Search results for: 'combined cycle'
- Related search terms
- Combined
- combined c
- COMBINED CYCLE COMPLETE POWER PLANT
- combined+cycle
- combined data
-
K-2541 SIEMENS WESTINGHOUSE AND MITSUBISHI COMBINED CYCLE PLANT 73MW YEAR 1999K-2541 SIEMENS WESTINGHOUSE AND MITSUBISHI COMBINED CYCLE PLANT 73MW YEAR 1999
MAKE: SIEMENS WESTINGHOUSE AND MITSUBISHI
NATURAL GAS
73 MW
YEAR 1999
50 HZQUANTITY: 1
Learn More -
M-4835 POWER AND INDUSTRIAL PLANTS FOR SALEREFERENCE NUMBER: M-4835 (1111VEHJXX10) L POWER AND INDUSTRIAL PLANTS FOR SALE QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 230 COMBINED CYCLE GAS TURBINE POWER PLANT SIEMENS V94-2 1988 1 220 COMBINED CYCLE POWER PLANT 50 HZ, FUEL: DUAL FUEL (NATURAL GAS OR HFO/DIESEL) GE FRAME 6B CCPP 1992, RUNNING HOURS: 135 000, PREUSED 1 180 GAS TURBINE 125 MW, STEAM TURBINE 55 MW, 50 HZ, FUEL LFO AND NG GE FRAME 9E CCPP 2005, RUNNING HOURS: 2000 2 128 COMPLETE POWER PLANTS, 15 KV, FUEL: NATURAL GAS AND LIGHT OIL GE FRAME PG9171E NEW 2 127 GAS TURBINE PACKAGES FIAT AVIO MODEL TG 50 – D5 1998,DISMANTLED, OVERHAULED, UPGRADED FROM SIEMENS AND DISMANTLED 2 125 COMPLETE PLANT, 2 UNITS ABB GAS TURBINE PACKAGES, FUEL: DUAL FUEL, 50 HZ ABB, 50WT 18H-66 1995, JUST OVERHAULED, WARRANTY POSSIBLE 1 93 COMBINED CYCLE POWER PLANT. FUEL : NATURAL GAS GE FRAME 6FA 1997 MAJOR INSPECTION IN 2009 1 73 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. SIEMENS WESTINGHOUSE AND MITSUBISHI. 1999, RUNNING HOURS 97 000 1 70 COMBINED CYCLE POWER PLANT THOMASSEN/ABB 2009, RUNNING HOURS UNDER 90 000 CONDITION GOOD, 2009 OVERHAULED 5 66 GAS TURBINE PACKAGES, 50 OR 60 HZ ROLLS ROYCE, TRENT 60 2014, RUNNING HOURS ZERO 3 49 GAS TURBINE POWER PLANT, 50 HZ 3 UNITS GE LM 6000 PC 2004, RUNNING HOURS 6000 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 46 COMPLETE PLANT, INCLUDES 5 GAS TURBINE PACKAGES, INCLUDING 1 STEAM TURBINE, BOILER AND AUXILIARIES. FUEL: NATURAL GAS AND NAPHTA. 50 HZ. SIEMENS TYPHOON AND ALSTOM. 2000, LOW HOURS, STILL IN OPERATION 1 42 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. GE LM 6000PA 1997, LAST HOT END OVERHAUL WAS AT 86.080 HOURS IN AUG 2010 1 41 GAS TURBINE PACKAGE WITH HRSG, 50HZ FUEL: NATURAL GAS/FUEL OIL THOMASSEN PG-6541 1995, LAST OVERHAUL AT 118350 1 40 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS AND LIGHT OIL. 50 HZ. GE FRAME 6 B, DRY LOW NOX 1992, RECENTLY OVERHAULED, STILL GOOD FOR MORE THAN 24.000 RUNNING HOURS. READY TO SHIP. 5 37 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ SGT 750 SIEMENS NEW, ZERO HOURS 1 