Search results for: 'natural gas turbine generator'
- Related search terms
- gas fi
- Generator'
- generator?
- Generator po
- Generator powe
- K-8157 COAL FIRED POWER PLANT (2 X 50MW)
K-8157 COAL FIRED POWER PLANT (2 X 50MW)
ENERGY BOILERS (CAE)
TURBINE SYSTEMS
STEAM TURBINES (TA) - DSL ARE 50 - 1
-CONDENSING TURBINE WITH TWO ADJUSTABLE OUTLETS, SUCH AS "ACTING" ON A SINGLE LINE OF TREES, DESIGNED TO DRIVE THE AC GENERATOR DIRECT-TYPE TH 60-2
-IS COMPOSED OF TWO BODIES: THE BODY OF HIGH PRESSURE (CIP) AND MEDIUM AND LOW PRESSURE BODY (CMP + CJP)
-HAS TWO ADJUSTABLE OUTLETS (PLUG SOCKETS AND PLUG HEATING) AND FIVE FIXED DOSES REGENERATIVE CIRCUIT FEEDSQUARES OF 600 CARS OVER T/H (WITH BUCKET WHEEL AND ARM LENGTH 12 M) - 4 PCS
-TIP HAMMER CRUSHERS CCA - 160 TO 2 PIECES
- RUBBER BANDS COAL TRANSPORTTHE MAIN EQUIPMENT IS ADDED TO ENSURE PROPER OPERATION FOLLOWING:
- SOLID FUEL STORAGE
- INSTALLATIONS AND INDUSTRIAL WATER SUPPLIES AND WASTEWATER DISCHARGE
- INSTALLATION OF EXHAUST HYDRAULIC SLAG
- WATER TREATMENT STATION
TO USE COAL, WEIGHT 88%, 12% NATURAL GASQUANTITY: 1
Learn More - R-9389 GE 7EA GAS TURBINE GENERATOR 60HZ PACKAGES
REFERENCE NUMBER: R-9389
GE 7EA GAS TURBINE GENERATOR 60HZ PACKAGES
GE 7EA GAS TURBINE GENERATOR PACKAGES
85MW ISO EACH ON NATURAL GAS
THEY ARE IN STORAGE RIGHT NOW
OWNER HAD THEM SHIPPED BACK TO THE USA ABOUT A YEAR AGO.
THEY ARE UNUSED (NEVER FIRED) AND WERE BUILT IN 2008 BY GENERAL ELECTRIC
GE 7EA (PG7121) DUAL LIQUID FUEL TURBINES
HEAT RATE: 10,430 BTU/KWH
OUTPUT: 85MW ISO ON NATURAL GAS
CURRENTLY DUAL LIQUID FUEL- CRUDE (PRIMARY FUEL) AND DISTILLATE (BACK UP)
QUANTITY: 2
Learn More