T-1652 SGT 400 GAS TURBINE, 50Hz, YEAR 2017, 11 KV, 12.9 MW
SGT 400 GAS TURBINE
TYPE: STANDARD
BRAND: SIEMENS
CATEGORY: ENGINES/GENERATORS/MOTORS/TRANSMISSIONS
SUBCATEGORY: TURBINE
IN STOCK: YES
CONDITION: EXCELLENT
TYPE: UNUSED
SGT-400 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOM:
UNIT(S) TO BE SUPPLIED ARE UNUSED, WITH ZERO RUNNING HOURS, NEVER INSTALLED
THESE UNITS HAVE BEEN STORED INDOORS SINCE MANUFACTURE.
QUANTITY: 2 Learn More
TT-8656 SIEMENS SGT5 4000 F GAS TURBINE & GENERATOR – NEW, 54 MW, YEAR 2016, 50/60 Hz
1. NEW AND UNUSED SIEMENS GAS TURBINE & GENERATOR
2. HEAVY DUTY, SINGLE CASING, AXIAL FLOW DESIGN AND DUAL FUEL GAS TURBINE.
3. MODEL: SGT54000F
4. BRAND: SIEMENS AG
5. 54 MW
6. YEAR OF MANUFACTURE: 2016
7. FREQUENCY: 50 Hz
8. FUEL: NATURAL GAS (NG) AND DIESEL OIL (DO)
9. GUARANTEED PERFORMANCE:
10. GROSS POWER OUTPUT [MW]: 298,2 (NG) – 301 (DO).
11. GROSS HEAT RATE [KJ/KWH]: 8979,3 (NG) – 9538,5 (DO).
12. GENERATOR: SGEN51200 A.
13. INCLUDES: BYPASS STACK AND DIVERTER DAMPER.
14. DELIVERY: IMMEDIATELY. BUYER IS RESPONSIBLE FOR LOADING, FREIGHT AND LOGISTICS FROM ACTUAL LOCATION TO FINAL DESTINATION.
15. DETAILED DESCRIPTION: GAS TURBINE (GT)
16. IT WORKS ON 50 Hz BUT COULD BE CONVERTED, WITH ADDITIONAL EQUIPMENT FOR 60 Hz (EXTRA COSTS).
QUANTITY: 1
Learn More
TT-2148 MAN TURBO 16 MW STEAM TURBINE GENERATOR ASSEMBLY MODEL MARC4-B00
MAN TURBO 16 MW STEAM TURBINE GENERATOR ASSEMBLY
MODEL MARC4-B00
USED
QUANTITY: 1
Learn More
YY-2311 GE TM2500+ GENERATION 6 GENERATOR PACKAGE – 26 MW EACH, 11,000 V, 50/60 Hz, DIESEL OR NATURAL GAS, YEAR 2011
-AT 50 Hz THE UNITS ARE DESIGNED TO PRODUCE 26 MW OF POWER
-AT 60 Hz THE UNITS ARE DESIGNED TO PRODUCE 30 MW OF POWER
-DEPENDING ON LOCATION TEMPERATURE
-THESE ARE CONTINUOUS POWER UNITS
DETAILS:
1. 31MW CONTINUOUS RATED (GE ADVERTISED AT ISO CONDITIONS);
2. YEAR OF MANUFACTURE: 2011;
3. PACKAGE SN: 2011-TM006 AND 2011-TM008;
4. CURRENTLY CONFIGURED AS 11KV 50HZ, YET CAN OPERATE AT EITHER 50HZ OR 60HZ;
5. 2 UNITS AVAILABLE;
6. EQUIPMENT IS CONFIGURED TO OPERATE ON LIQUID FUEL OR NATURAL GAS;
7. CURRENT OPERATING HOURS AS OF JULY 30, 2022: TM006 – 1726 HOURS TM008 – 2174 HOURS;
8. HOURS REFLECT TOTAL TIME SINCE NEW:
HOURS MAY GO UP AS UNITS ARE STILL CONNECTED FOR EMERGENCY USE ONLY.
9. PRICE INCLUDES THE GT1 REPAIRS RECOMMENDED BY GE IN THE ATTACHED INVESTIGATIVE REPORT;
10. HPT REPLACEMENT ON GT1 ONLY:
- LEAD TIME FOR REPAIRS IS 12-14 WEEKS BASED ON CURRENT AVAILABILITY (SUBJECT TO CHANGE);
- SCOPE OF SUPPLY FOR EACH UNIT IS LISTED IN APPENDIX A.
Learn More