31,2 GAS TURBINE PACKAGES, 31,2 MW , 50/60 HZ, SGT 700 NEW, ZERO HOURS 5 31 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ GE TM2500 NEW 1 29,65 GAS TURBINE GENERATOR, 50 HZ, 11 KV SGT 700 2011, RUNNING HOURS ZERO (NEW) 1 27 COMBINED CYLE POWER PLANT, 27 MW, NATURAL GAS GE RLM 2500 PE AND ALSTOM STEAM TURBINE GAS TURBINE 1994, STEAM TURBINE 1996 1 26,59 GAS TURBINE, FUEL: GAS FRAME 5, PG-5371 PA 1995, RUNNING HOURS 174,104 4 24,6 CORE ENGINE FUEL: NATURAL GAS, 50 HZ SIEMENS SGT 600 (EX ABB GT 10B) 1994-1997, ZERO HOUR OVERHAULED 1 16 GAS TURBINE PACKAGE DUEAL FUEL ROLLS ROYCE AVON 1534-102L ZERO HOUR OVERHAULED IN 2008 1 14,25 NATURAL GAS ENGINE SOLAR TITAN 130 SOLONOX, 50 HZ TURBOMACH T19501 2007, ZERO RUNNING HOURS, AS NEW 3 12,9 GAS TURBINES SIEMENS, 60 HZ SIEMENS SGT 400 2014, NEW NEVER USED 1 11,86 GAS TURBINE, 60 HZ SOLAR MARS 100 15000 SOLONOX 1996, RUNNING HOURS 34 000 SINCE LAST OVERHAUL 2 9,2 CHP PLANT ELECTRIC, NATURAL GAS AND LIGHT DIESEL&BOTH SOLAR CENTAUR 50 T5701 2005 AND 2008, RUNNING HOURS 26 000 AND 2 500 1 8,8 COMBINED CYCLE GAS TURBINE POWER PLANT. 60 HZ. SOLAR MARS 90. 1989, LAST MAJOR OVERHAUL IN 2004, ONLY 1225 RUNNING HOURS 1 7,5 NATURAL GAS ENGINE SOLAR TAURUS T70, 50 HZ TURBOMACH SOLONOX + WHRB 2007, ZERO RUNNING HOURS AS NEW 1 5,5 GAS TURBINE, 50 HZ, NATURAL GAS SGT 200 1989, RUNNING HOURS 126 340 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 5,2 DUAL NATURAL GAS AND OIL ENGINE TAURUS 60, 50 HZ SOLAR TAURUS 60, SOLONOX T7301 1998, RUNNING HOURS17 700 1 1,4 GAS TURBINE PACKAGE INCL. HRSG, 50 HZ KAWASAKI KA 1334 1995, RUNNING HOURS AFTER MAJOR OVERHAUL 4000 Learn More -
C-3994 BARGEMOUNTED POWER PLANT, CAPACITY 220MWC-3994 BARGEMOUNTED POWER PLANT, CAPACITY 220MW
A. ONCE THROUGH STEAM GENERATOR
B. BARGE
C. CHILLERS
D. AIR COMPRESSOR
E. GAS TURBINE
F. STEAM TURBINE
G. FEEDWATER SYSTEM
H. CLOSED COOLING WATER SYSTEM
I. AUXILIARY COOLING WATER SYSTEM
J. CONDENSATE POLISHING UNIT (CPU)
K. WASTE WATER SYSTEM
L. PLANT ELECTRICAL SYSTEM
M. BLACK START DG SET
N. PLANT CONTROLS AND INSTRUMENTATION
O. PLANT FIRE FIGHTING SYSTEM
P. START UP VACUUM SYSTEM
Q. STEAM TURBINE DEAERATING CONDENSERQUANTITY: 1 PLANT
Learn More -
V-2042 WATER RECIRCULATION SYSTEM FOR WATERJETSV-2042 WATER RECIRCULATION SYSTEM FOR WATERJETS 6 LITERS PER MINUTE MAXIMUM JET HEAD USES 1 TO 2 LITERS PER MINUTE FILTRATION: FROM 5 TO 10 MICRONS Learn More -
