K-8157 COAL FIRED POWER PLANT (2 X 50MW)K-8157 COAL FIRED POWER PLANT (2 X 50MW)
ENERGY BOILERS (CAE)
TURBINE SYSTEMS
STEAM TURBINES (TA) - DSL ARE 50 - 1
-CONDENSING TURBINE WITH TWO ADJUSTABLE OUTLETS, SUCH AS "ACTING" ON A SINGLE LINE OF TREES, DESIGNED TO DRIVE THE AC GENERATOR DIRECT-TYPE TH 60-2
-IS COMPOSED OF TWO BODIES: THE BODY OF HIGH PRESSURE (CIP) AND MEDIUM AND LOW PRESSURE BODY (CMP + CJP)
-HAS TWO ADJUSTABLE OUTLETS (PLUG SOCKETS AND PLUG HEATING) AND FIVE FIXED DOSES REGENERATIVE CIRCUIT FEEDSQUARES OF 600 CARS OVER T/H (WITH BUCKET WHEEL AND ARM LENGTH 12 M) - 4 PCS
-TIP HAMMER CRUSHERS CCA - 160 TO 2 PIECES
- RUBBER BANDS COAL TRANSPORTTHE MAIN EQUIPMENT IS ADDED TO ENSURE PROPER OPERATION FOLLOWING:
- SOLID FUEL STORAGE
- INSTALLATIONS AND INDUSTRIAL WATER SUPPLIES AND WASTEWATER DISCHARGE
- INSTALLATION OF EXHAUST HYDRAULIC SLAG
- WATER TREATMENT STATION
TO USE COAL, WEIGHT 88%, 12% NATURAL GASQUANTITY: 1
Learn More -
R-9389 GE 7EA GAS TURBINE GENERATOR 60HZ PACKAGESREFERENCE NUMBER: R-9389
GE 7EA GAS TURBINE GENERATOR 60HZ PACKAGES
GE 7EA GAS TURBINE GENERATOR PACKAGES
85MW ISO EACH ON NATURAL GAS
THEY ARE IN STORAGE RIGHT NOW
OWNER HAD THEM SHIPPED BACK TO THE USA ABOUT A YEAR AGO.
THEY ARE UNUSED (NEVER FIRED) AND WERE BUILT IN 2008 BY GENERAL ELECTRIC
GE 7EA (PG7121) DUAL LIQUID FUEL TURBINES
HEAT RATE: 10,430 BTU/KWH
OUTPUT: 85MW ISO ON NATURAL GAS
CURRENTLY DUAL LIQUID FUEL- CRUDE (PRIMARY FUEL) AND DISTILLATE (BACK UP)
QUANTITY: 2
Learn More -
TT-8654 SIEMENS SGT 5/6-2000E (94.2) POWER GENERATION, 498 MW, GAS FIRED, 60 HzTT-8654 SIEMENS SGT 5/6-2000E (94.2) POWER GENERATION, 498 MW, GAS FIRED, 60 Hz 1. POWER GENERATION 498 MW TOTAL 2. GAS FIRED 3. FREQUENCY (60 Hz) 4. MODEL: SIEMENS SGT5/6-2000E (VERSION 94.2) 5. OUTPUT: 166 MW PER UNIT (BASE LOAD) 6. CONFIGURATION: SIMPLE CYCLE; CONVERTIBLE TO COMBINED CYCLE OR CHP 7. FUEL: NATURAL GAS (OTHER FUELS POSSIBLE WITH MODIFICATION) 8. CONDITION: BRAND NEW, NEVER USED, ZERO HOURS 9. SERVICEABILITY: FULL SIEMENS OEM SUPPORT, GLOBAL SPARES AVAILABILITY, ROBUST INSTALLED BASE (SEPARATELY QUOTED SERVICE) QUANTITY: 3 Learn More -
K-2544 COMPLETE POWER PLANT 46MW YEAR 2000K-2544 COMPLETE POWER PLANT 46MW YEAR 2000
SIEMENS TYPHOON AND ALSTOM
5 GAS TURBINE PACKAGES
1 STEAM TURBINE
BOILER AND AUXILIARIES
NATURAL GAS AND NAPHTA
46 MW
YEAR 2000-LOW HOURS
50 HZQUANTITY: 1
Learn More -
K-2584 STANDARDKESSEL STEAM HEAT RECOVERY BOILER 25 T/H YEAR 1999K-2584 STANDARDKESSEL STEAM HEAT RECOVERY BOILER 25 T/H YEAR 1999
YEAR 1999
25 T/H
25 BAR
GERMAN RATES UNDER 150ppm NOX AND CO
SIEMENS CONTROL
ECO: 19 TO
BOILER BORE: 3.50M
BOILER LENGTH: 6.70M
WEIGHT: 60
INSUALATION: 200mm V2A III D
TURBINE EXHAUST GASES AND NATURAL GAS WITH EXTRA BURNERQUANTITY: 1
Learn More