Search results for: 'gas turbine ge'
- TT-8062 GE MS-5001-PA GENERATOR SET - NEW, 26MW, NATURAL GAS, 60 Hz, YEAR 2014TT-8062 GE MS-5001-PA GENERATOR SET - NEW, 26MW, NATURAL GAS, 60 Hz, YEAR 2014 1. GE NATURAL GAS GENERATOR 2. NEW 26MW 3. IT IS 60 Hz UNIT. NOT ECONOMICAL TO CONVERT TO 50 Hz 4. NEW 5. NEVER INSTALLED Learn More
- YY-2894 NEW SIEMENS SGT 400, YEAR 2018YY-2894 NEW SIEMENS SGT 400, YEAR 2018 SIEMENS SGT 400 (12.9 MW) GAS TURBINE · 11-STAGE COMPRESSOR, 6 COMBUSTION CHAMBERS, 2-STAGE POWER TURBINE · GAS FUEL SYSTEM · DLE COMBUSTION SYSTEM · HOT-END DRIVE · 2-SHAFT ENGINE · LEFT-HAND EXHAUST · MAIN LUBRICATION PUMP · EQUIVALENT OPERATING HOURS : 0H · TOTAL STARTS : 0 · NEW, NEVER INSTALLED OR COMMISSIONED QUANTITY: 1 Learn More
- V-2170 GENERAL ELECTRIC (GE) STEAM TURBINE 615MW FOR PRODUCING ELECTRICITY STEAM TURBINE ONLY IS BEING OFFERED FOR SALEV-2170 GENERAL ELECTRIC (GE) STEAM TURBINE 615MW FOR PRODUCING ELECTRICITY STEAM TURBINE ONLY IS BEING OFFERED FOR SALE UNIT DETAILS: TURBINE SERIAL NUMBER: 270T764 GENERATOR SERIAL NUMBER: 290T764 RPM: 3600 TURBINE: DESIGN CODE: G12 CONTROL SYSTEM: MARK VI STAGES: 22 LSB LENGTH: 30” INITIAL STEAM TEMPERATURE: 1050F INITIAL STEAM PRESSURE: 3,515 PSIA EXHAUST PRESSURE: 3.45 HGA GENERATOR: CODE: L2D RATING: 750,000 KVA VOLTAGE: 21,000 POWER FACTOR: .9 AMPS: 20,620 EXCITER RATING/VOLTS: 605 AMOUNT OF STEAM NEEDED: 4,200,000 TONS PER HOUR, 3500 PSI YEAR OF THE MACHINE: MANUFACTURED BETWEEN 2009 AND 2016 (IT TAKES 5 TO 6 YEARS TO PRODUCE IT) TYPE OF STEAM TURBINE: IS IT A BACK PRESSURE OR EXTRACTION STEAM TURBINE TO PRODUCE LOW PRESSURE AND MEDIUM PRESSURE STEAM? [ANSWER] LOW AND MEDIUM STEAM PRESSURES IN PSI: [ANSWER] AMOUNT OF STEAM AVAILABLE FROM EACH PRESSURE LEVEL (IN POUNDS OR TONS): [ANSWER] SHIPPING DIMENSIONS: IT WILL OCCUPY A BULK SPACE FOR APPROXIMATELY 2500 TONS WEIGHT. IN ESSENCE, 25,000 TON SHIP NEEDS TO BE ENGAGED AND MOVING. QUANTITY: 1 Learn More
- TT-6645 GE FRAME 6B GAS TURBINE, YEAR 1981TT-6645 GE FRAME 6B GAS TURBINE, YEAR 1981 1. 2X GE FRAME 6B GAS TURBINES 2. TECHNICAL SUMMARY 3. GAS TURBINES: TWO GE MS 6001 B GAS TURBINES PAIRED WITH AEG GENERATORS (TYPE S7102/2). QUANTITY: 2 Learn More
- TT-8106 GE LM2500G4, DLE, 2ND, 33.372MW, YEAR 2018, 50HzTT-8106 GE LM2500G4, DLE, 2ND, 33.372MW, YEAR 2018, 50Hz 1. GE LM2500G4, DLE 2. 2ND 3. YEAR: 2018 4. VOLTAGE: 10.5KV QUANTITY: 1 Learn More
- TT-7835 GE LM2500G4, 1ST, DLE, YEAR 2018, 50HzTT-7835 GE LM2500G4, 1ST, DLE, YEAR 2018, 50Hz 1. GE LM2500G4, 1ST, DLE 2. YEAR: 2018 3. VOLTAGE: 10.5KV 4. DUAL FREQUENCY QUANTITY: 1 Learn More
- TT-5563 GENERAL ELECTRIC LM6000PA, 43MW, YEAR 1994 TO 1995, 50HzTT-5563 GENERAL ELECTRIC LM6000PA, 43MW, YEAR 1994 TO 1995, 50Hz GENERAL ELECTRIC LM6000PA YEAR: 1994 TO 1995 HOURS: 16000 TO 20000 FUEL: NATURAL GAS VOLTAGE: 11000 FREQUENCY: 50Hz SPEED: 3000RPM EACH UNIT POWER: 43MW WITH TWO BOILER WITH TWO STEAM TURBINE EACH UNIT POWER OF STEAM TURBINE: 12MW QUANTITY: 4 Learn More
- TT-1676 SIEMENS SGT-100 TYPHOON GAS TURBINE, YEAR 1994, 4.4 MW AT 11,000 VOLTS, 50 HzTT-1676 SIEMENS SGT-100 TYPHOON GAS TURBINE, YEAR 1994, 4.4 MW AT 11,000 VOLTS, 50 Hz SIEMENS SGT-100 TYPHOON GAS TURBINE YEAR: 1994 MACHINE TYPE: GAS TURBINE PACKAGE BRAND: SIEMENS MODEL: SGT-100 TYPHOON GAS TURBINE 50 Hz CONDITION: GOOD CONDITION (USED) QUANTITY: 1 Learn More
- TT-1818 SIEMENS COMBINED CYCLE COMPLETE POWER PLANT, 420 MW, YEAR 2009 TO 2010TT-1818 SIEMENS COMBINED CYCLE COMPLETE POWER PLANT, 420 MW, YEAR 2009 TO 2010 SIEMENS ELECTRIC YEAR 2009 TO 2010 COMBINED CYCLE COMPLETE POWER PLANT 420 MW COMBINED CYCLE PLANT USED IMMEDIATE DELIVERY Learn More
- TT-7585 SIEMENS SST-300 STEAM TURBINE - NEW, YEAR 2021, 50 HzTT-7585 SIEMENS SST-300 STEAM TURBINE - NEW, YEAR 2021, 50 Hz 1. BRAND NEW STEAM TURBINE SIEMENS SST-300 - IN FACTORY 2. PACKING FROM THE YEAR 2021 3. THIS TURBINE HAS NEVER BEEN INSTALLED AND AVAILABLE 4. WITH ALL ITS EQUIPMENT AND ACCESSORIES 5. STORED IN WAREHOUSE SECURELY, IN GOOD ENVIRONMENT. Learn More