TT-7505 BIANCO/CORINO/MARIO CROSTA/GUIDO/ALEA/SPEROTTO RIMAR/TMT/BISIO/SOC.AN.COMI/F.REGIS/KARL MAYER/ROSTONI/COMAT/SAVIO ESPERO MACHINES FOR SALE, YEAR 1986 TO 2006TT-7505 BIANCO/CORINO/MARIO CROSTA/GUIDO/ALEA/SPEROTTO RIMAR/TMT/BISIO/SOC.AN.COMI/F.REGIS/KARL MAYER/ROSTONI/COMAT/SAVIO ESPERO MACHINES FOR SALE, YEAR 1986 TO 2006 Learn More -
YY-3485 PROCESSING AND PACKAGING LINE FOR COFFEE PODS (ESE Ø44mm)YY-3485 PROCESSING AND PACKAGING LINE FOR COFFEE PODS (ESE Ø44mm) Learn More -
TT-7277 ABB UNUSED FUEL GAS COMPRESSOR FOR 2000MW COMBINED POWER PLANT, YEAR 1996, 60HzTT-7277 ABB UNUSED FUEL GAS COMPRESSOR FOR 2000MW COMBINED POWER PLANT, YEAR 1996, 60Hz 1. CONDITION: USED 2. REPORTEDLY UNUSED FUEL GAS COMPRESSOR FOR 2000MW COMBINED POWER PLANT. 3. BRAND: ABB POWER GENERATOR 4. MANUFACTURING YEAR: 1996 5. CAPACITY FOR 1300MW GAS TURBINE (2000MW COMBINED CYCLE POWER PLANT) QUANTITY: 1 Learn More -
TT-1508 SIEMENS SGT-800 GENERATOR SET, 50 Hz, 47.5 MWTT-1508 SIEMENS SGT-800 GENERATOR SET, 50 Hz, 47.5 MW GAS TURBINE GENERATOR PLANT THIS USED SGT GENSET HAS FORMERLY BEEN USED BY A PAPER FACTORY AND HAS BEEN PROFESSIONALLY DISMANTLED AND PACKED BY THE ORIGINAL MANUFACTURER SIEMENS IN MARCH 2022. QUANTITY: 2 SETS Learn More -
YY-2425 LM2500 PE SAC, 22.4 MW, WITH GE 6 STAGE POWER TURBINE, GAS TURBINES, QUANTITY 2YY-2425 LM2500 PE SAC, 22.4 MW, WITH GE 6 STAGE POWER TURBINE, GAS TURBINES, QUANTITY 2 ITEM 001 2500 HOURS AFTER ENGINE OVERHAUL ITEM 002 6500 HOURS AFTER ENGINE OVERHAUL Learn More -
M-4868 PUB BREWERY 20HLREFERENCE NUMBER: M-4868 (1111275NKG10RX) L PUB BREWERY 20HL SPECIFICATION: 1. MALT HANDLING - CYLINDER-CONIC MALT SILO WITH 25M³ CONTENT, MADE IN FIBRE GLASS / PLASTIC, STANDING OUTDOOR ON STEEL CONSTRUCTION - MALT CONVEYORS / SPIRAL CONVEYOR INTO 1ST FLOOR - 2-ROLLER MALT MILL - GRIST CASE - FALL PIPE IN MASH COPPER (FOR DUST FREE MASHING-IN) - GIBBET-LIFT FOR BAGGED SPECIAL MALTS 2. BREWHOUSE TOWER BREWHOUSE FOR 20 HL / BREW, COMPLETE IN STAINLESS STEEL, BUILT 1994, STEAM HEATED, ISOLATED AND COVERED WITH STAINLESS STEEL SHEET, 2 CRANE EYELET, 2 STAINLESS STEEL PLATFORM, WITH: - MASH- / WORT COPPER WITH BOTTOM HEATING ZONE AND INTERIOR COOKER, SIDEWAYS AGITATOR, MANWAY ENTRANCE HATCH, LIGHTNING, STEAM REGULATION VALVE - LAUTER TUN, WITH STAINLESS STEEL RAKING MACHINE WITH SEW-DRIVE FROM TOP, WITH SPENT GRAINS SLIDER, STAINLESS STEEL FALSE BOTTOM, SPENT GRAINS HATCH, VERTICAL SIGHT GLASS, LIGHTNING, SPRAY HEAD, DOME LID WITH BUILT IN CONTROL CABINET - SPINDLE STATION WITH WASHING TABLE IN STAINLESS STEEL, ABOUT 1,5M WALL ASSEMBLED - HOT WATER TANK, WITH 30 HL, IN STAINLESS STEEL, ISOLATED AND COVERED WITH STAINLESS STEEL SHEET, HEATABLE, WITH