 EXHAUST TEMP 70°C
TECHNICAL DATA STEAM TURBINE:
OEM
OUTPUT
LIVE STEAM: 330/345 MW, 177.5 BAR, 535°CGENERAL REMARKS:
PLANT HAS GONE IN COMMERCIAL OPERATION IN 1983
PLANT AND EQUIPMENT HAS BEEN IN OPERATION BASICALLY DURING THE WINTER PERIOD AND HAS 84,300 HOURS ACCUMULATED ONLY
ALL EQUIPMENT IS IN EXCELLENT CONDITION AND PROFESSIONALLY PRESERVEDENTIRE PLANT WITH ALL AUXILIARIES IS AVAILABLE FOR RELOCATION
SCOPE AND CONDITIONS:
DISASSEMBLED, PACKED, AND SHIPPED OR TURNKEY SOLUTION CAN BE NEGOTIATED
RELOCATION WILL BE INCOORDINATION WITH THE OEM WHO IS WILLING TO GIVE A CERTAIN LEVEL OF GUARANTEE FOR THE RELOCATED PLANTQUANTITY: 1
Learn More -
M-5321 JENBACHER NATURAL GAS POWERPLANT 21.6 MW YEAR 1998REFERENCE NUMBER: M-5321 (22011DGFAB1RXL) L JENBACHER NATURAL GAS POWERPLANT 21.6 MW YEAR 1998 COMPLETE JENBACHER NATURAL GAS POWERPLANT OF 21.6 MW YEAR OF MANUFACTURE END OF 1998 COMMISSIONING: 5 UNITS IN 2000, 1 UNIT IN 2009, 1 UNIT IN 2010, AND 1 UNIT IN 2011 8 UNITS JENBACHER JMS 620 G OF 2.7 MWE-TOTAL EFFECTIVE ELECTRIC OUTPUT 21.7 MW RUNNING HOURS: 5 UNITS BETWEEN 38,000 AND 40,000 HOURS, 2 UNITS 6,200 HOURS AND 1 UNIT 7,200 HOURS JENBACHER MAINTENANCE FULL MAINTENANCE HISTORY QUANTITY AVAILABLE: 1 Learn More -
L-5951 WESTINGHOUSE 100 MW GAS TURBINES, LNG FIRED, 60 Hz, YEAR 1995REFERENCE NUMBER: L-5951
WESTINGHOUSE 100 MW GAS TURBINES, LNG FIRED, 60 Hz, YEAR 1995
GAS TURBINES
MAKE: WESTINGHOUSE
YEAR: 1995 (STOPPED IN JUNE 2013)
100 MW EACH X 6 = 600 MW TOTAL
QUANTITY: 5
Learn More -
K-8156 SIEMENS SCHUCKERTWERKE AG COAL FIRED POWER PLANT 120 MW YEAR 1967K-8156 SIEMENS SCHUCKERTWERKE AG COAL FIRED POWER PLANT 120 MW YEAR 1967
COAL FIRED POWER PLANT, 120 MW
MANUFACTURER: SIEMENS - SCHUCKERTWERKE AG
TYPE: CONDENSING - EXTRACTION
FUEL: COAL
SPEED: 3000 U/MIN
POWER: MINIMUM: 125 MW
MAXIMUM: 140 MW
PRESSURE: 185 BAR
TEMPERATURE: 530°C
FREQUENCY: 48.5 - 51.5 HZ
YEAR: 1967
BOILER: BABCOCKSCOPE OF SUPPLY:
-REA AND DENOS (LOW NOx AND SULFUR), INCLUDING SCR-CATALYSATOR AND ELECTROFILTER
-TURBINE
0BOILER
-COAL CRASHER
-COAL BUNKER/STORAGE/TRANSPORTATION
-CONDENSER
-PUMPS AND PIPING
-WATERDEMIRALISTAION
-CHIMNEY
-COOLING SYSTEM AND COOLERS
-LUBRICATION OIL
-COMPRESSOR AIR
-FRESH AIR SYSTEM
-CRANAGE
-ENGINE AND PLANT PLC, MANUFACTURER SIEMENS
-HIGH VOLTAGE
-TRANSFORMER
-ELECTRICAL BOXES AND SWITCHESQUANTITY: 1
Learn More -
K-2572 SIEMENS COAL FIRED POWER PLANT 120MW YEAR 1967K-2572 SIEMENS COAL FIRED POWER PLANT 120MW YEAR 1967
120 MW
185 BAR
530 ˚ C
YEAR 1967
GOOD CONDITIONQUANTITY: 1
Learn More -
K-2571 MAN COAL FIRED POWER PLANT 330MW YEAR 1983K-2571 MAN COAL FIRED POWER PLANT 330MW YEAR 1983
330 MW
178 BAR
535 ˚ C
YEAR 1983
GOOD CONDITIONQUANTITY: 1
Learn More