Search results for: 'share'
- Related search terms
- share transfer
-
TT-2817 GENERAL ELECTRIC LM2500 PE SAC GAS TURBINE, 22.5 MW, WITH GE SIX-STAGE PTTT-2817 GENERAL ELECTRIC LM2500 PE SAC GAS TURBINE, 22.5 MW, WITH GE SIX-STAGE PT QUANTITY: 2 Learn More -
TT-2795 LM2500 CORE ENGINES, 22.5 MW WITH 649 TO 2320 HOURSTT-2795 LM2500 CORE ENGINES, 22.5 MW WITH 649 TO 2320 HOURS QUANTITY: 2 Learn More -
TT-1596 NORDMECCANICA SUPER SIMPLEX SOLVENTLESS LAMINATOR, WIDTH 1400mm, YEAR 1995TT-1596 NORDMECCANICA SUPER SIMPLEX SOLVENTLESS LAMINATOR, WIDTH 1400mm, YEAR 1995 NORDMECCANICA SUPER SIMPLEX SOLVENTLESS LAMINATOR BRAND: NORDMECCANICA MODEL: SUPER SIMPLEX YEAR: 1995 AVAILABLE: NOW QUANTITY: 1 Learn More -
L-4786 WAUKESHA VHP7044GSI GENERATORS, 1200 RPM, 50 & 60 HzL-4786 WAUKESHA VHP7044GSI GENERATORS, 1200 RPM, 50 & 60 Hz
CAN OPERATE AT 1150 KW, 1200 RPM, 60 Hz, 600/480 VAC
Learn More
OR
AT 1050 KW, 1000 RPM, 50 Hz, 400 VAC
WEATHER ENCLOSURE W/SKID
ENGINE DRIVEN RADIATOR ASSEMBLY
ENGINE CONTROLS & INTERFACE: WAUKESHA ENGINE ECU & AUXILIARY I/O BOX
KATO ALTERNATOR, 1200 KW / 1500 KVA, 6P6-3300, 6– POLES, 2 BEARING, 1200 RPM, 80 DEG C TEMP.
RISE (40 DEG. AMBIENT), IP-23 ENCLOSURE, PMG, CLASS 'H', 600/480 VOLT AC DUAL VOLTAGE, 3 PH,60HZ, 0.8 PF. FOUR (4) UNITS WITH
RENOLD COUPLING - 4 UNITS WITH MARATHON ALTERNATOR 480 VAC
ENGINE CONTROLS AND INTERFACE – ECU AND AUXILIARY I/O BOX
50 GALLON OIL MAKE-UP SYSTEM WITH LEVEL INDICATION -
CAPROLACTAM PLANT CAPACITY 60,000 MTPYCAPACITY: 60,000 MTPY THIS CAPROLACTAM FACILITY INCLUDES ALL INTERMEDIATE AND BYPRODUCT PLANTS. THE FACILITY STARTS WITH BENZENE AND FINISHES WITH CAPROLACTAM AND AMMONIUM SULFATE BYPRODUCT: CYCLOHEXANE PLANT – 79 KMTA CYCLOHEXANONE PLANT – 55 KMTA OXIMATION PLANT – 62 KMTA CAPROLACTAM PLANT – 60 KMTA AMMONIUM SULFATE – 108 KMTA INCINERATOR – 5 M3/HR LIQUID WASTE THE FACILITY HAD SOME UPGRADES OVER THE YEARS. THE MAJORITY OF THE SITE SHUT DOWN IN 2009, BUT THE CYCLOHEXANE UNIT RAN UNTIL AUGUST 2013. THE PROCESS WAS LICENSED FROM DUTCH STATE MINES (DSM), WITH ENGINEERING BY CHIYODA AND CONSTRUCTION BY MONTREAL. THE LICENSE HAS BEEN FULLY PAID. DOCUMENTATION IS COMPLETE AND WELL-ORGANIZED. MUCH OF IT IS ELECTRONIC AND HAS ALREADY BEEN SHARED WITH IPP. THE FACILITY RECEIVED ISO-9001 CERTIFICATION IN 1997 AND ISO-14001 CERTIFICATION IN 2004. DCS IS BY YOKOGAWA (CENTUM CS-3000) AND IS USED IN THE OXIMATION, CAPROLACTAM, AMMONIA SULFATE, AND INCINERATOR UNITS. THE PLANT HAS BEEN WELL-MAINTAINED AND IS STILL BEING KEPT UP WITH A STAFF OF FOUR EMPLOYEES. THERE IS A NITROGEN PAD ON THE PROCESS AND THEY ARE TURNING THE ROTATING EQUIPMENT MONTHLY. THE 15.1 HECTARES OF LAND CAN BE PURCHASED WITH THE FACILITY. THERE ARE ABUNDANT SPARE PARTS AVAILABLE WITH THE FACILITY. TRANSPORTATION TO AND FROM THE FACILITY BY ROAD IS EXCELLENT AND IT IS 24 KM TO THE NEAREST MAJOR PORT. THE PROCESS WAS LICENSED FROM DUTCH STATE MINES (DSM), WITH ENGINEERING BY CHIYODA AND CONSTRUCTION BY MONTREAL OF BRAZIL. THE LICENSE HAS BEEN FULLY PAID. RAW MATERIAL: BENZENE, HYDROGEN, AMMONIA, SULFURIC ACID Learn More