Search results for: 'turbine genera'
- Related search terms
- turbine T
- generator H
- Generat'
- turbine generator
- Generator po
-
YY-3556 4 X 60 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE POWER PLANTYY-3556 4 X 60 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE POWER PLANT HISTORY: THE POWER PLANT CONSISTS OF X 50 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE, ALL OF YEAR: 2011, 7000 HRS SINCE NEW EACH, 3000 RPM, 50 Hz, X 13 MW SIEMENS SST 300 STEAM TURBINE WITH 5000 HOURS EACH. PLANT WAS COMMISSIONED AND PUT INTO OPERATION IN 2012. QUNATITY: 1 Learn More -
TT-6503 COMPLETE GE LM2500, 23MW, 13.8KV, 60Hz, YEAR 1990TT-6503 COMPLETE GE LM2500, 23MW, 13.8KV, 60Hz, YEAR 1990 WELL MAINTAINED GOVERNMENT FACILITY. YEAR 1990 OPERATED AS STANDBY (UTILITY BLACK START) WITH ANNUAL HOURS OF LESS THAN 1200 HOURS PER YEAR. LAST RUN IN 2020. THESE UNITS ARE CURRENTLY CONFIGURED FOR DIESEL FUEL OPERATION. WE CAN CONVERT TO NATURAL GAS FOR AN ADDITIONAL FEE AND APPROXIMATELY 14 WEEKS LEAD TIME. DETAILED INSPECTION AND FAIR MARKET VALUE ASSESSMENT (FINANCE CREDIT WORTHY) HAVE BEEN COMPLETED WITHIN THE LAST 6 MONTHS. Learn More -
TT-1418 SOLAR TITAN 130 GAS TURBINE, 50Hz / 60Hz, YEAR 2007TT-1418 SOLAR TITAN 130 GAS TURBINE, 50Hz / 60Hz, YEAR 2007 SOLAR TITAN 130 GAS TURBINE 15,000KWE 11,170 RPM / 60Hz 11,197 RPM / 50Hz FUEL GAS QUANTITY: 1 Learn More -
TT-1650 SOLAR TURBINE T60 MOBILE UNIT, 60Hz, YEAR 2018, 4.8 MWTT-1650 SOLAR TURBINE T60 MOBILE UNIT, 60Hz, YEAR 2018, 4.8 MW SOLAR TURBINE T60 MOBILE UNIT 60Hz YEAR 2018 TYPE: STANDARD BRAND: SOLAR CATEGORY: ENGINES/GENERATORS/MOTORS/TRANSMISSIONS SUBCATEGORY: TURBINE IN STOCK: YES CONDITION: EXCELLENT QUANTITY: 2 Learn More -
YY-2894 NEW SIEMENS SGT 400, YEAR 2018YY-2894 NEW SIEMENS SGT 400, YEAR 2018 SIEMENS SGT 400 (12.9 MW) GAS TURBINE · 11-STAGE COMPRESSOR, 6 COMBUSTION CHAMBERS, 2-STAGE POWER TURBINE · GAS FUEL SYSTEM · DLE COMBUSTION SYSTEM · HOT-END DRIVE · 2-SHAFT ENGINE · LEFT-HAND EXHAUST · MAIN LUBRICATION PUMP · EQUIVALENT OPERATING HOURS : 0H · TOTAL STARTS : 0 · NEW, NEVER INSTALLED OR COMMISSIONED QUANTITY: 1 Learn More -
TT-1818 SIEMENS COMBINED CYCLE COMPLETE POWER PLANT, 420 MW, YEAR 2009 TO 2010TT-1818 SIEMENS COMBINED CYCLE COMPLETE POWER PLANT, 420 MW, YEAR 2009 TO 2010 SIEMENS ELECTRIC YEAR 2009 TO 2010 COMBINED CYCLE COMPLETE POWER PLANT 420 MW COMBINED CYCLE PLANT USED IMMEDIATE DELIVERY Learn More -
