Search results for: 'Process+o'
- Related search terms
- Process+of+cleaning+the+applicati
- Process+of+cleaning+the+a
- Process+of+cleaning+the+applicatio
- Process+of+cleaning+the+application
- Process+oil+uses
-
M-1385 PILLOW FILLING MACHINEREFERENCE NUMBER: M-1385 (66032TYC5UF) PILLOW FILLING MACHINE PRODUCTION NAME PILLOW FILLING MACHINE ITEM NO. L001C VOLTAGE AS PER CUSTOMER POWER 22.05KW OPENER WIDTH 1000mm BALE BREAKER WIDTH 1200mm OPENER CAPACITY 400KG/H FILLING CAPACITY 8PCS/MIN UP FIBER OPENING RATE MAX.100% AIR PRESSURE 1M3/MIN; 0.8MPA CONTROL SYSTEM SIEMENS PLC PROGRAM DIMENSION 9824 x 2417 x 2400mm LABOR NEED 2 WEIGHT 3840KG QUANTITY AVAILABLE: 1 Learn More -
M-5284 BRUCKNER STENTER FOR DRYING AND SETTING PROCESS YEAR 1986 WIDTH 2500mmREFERENCE NUMBER: M-5284 (1313WTDSXX12RC) L BRUCKNER STENTER FOR DRYING AND SETTING PROCESS YEAR 1986 WIDTH 2500mm STENTER FOR DRYING AND SETTING PROCESS BRAND: BRUCKNER YEAR: 1986 WORKING WIDTH: 800 TO 2500mm Learn More -
V-0025 COTTON PAD, BALL, SWAB MACHINESREFERENCE NUMBER: V-0025 COTTON PAD, BALL, SWAB MACHINES M-5138 SQUARE COTTON PAD PRODUCTION MACHINE M-5139 COTTON GAUZE PAD PRODUCTION MACHINE M-5140 MACHINE TO PRODUCE VARIOUS TYPES OF COTTON PADS M-5141 COTTON PAD PRODUCTION MACHINE M-5142 MAKEUP REMOVING COTTON PAD PRODUCTION MACHINE M-5143 ROUND COTTON PAD MAKING MACHINE M-5144 SQUARE ABSORBENT COTTON PAD PRODUCTION MACHINE M-5145 ROUND ABSORBENT COTTON PAD PRODUCTION MACHINE M-5146 ROUND COTTON PADS MAKING MACHINE M-5147 COTTON PAD MAKING MACHINE M-5148 COTTON PAD MAKING MACHINE M-5168 COTTON PADS MAKING MACHINE M-5169 COTTON Q-TIP MAKING MACHINE (100PCS/BAG) M-5170 COTTON BALL MAKING MACHINE (NEW) M-5171 COSMETIC COTTON PAD (GLOVE SHAPE) MAKING MACHINE M-5172 COSMETIC COTTON PAD MAKING MACHINE (ROUND PAD) M-5101 MEDICAL COTTON BALL MAKING MACHINE 20KG/HOUR QUANTITY AVAILABLE: 17 Learn More -
SULFURIC ACID PLANT YEAR 2000 – CAPACITY 2,400TPDCAPACITY: 2,400 TPD (CAN RUN AS LOW AS 960 TPD) YEAR BUILD: 2000 YEAR CLOSED: 2010 TECHNOLOGY: FREE AND CLEAR TO PRACTICE RAW MATERIAL: SULFUR PRODUCTS PRODUCED: SULFURIC ACID UTILITIES CONSUMED: NATURAL GAS, ELECTRICITY, AND WATER THIS PLANT IS A LURGI DOUBLE-ABSORPTION TYPE SULFURIC ACID PLANT STARTED UP IN 2000 AND SHUTDOWN IN DECEMBER 2010. IT IS RATED FOR 2,400 T/DAY OF SULFURIC ACID (100% BASIS). IT CAN RUN AS LOW AS 960 MT/DAY. PLANT PRODUCES SULFURIC ACID AT 98.5% CONCENTRATION. THE PLANT SENDS LESS THAN 300 PPM OF SO2 OUT OF THE EXHAUST STACK. THERE IS ALSO A SMALL 150 MT/DAY OLEUM PLANT (103% SULFURIC ACID) INCLUDED. DOCUMENTATION IS EXCELLENT; PROCESS FLOW DIAGRAMS, P&IDS, OPERATING PROCEDURES, PROCESS CONTROL LOGIC, AND EQUIPMENT FILES WERE ALL INSPECTED WITH GOOD RESULTS. THE PROCESS CONTROL SYSTEM IS HONEYWELL TDC 2000. ALL FIELD INSTRUMENTATION IS ELECTRONIC. SPARE PARTS ARE ABUNDANT AND AVAILABLE. Learn More -
