Search results for: 'frame tu'
- Related search terms
- frame 9
- frame 7
- Frame 500
- frame 7 tu
- frame ben
-
TT-3044 GE FRAME 9 GAS TURBINES, 123 MW, 50 Hz, 10500 VOLT, NATURAL GAS, 28,000 HOURS, YEAR 1997TT-3044 GE FRAME 9 GAS TURBINES, 123 MW, 50 Hz, 10500 VOLT, NATURAL GAS, 28,000 HOURS, YEAR 1997 QUANTITY: 2 Learn More -
TT-7386 GE FRAME 9E GAS TURBINE PACKAGE PG9171 WITH SEQUENTIAL DLN AND POWER AUGMENTATION, YEAR 2009TT-7386 GE FRAME 9E GAS TURBINE PACKAGE PG9171 WITH SEQUENTIAL DLN AND POWER AUGMENTATION, YEAR 2009 1. GASTURBINE MODEL: FRAME 9E 2. BRAND: GE 3. YEAR OF MANUFACTURING: 2009 4. CERTIFICATE MODULE: A 5. PED/ MODEL/ CATEGORY: G/IV 6. NOBO NUMBER AS PER INSTALLATION IN 2010: 38 7. NOMINAL SPEED: 3000 RPM 8. NET POWER OUTPUT AS PER ORIGINAL SPECIFICATION: 127.214 MWE 9. UNIT DATE OF INSTALLATION/ COMMISSIONING: 2010 QUANTITY: 1 Learn More -
TT-5047 GENERAL ELECTRIC FRAME 7EA NATURAL GAS TURBINE GENERATOR SET, 84 MW, YEAR 1997TT-5047 GENERAL ELECTRIC FRAME 7EA NATURAL GAS TURBINE GENERATOR SET, 84 MW, YEAR 1997 BRAND: GE TURBINES MODEL: GE 7EA CONDITION: USED QUANTITY: 1 Learn More -
YY-2966 124 MW GE FRAME 9E SIMPLE CYCLE COMPLETE GAS TURBINE PACKAGEYY-2966 124 MW GE FRAME 9E SIMPLE CYCLE COMPLETE GAS TURBINE PACKAGE Learn More -
C-2932 TOYOTA RX 240 RING FRAME WITH 1008 SPINDLES, TUBE LENGTH 210mm, YEAR 1996C-2932 TOYOTA RX 240 RING FRAME WITH 1008 SPINDLES, TUBE LENGTH 210mm, YEAR 1996
TOYOTA RING FRAME
MODEL: RX 240
YEAR: 1996
NO OF SPINDLES: 1008
GAUGE: 70mm
CRADLE: SHORT
TOPARMS: SKF PK 2025
SUCTION: FLUTE TYPE PNEUMAFILL
DOFFER: AUTOMATIC
TOP ROLLER CLEARER: AVAILABLE
CREEL: 5 ROW
OHTC: ELECTROJET
WHARVE DIAMETER: 18.5mm
TUBE LENGTH: 210mm
MAIN MOTOR: 45 KWQUANTITY: 1
Learn More -
T-1652 SGT 400 GAS TURBINE, 50Hz, YEAR 2017, 11 KV, 12.9 MWT-1652 SGT 400 GAS TURBINE, 50Hz, YEAR 2017, 11 KV, 12.9 MW SGT 400 GAS TURBINE TYPE: STANDARD BRAND: SIEMENS CATEGORY: ENGINES/GENERATORS/MOTORS/TRANSMISSIONS SUBCATEGORY: TURBINE IN STOCK: YES CONDITION: EXCELLENT TYPE: UNUSED SGT-400 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOM: UNIT(S) TO BE SUPPLIED ARE UNUSED, WITH ZERO RUNNING HOURS, NEVER INSTALLED THESE UNITS HAVE BEEN STORED INDOORS SINCE MANUFACTURE. QUANTITY: 2 Learn More -