YY-3080 SIEMENS EQUIPMENT FOR SALEYY-3080 SIEMENS EQUIPMENT FOR SALE FOR SALE 2013 IN FACTORY PACKAGING Learn More -
YY-2535 GE LM6000PA 42+7MW CHP PLANTYY-2535 GE LM6000PA 42+7MW CHP PLANT THE EXTENSIVE LIST OF ACCOMPANYING EQUIPMENT INCLUDES: 1. GE LM6000PA GAS TURBINE EQUIPPED WITH WATER INJECTION, PAIRED WITH A BRUSH ALTERNATOR WITH 42 MW OUTPUT CAPACITY. THIS GAS TURBINE SUPPORTS NATURAL GAS OR DISTILLATE FUEL. 2. GT MK V CONTROL UNIT WITH AUXILIARY SYSTEMS. 3. SIEMENS BACK PRESSURE STEAM TURBINE WITH 7MW OUTPUT CAPACITY. 4. NOOTER ERIKSON HRSG CAPABLE OF SUPPLEMENTARY FIRING WITH NATURAL GAS OR DISTILLATE FUEL. 5. DUAL BELLIS AND MORCOM THREE-STAGE RECIPROCATING NATURAL GAS COMPRESSORS. 6. WATER TREATMENT PLANT COMPOSED OF TWIN BED RESIN EXCHANGE UNITS AND MIXED BED UNITS. 7. MASSIVE STORAGE TANKS FOR DISTILLATE OIL AND HEAVY FUEL OIL, COMPLETE WITH NECESSARY PIPING AND PUMPS. 8. TWO 11/132 KV TRANSFORMERS RATED AT 40 MVA EACH. 9. STANDBY DIESEL GENERATOR FOR BACKUP POWER. 10. SERCK DISTRIBUTED CONTROL SYSTEM (DCS) FOR INTEGRATED CONTROL AND MONITORING. 11. THREE CONTROL AND GENERAL SERVICE AIR COMPRESSORS. 12. AN EXTENSIVE FIRE DETECTION AND SUPPRESSION SYSTEM, SECURITY CAMERAS, AND GAS DETECTION SYSTEM FOR SAFETY AND SECURITY. 13. A CBISS CONTINUOUS EMISSIONS MONITORING SYSTEM (CEMS) TO ENSURE ADHERENCE TO ENVIRONMENTAL STANDARDS. ALL THE NECESSARY CABLING, TRANSFORMERS, SWITCHGEAR, AND PRESSURE-REDUCING STATIONS ASSOCIATED WITH THE ABOVE-MENTIONED PLANT ARE INCLUDED. A BONUS OF UNIQUE SPARE PARTS, EXTENSIVE MANUALS, RECORDS, AND DRAWINGS ARE ALSO PART OF THE PACKAGE, ENSURING SMOOTH OPERATION AND MAINTENANCE. A GE LM6000PA CHP PLANT REPRESENTS A ROBUST, EFFICIENT SOLUTION TO YOUR POWER AND HEATING NEEDS, OFFERING THE RELIABILITY AND FLEXIBILITY NEEDED FOR YOUR OPERATIONS. QUANTITY: 1 UNIT AVAILABLE FOR PURCHASE Learn More -
TT-7276 GENERAL ELECTRIC 7FA.03 7FA.04 UNIT ROTOR - NEWTT-7276 GENERAL ELECTRIC 7FA.03 7FA.04 UNIT ROTOR - NEW 1. GENERAL ELECTRIC 7FA.03 7FA.04 UNIT ROTOR 2. BRAND: GENERAL ELECTRIC 3. MODEL: 7FA.03/.04 4. TYPE: GAS TURBINES 5. CONDITION: NEW 6. TOTAL RUNNING HOURS: 0 7. EXPECTED ROTOR LIFE (FFH): 144000 8. WARRANTY TYPE: ECOLIFE™ Learn More -
TT-4060-B GENERAL ELECTRIC LM2500 SAC COMPLETE POWER PLANT, 22MW, YEAR 2022, 5000 HOURS, 50HzTT-4060-B GENERAL ELECTRIC LM2500 SAC COMPLETE POWER PLANT, 22MW, YEAR 2022, 5000 HOURS, 50Hz WE OFFER TWO TURBINES AND GENERATOR ALONE OR THE TURBINE ALONE, GENERATION 2 QUANTITY: 2 Learn More