CAPROLACTAM PLANT CAPACITY 60,000 MTPYCAPACITY: 60,000 MTPY THIS CAPROLACTAM FACILITY INCLUDES ALL INTERMEDIATE AND BYPRODUCT PLANTS. THE FACILITY STARTS WITH BENZENE AND FINISHES WITH CAPROLACTAM AND AMMONIUM SULFATE BYPRODUCT: CYCLOHEXANE PLANT – 79 KMTA CYCLOHEXANONE PLANT – 55 KMTA OXIMATION PLANT – 62 KMTA CAPROLACTAM PLANT – 60 KMTA AMMONIUM SULFATE – 108 KMTA INCINERATOR – 5 M3/HR LIQUID WASTE THE FACILITY HAD SOME UPGRADES OVER THE YEARS. THE MAJORITY OF THE SITE SHUT DOWN IN 2009, BUT THE CYCLOHEXANE UNIT RAN UNTIL AUGUST 2013. THE PROCESS WAS LICENSED FROM DUTCH STATE MINES (DSM), WITH ENGINEERING BY CHIYODA AND CONSTRUCTION BY MONTREAL. THE LICENSE HAS BEEN FULLY PAID. DOCUMENTATION IS COMPLETE AND WELL-ORGANIZED. MUCH OF IT IS ELECTRONIC AND HAS ALREADY BEEN SHARED WITH IPP. THE FACILITY RECEIVED ISO-9001 CERTIFICATION IN 1997 AND ISO-14001 CERTIFICATION IN 2004. DCS IS BY YOKOGAWA (CENTUM CS-3000) AND IS USED IN THE OXIMATION, CAPROLACTAM, AMMONIA SULFATE, AND INCINERATOR UNITS. THE PLANT HAS BEEN WELL-MAINTAINED AND IS STILL BEING KEPT UP WITH A STAFF OF FOUR EMPLOYEES. THERE IS A NITROGEN PAD ON THE PROCESS AND THEY ARE TURNING THE ROTATING EQUIPMENT MONTHLY. THE 15.1 HECTARES OF LAND CAN BE PURCHASED WITH THE FACILITY. THERE ARE ABUNDANT SPARE PARTS AVAILABLE WITH THE FACILITY. TRANSPORTATION TO AND FROM THE FACILITY BY ROAD IS EXCELLENT AND IT IS 24 KM TO THE NEAREST MAJOR PORT. THE PROCESS WAS LICENSED FROM DUTCH STATE MINES (DSM), WITH ENGINEERING BY CHIYODA AND CONSTRUCTION BY MONTREAL OF BRAZIL. THE LICENSE HAS BEEN FULLY PAID. RAW MATERIAL: BENZENE, HYDROGEN, AMMONIA, SULFURIC ACID Learn More -
T-7018 LINE FOR PRODUCING 70 TO 150 DENIER FROM RECYCLED BOTTLEST-7018 LINE FOR PRODUCING 70 TO 150 DENIER FROM RECYCLED BOTTLES EXTRUDER Φ 160/25 PRODUCT TYPE PET-POY END/POSITION 12 ENDS POSITIONS 24 POSITIONS POSITION/SPINNING BEAM 2 POSITIONS/SPINNING BEAM POSITION DISTANCE (mm) 1500mm SPINNING PACK CYLINDER TYPE, BOTTOM MOUNTED SPINNERET DIAMETER (mm) Φ 90mm CROSS BLOWING AREA 1430mm X 1380mm GEAR PUMP SPECIFICATIONS (CC/REV) 12X3.0CC/REV GEAR PUMP QUANTITY/POSITION 1 OIL PUMP SPECIFICATION (CC/REV) 12X0.12CC/REV OIL PUMP QUANTITY/ POSITION 1 DOWTHERM BOILER/LINE 600L/65KW GUIDE ROLLER SYSTEM (DIAMETER X WIDTH) 160mm X 160mm MIGRATION JET AWA. JAPAN WINDER TWA1800-12ENDS Learn More -
E-4258 POLYESTER PACKING TAPE MACHINE (FROM RECYCLED PET SCRAP)INVENTORY NUMBER: E-4258 POLYESTER PACKING TAPE MACHINE (FROM RECYCLED PET SCRAP): XDC TSE-65/32 PET PRODUCTION CONDITION: NEW 1. ELECTRICAL VOLTAGE: 380V/3P/50HZ OR AS PER CUSTOMER 2. MATERIAL: PET SCRAP 3. MAX. EXTRUSION OUTPUT: 350KG PER HOUR NOTE:PRODUCTION CAPACITY DEPENDS ON RAW MATERIAL AND OPERATION. 4. SPECIFICATION:WIDTH OF TAPE 9 TO 24 mm, THICKNESS: 0.5 TO 1.2 mm 5. LINE SPEED:80M/MIN 6. CENTER HEIGHT OF EXTRUDER: 1000 mm 7. OPERATION DIRECTION: FROM RIGHT TO LEFT 8. POWER REQUIREMENT: 212KW(APPROX. 127KW AT CONTINUOUS USAGE) 9. COOLING RECYCLE: ≤20℃ ≥0.3MPA ~2T/H 10. AIR CONSUMPTION: 0.4 CUBIC METER PER MINUTE; PRESSURE >0.5MPA QUANTITY AVAILABLE: 1 Learn More -