M-4835 POWER AND INDUSTRIAL PLANTS FOR SALEREFERENCE NUMBER: M-4835 (1111VEHJXX10) L POWER AND INDUSTRIAL PLANTS FOR SALE QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 230 COMBINED CYCLE GAS TURBINE POWER PLANT SIEMENS V94-2 1988 1 220 COMBINED CYCLE POWER PLANT 50 HZ, FUEL: DUAL FUEL (NATURAL GAS OR HFO/DIESEL) GE FRAME 6B CCPP 1992, RUNNING HOURS: 135 000, PREUSED 1 180 GAS TURBINE 125 MW, STEAM TURBINE 55 MW, 50 HZ, FUEL LFO AND NG GE FRAME 9E CCPP 2005, RUNNING HOURS: 2000 2 128 COMPLETE POWER PLANTS, 15 KV, FUEL: NATURAL GAS AND LIGHT OIL GE FRAME PG9171E NEW 2 127 GAS TURBINE PACKAGES FIAT AVIO MODEL TG 50 – D5 1998,DISMANTLED, OVERHAULED, UPGRADED FROM SIEMENS AND DISMANTLED 2 125 COMPLETE PLANT, 2 UNITS ABB GAS TURBINE PACKAGES, FUEL: DUAL FUEL, 50 HZ ABB, 50WT 18H-66 1995, JUST OVERHAULED, WARRANTY POSSIBLE 1 93 COMBINED CYCLE POWER PLANT. FUEL : NATURAL GAS GE FRAME 6FA 1997 MAJOR INSPECTION IN 2009 1 73 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. SIEMENS WESTINGHOUSE AND MITSUBISHI. 1999, RUNNING HOURS 97 000 1 70 COMBINED CYCLE POWER PLANT THOMASSEN/ABB 2009, RUNNING HOURS UNDER 90 000 CONDITION GOOD, 2009 OVERHAULED 5 66 GAS TURBINE PACKAGES, 50 OR 60 HZ ROLLS ROYCE, TRENT 60 2014, RUNNING HOURS ZERO 3 49 GAS TURBINE POWER PLANT, 50 HZ 3 UNITS GE LM 6000 PC 2004, RUNNING HOURS 6000 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 46 COMPLETE PLANT, INCLUDES 5 GAS TURBINE PACKAGES, INCLUDING 1 STEAM TURBINE, BOILER AND AUXILIARIES. FUEL: NATURAL GAS AND NAPHTA. 50 HZ. SIEMENS TYPHOON AND ALSTOM. 2000, LOW HOURS, STILL IN OPERATION 1 42 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. GE LM 6000PA 1997, LAST HOT END OVERHAUL WAS AT 86.080 HOURS IN AUG 2010 1 41 GAS TURBINE PACKAGE WITH HRSG, 50HZ FUEL: NATURAL GAS/FUEL OIL THOMASSEN PG-6541 1995, LAST OVERHAUL AT 118350 1 40 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS AND LIGHT OIL. 50 HZ. GE FRAME 6 B, DRY LOW NOX 1992, RECENTLY OVERHAULED, STILL GOOD FOR MORE THAN 24.000 RUNNING HOURS. READY TO SHIP. 5 37 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ SGT 750 SIEMENS NEW, ZERO HOURS 1 31,2 GAS TURBINE PACKAGES, 31,2 MW , 50/60 HZ, SGT 700 NEW, ZERO HOURS 5 31 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ GE TM2500 NEW 1 29,65 GAS TURBINE GENERATOR, 50 HZ, 11 KV SGT 700 2011, RUNNING HOURS ZERO (NEW) 1 27 COMBINED CYLE POWER PLANT, 27 MW, NATURAL GAS GE RLM 2500 PE AND ALSTOM STEAM TURBINE GAS TURBINE 1994, STEAM TURBINE 1996 1 26,59 GAS TURBINE, FUEL: GAS FRAME 5, PG-5371 PA 1995, RUNNING HOURS 