MANWAY IN THE WALL, LEVEL DISPLAY - PRESSURE RAISING PUMP - WORT COOLING, 1-STAGE PLATE APPARATUS - WORT AERATION IN STAINLESS STEEL 3. FERMENTING- AND STORAGE TANKS - 5 CCTS, WITH 40 HL NET / 46 HL GROSS CONTENT, ALL TANKS 3 BAR, BUILT 1994, STANDING ON FEET, PI-ISOLATED FULLY WELDED WITH STAINLESS STEEL JACKET, WITH JACKET COOLING FROM CONE BELOW TO ½ WALL 60 LT COOLING JACKET 3 BAR, WITH MANWAY IN THE WALL, 2 OUTLETS WITH BUTTERFLY VALVES, TEMPERATURE SENSOR PT100, SPRAY HEAD, PULLED DOWN CLEANING PIPE WITH BUTTERFLY VALVE, BUNGING ARMATURE, OVER PRESSURE VALVE, SAMPLER, 2 CRANE EYELETS, 2 OF THE TANKS WITH LEVEL DISPLAY - DIGITAL TEMPERATURE CONTROL FOR 5 TANKS IN STAINLESS STEEL CONTROL CABINET - CIRCULATING PUMP IN STAINLESS STEEL, MOBILE, WITH SWITCH - MANY GOOD BEER HOSES - 6 X 10 HL BEER DISPENSING TANKS, MAKE DUO TANK, BUILT 2002, 3,0 / 4,3 BAR, COOL ABLE, ISOLATED WITH STAINLESS STEEL-JACKET FULLY WELDED, FOR INLINE-OPERATION, LYING IN RACK, SCREWED STAINLESS STEEL RACK, WITH PRESSURE ARMATURE, OUTLET ARMATURE WITH REDUCTION TO BARE CONNECTION, MANWAY WITH BIG SIGHT GLASS IN MANWAY LED - PANEL FOR 3 TYPES OF BEER 4. FILLING COMBINED BOTTLE-/KEGGING PLANT, WITH 1 CLEANING TUB, HEATED AND 1 REBUILT KEG: - BOTTLE CLEANING MACHINE FOR CLEANING OF 8 BOTTLES INSIDE AND OUTSIDE, FOR UP TO 2LT BOTTLES - BOTTLE FILLING STATION WITH HUB CYLINDER FROM BELOW, WITH SPLINTER PROTECTION - COMBINED KEG-CLEANING- AND FILLING STATION - BUILT IN CONTROL CABINET WITH SIEMENS S5 CONTROL AND OPERATING CONSOLE OP 7 5. OTHER EQUIPMENT - STEAM BOILER FOR ABOUT F280 KG/H, WITH GAS BURNER, FULLY SERVICED ON 4TH AUGUST 2014, BUILT IN 1994 - CONDENSATE TUB IN STAINLESS STEEL AT WALL AND SECOND SMALL S/S-TUB - WATER TREATMENT - STEAM REGULATION AND CONDENSATE VALVES IN CYCLE - STAINLESS STEEL CHIMNEY PLANT ABOUT 8-10M - AIR COMPRESSOR WITH WIND KETTLE, BUILT 1994 - COOLING PLANT / COLD WATER PLANT, MAKE L&R KÄLTETECHNIK, TYPE: WRK-17/SL/-5, PLANT BUILT 1997, COOLING AGENT R 407 C, WITH NEW COMPRESSOR AND NEW PLATE HEAT EXCHANGER IN 2014 FOR 10,000 € INVESTED, EVAPORATOR WITH 2 VENTILATOR OUTSIDE HANGING ON THE WALL 6.1 OTHERS - ABOUT 100 KETS, MAKE SCHÄFER, PLUS-KEGS, FLAT FITTING IN DIFFERENT SIZES, NEUTRAL - PARTY-KEGS, WITH BAVARIAN TAP, PU-COVERED IN BLACK AND WITH WOOD-OPTIC - ABOUT 800 NEUTRAL CLIP LOCK BOTTLES EACH 1 LT 6.2 DIMENSIONS THE ROOM HEIGHT IN BREWHOUSE AND CCTS IS 4.50M. THE PLANT AS ASSEMBLED ON 10.75 X 4.38M. PLEASE NOTE THAT THE BREWERY IS ONLY AVAILABLE AS A SINGLE SALE QUANTITY AVAILABLE: 1 Learn More