TT-8638 FISHMEAL PLANT, 10 MT PER HOUR RAW MATERIAL INTAKETT-8638 FISHMEAL PLANT, 10 MT PER HOUR RAW MATERIAL INTAKE 1. COMPLETE PROCESSING LINE 2. CONSISTING OF: INFEED MILL BREAKER, ATLAS VERTICAL COOKER, ATLAS SCREW PRESS, ATLAS DISC DRYER, ALFA LAVAL DECANTER, FLOTTWEG TRICANTER, 3 EFFECT EVAPORATOR, COOLING TOWERS, MORISA BOILERS, CONVEYING, CONTROLS AND ADDITIONAL INFRASTRUCTURE. Learn More -
YY-2091 EDGE TRIM OPENERS, WORKING WIDTH 250 OR 500mmYY-2091 EDGE TRIM OPENERS, WORKING WIDTH 250 OR 500mm THE SPEED OF THE FEEDING UNIT AND WORKING ROLLERS IS CONTROLLED BY FREQUENCY INVERTER TO SYNCHRONIZE THE SPEED OF THE MACHINE TO THE LINE OR TO ADAPT TO THE PROCESSED RAW MATERIAL. THE MAIN ADAVANTAGES OF OUR EDGE TRIM OPENERS ARE A SOLID COMPACT DESIGN AND THE SAVINGS OF POST-PRODUCTION WASTES THAT CAN BE RECYCLED AND RE-USED. QUANTITY: 1 Learn More -
R-3245 PROBAT DUETT ROASTER & DEMO UNIT - 1 KILOR-3245 PROBAT DUETT ROASTER & DEMO UNIT - 1 KILO
PROBAT DUETT RESEARCH & DEMO UNIT: 1 KILO
THIS ROASTER IS NOT FOR EVERYBODY AS IT IS TOTALLY SPECIALIZED AND DESIGNED AS A "SAMPLE ROASTER" TO REALLY BIG AND HIGH YIELD ROASTERS ALSO MADE BY PROBAT OR GOTHOT BACK IN THE DAY. TOTALLY GEEK TYPE. ACTUALLY THIS MACHINE WAS ONLY USED IN THE PROBAT SHOWROOM WHEN IT WAS LOCATED IN BURLINGAME CALIFORNIA AND HAS NOT BE USED SINCE. EVEN THEN, IT WAS USED ONLY SEVERAL TIMES A QUARTER PR DURING A CLASS. WE ALWAYS PUT IN A LITTLE OVER 2 POUNDS SO AS TO GET 2 POUNDS OUT. BUT THERE IS A FLEXIBLE RANGE.YOU PUT IN FROM 1.6 POUNDS TO 2.6 POUNDS AND CAN SET UP A PROFILE (OR RUN MANUALLY) SO THAT YOU CAN CONTROL AIR AND HEAT AND THE SPEED OF BOTH ALLOWING FOR AS FAST AS A 2 MINUTE ROAST FOR HIGH YIELD OR ADJUST TO NORMAL RANGES FOR MAKING INTRICATE STUDIES INTO CHANGING CONDITIONS OF PROFILING. EVERY DETAIL OF THE MACHINES INNARDS OR ELECTRICAL BOX IS ALL RELAY DRIVEN AND CONTROLLED. THE TOTAL ROAST PROCESS IS VISIBLE BEFORE YOUR EYES AND AS SOON AS THE ROAST REACHES YOUR SET POINT - THE COFFEE SIMPLY SLIDES AND DROPS INTO THE COOING CHAMBER AND YOU ARE READY FOR THE NEXT STUDY.
REQUIRES AN AIR CONNECTION. RUNS ON ELECTRIC ONLY. HAS LIGHTS ON INSIDE. COMES IN 2 BIG BOXES AND WE HAD IT INSTALLED WITH THE ROASTER ONLY IN THE LAB SHOWROOM AND THE CHAFF AND AIR HANDLING UNIT IN ANOTHER ROOM SO WE DID NOT HAVE TO LISTEN TO IT. YOUR OPTION.
BUILT IN 1995 AT PROBAT. NEEDS 3 PHASE POWER. BEEN IN STORAGE SINCE THOSE SHOWROOM DAYS BACK IN IN 97.
QUANTITY: 1
Learn More