174,104 4 24,6 CORE ENGINE FUEL: NATURAL GAS, 50 HZ SIEMENS SGT 600 (EX ABB GT 10B) 1994-1997, ZERO HOUR OVERHAULED 1 16 GAS TURBINE PACKAGE DUEAL FUEL ROLLS ROYCE AVON 1534-102L ZERO HOUR OVERHAULED IN 2008 1 14,25 NATURAL GAS ENGINE SOLAR TITAN 130 SOLONOX, 50 HZ TURBOMACH T19501 2007, ZERO RUNNING HOURS, AS NEW 3 12,9 GAS TURBINES SIEMENS, 60 HZ SIEMENS SGT 400 2014, NEW NEVER USED 1 11,86 GAS TURBINE, 60 HZ SOLAR MARS 100 15000 SOLONOX 1996, RUNNING HOURS 34 000 SINCE LAST OVERHAUL 2 9,2 CHP PLANT ELECTRIC, NATURAL GAS AND LIGHT DIESEL&BOTH SOLAR CENTAUR 50 T5701 2005 AND 2008, RUNNING HOURS 26 000 AND 2 500 1 8,8 COMBINED CYCLE GAS TURBINE POWER PLANT. 60 HZ. SOLAR MARS 90. 1989, LAST MAJOR OVERHAUL IN 2004, ONLY 1225 RUNNING HOURS 1 7,5 NATURAL GAS ENGINE SOLAR TAURUS T70, 50 HZ TURBOMACH SOLONOX + WHRB 2007, ZERO RUNNING HOURS AS NEW 1 5,5 GAS TURBINE, 50 HZ, NATURAL GAS SGT 200 1989, RUNNING HOURS 126 340 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 5,2 DUAL NATURAL GAS AND OIL ENGINE TAURUS 60, 50 HZ SOLAR TAURUS 60, SOLONOX T7301 1998, RUNNING HOURS17 700 1 1,4 GAS TURBINE PACKAGE INCL. HRSG, 50 HZ KAWASAKI KA 1334 1995, RUNNING HOURS AFTER MAJOR OVERHAUL 4000 Learn More -
YY-3279 SGT – 600 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOMYY-3279 SGT – 600 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOM UNIT(S) TO BE SUPPLIED ARE UNUSED, WITH ZERO RUNNING HOURS, NEVER INSTALLED. Learn More -
YY-3559 13 MW SIEMENS SGT-400 NATURAL GAS TURBINE GENSET 22 PICES 2022 NEW – UNUSEDYY-3559 13 MW SIEMENS SGT-400 NATURAL GAS TURBINE GENSET 22 PICES 2022 NEW – UNUSED DETAILS: 1. MANUFACTURER SIEMENS 2. MODEL SGT-400 3. YEAR 2022 4. CONDITION NEW 5. CATEGORY NATURAL GAS TURBINES 6. SUBCATEGORIES 10 - 99 MW 7. WATTAGE 13 MW 8. HOURS ZERO 9. FREQUENCY 50 Hz 10. FUEL TYPE NATURAL GAS 11. VOLTAGE 230 V 12. SIZE (L X W X H) 14.0 X 3.1 X 4.3 M 13. WEIGHT APPROX. 84 TON Learn More -
YY-3558 13 MW SIEMENS SGT-400 NATURAL GAS TURBINE GENSET 12 PICES 2022 NEW UNUSEDYY-3558 13 MW SIEMENS SGT-400 NATURAL GAS TURBINE GENSET 12 PICES 2022 NEW UNUSED DETAILS: 1. MANUFACTURER SIEMENS 2. MODEL SGT-400 3. YEAR 2022 4. CONDITION NEW 5. CATEGORY NATURAL GAS TURBINES 6. SUBCATEGORIES 10 - 99 MW 7. WATTAGE 13 MW 8. HOURS ZERO 9. FREQUENCY 50 Hz 10. FUEL TYPE NATURAL GAS 11. VOLTAGE 230 V 12. SIZE (L X W X H) 14.0 X 3.1 X 4.3 M 13. WEIGHT APPROX. 84 TON Learn More