Search results for: 'gas turbine ge'
- TT-6503 COMPLETE GE LM2500, 23MW, 13.8KV, 60Hz, YEAR 1990TT-6503 COMPLETE GE LM2500, 23MW, 13.8KV, 60Hz, YEAR 1990 WELL MAINTAINED GOVERNMENT FACILITY. YEAR 1990 OPERATED AS STANDBY (UTILITY BLACK START) WITH ANNUAL HOURS OF LESS THAN 1200 HOURS PER YEAR. LAST RUN IN 2020. THESE UNITS ARE CURRENTLY CONFIGURED FOR DIESEL FUEL OPERATION. WE CAN CONVERT TO NATURAL GAS FOR AN ADDITIONAL FEE AND APPROXIMATELY 14 WEEKS LEAD TIME. DETAILED INSPECTION AND FAIR MARKET VALUE ASSESSMENT (FINANCE CREDIT WORTHY) HAVE BEEN COMPLETED WITHIN THE LAST 6 MONTHS. Learn More
- YY-2435 GE TM 2500 GAS TURBINE, MOBILE POWER 24 MW, GE STEWART & STEVENSON MOBILE PACKAGE, QUANTITY 1YY-2435 GE TM 2500 GAS TURBINE, MOBILE POWER 24 MW, GE STEWART & STEVENSON MOBILE PACKAGE, QUANTITY 1 YEAR: 1998 QUANTITY: 1 Learn More
- TT-7760 GE MODEL 7EA 62,480 KW BASE RATED, 80,000 KW ISO RATED, COMBUSTION TURBINE GENERATOR SET, 60 Hz, YEAR 2007TT-7760 GE MODEL 7EA 62,480 KW BASE RATED, 80,000 KW ISO RATED, COMBUSTION TURBINE GENERATOR SET, 60 Hz, YEAR 2007 SCOPE OF SUPPLY 1. HP/LP STEAM DRUMS 2. HEAT TRANSFORMER MODULES 3. DEAERATOR SYSTEM 4. DUCT BURNER SYSTEM 5. ISOLATION, VENT & DRAIN VALVES 6. HP/LP FLOW ELEMENTS 7. LADDERS AND WALKWAYS 8. FIELD ASSEMBLY FITTINGS 9. EXCLUDED 10. EMISSIONS CONTROL 11. BOILER FEED WATER PUMP 12. EXHAUST STACK 13. TRANSITION DUCTS QUANTITY: 1 Learn More
- TT-4794 SOLAR MARS 90 GAS TURBINE AND COGEN PLANT, 10000 KW, YEAR 1989 REBUILT 2014TT-4794 SOLAR MARS 90 GAS TURBINE AND COGEN PLANT, 10000 KW, YEAR 1989 REBUILT 2014 SOLAR MARS 90 GAS TURBINE AND COGEN PLANT CONDITION USED QUANTITY: 1 Learn More
- YY-2425 LM2500 PE SAC, 22.4 MW, WITH GE 6 STAGE POWER TURBINE, GAS TURBINES, QUANTITY 2YY-2425 LM2500 PE SAC, 22.4 MW, WITH GE 6 STAGE POWER TURBINE, GAS TURBINES, QUANTITY 2 ITEM 001 2500 HOURS AFTER ENGINE OVERHAUL ITEM 002 6500 HOURS AFTER ENGINE OVERHAUL Learn More
- YY-3262 SOLAR T60 GAS TURBINES, YEAR 2008, POWER AT ISO CONDITION 5513KW, VOLTAGE 10.5KV, FREQUENCY 50Hz, 3 SETSYY-3262 SOLAR T60 GAS TURBINES, YEAR 2008, POWER AT ISO CONDITION 5513KW, VOLTAGE 10.5KV, FREQUENCY 50Hz, 3 SETS THE 3 SETS OF SOLAR T60 GAS TURBINES WERE DELIVERED IN 2008 BY SOLAR TURBINES, THEY ARE DUAL FUEL TURBINES WITH DIESEL + COG, USED FOR POWER GENERATION. THE TURBINES WENT OUT OF SERVICE IN 2023 DUE TO ENERGY RESTRUCTURE, AND HAVE BEEN IDLE SINCE THEN. QUANTITY: 3 SETS Learn More
- TT-8183 SOLAR T70 GENERATOR SET – NEW, 7MW, YEAR 2017, 50 HzTT-8183 SOLAR T70 GENERATOR SET – NEW, 7MW, YEAR 2017, 50 Hz 1. T70 SOLAR GENERATOR SET MAIN ENGINE (GENERATOR, GAS TURBINE ENGINE, BASE, GEARBOX, STARTING SYSTEM, LUBRICATION SYSTEM, FUEL SYSTEM, CONTROL & MONITORING SYSTEM), 1200 X 420 X 435, WEIGHT: 65T, QUANTITY: 1 2. LADDER + PLATFORM, 500 X 220 X 110, WEIGHT: 2500KG, QUANTITY: 1 3. PROTECTIVE RAILING + TUBING, 510 X 230 X 200, WEIGHT: 150KG, QUANTITY: 1 4. EXHAUST MUFFLER HOUSING, 370 X 280 X 170, WEIGHT: 1000KG, QUANTITY: 1 Learn More
- YY-2241 124 MW GE FRAME 9E CHP COMPLETE POWER PLANT, 50 HzYY-2241 124 MW GE FRAME 9E CHP COMPLETE POWER PLANT, 50 Hz GAS TURBINE MODEL / TYPE: GENERAL ELECTRIC -GE FRAME 9E - PG9171(E) 50Hz; SINGLE TURBINE DESIGN OUTPUT: 124 MW; DESIGN HEAT RATE: NET HEAT RATE AT GENERATOR TERMINALS KJ/KWH 10 716 ±1%; DLN SYSTEM: DLN1; COMMISSIONING DATE: 2009; SHUT-DOWN DATE: NOVEMBER 2017. WELL PRESERVED TO DATE; TOTAL FIRED TIME: 56500; PLANNED MAINTENANCE DATE: 2012 HOT GAS PATH INSPECTION, 2015 MAJOR INSPECTION; RATED OUTPUT / TERMINAL VOLTAGE: 150 MVA – 15 KV; TRANSFORMERS: STEP UP TRANSFORMER: 153 MVA. TURBINE EFFICIENCY: NET HEAT RATE AT GENERATOR TERMINAL IS 10,760 kJ/kWh QUANTITY: 1 Learn More
- TT-4060-B GENERAL ELECTRIC LM2500 SAC COMPLETE POWER PLANT, 22MW, YEAR 2022, 5000 HOURS, 50HzTT-4060-B GENERAL ELECTRIC LM2500 SAC COMPLETE POWER PLANT, 22MW, YEAR 2022, 5000 HOURS, 50Hz WE OFFER TWO TURBINES AND GENERATOR ALONE OR THE TURBINE ALONE, GENERATION 2 QUANTITY: 2 Learn More
- TT-5219 GE 9HA GAS TURBINE PACKAGE – NEW, 373 MW, 50Hz, YEAR 2015, DUAL FUELTT-5219 GE 9HA GAS TURBINE PACKAGE – NEW, 373 MW, 50Hz, YEAR 2015, DUAL FUEL BRAND: GE TURBINES MODEL: 9HA.01 NEW/UNUSED DUAL FUEL CONDITION: NEW YEAR: 2015 Learn More