Search results for: 'Siemens gen'
- Related search terms
- generator H
- Generat'
- Generator po
- generator 60
- gen 4
-
YY-3076 NEW SIEMENS 24.5MW CONDENSING STEAM TURBINE - GENERATOR SET, YEAR 2013YY-3076 NEW SIEMENS 24.5MW CONDENSING STEAM TURBINE - GENERATOR SET, YEAR 2013 YEAR OF MANUFACTURE: 2013 CONDITION: NEW, UNUSED OPERATING HOURS: 0 STATUS: INSTALLED Learn More -
YY-2990 45MW / 50Hz SIEMENS SGT-800 GAS TURBINE GENERATOR SETYY-2990 45MW / 50Hz SIEMENS SGT-800 GAS TURBINE GENERATOR SET QUANTITY: 1 Learn More -
TT-3161 SIEMENS 701 DU GAS TURBINE GENERATOR SETS, 125 MW, 50HzTT-3161 SIEMENS 701 DU GAS TURBINE GENERATOR SETS, 125 MW, 50Hz QUANTITY: 2 Learn More -
YY-2470 47.5 MW SGT-800 SIEMENS GAS TURBINE GENERATOR FOR SALE (118120 EOH)YY-2470 47.5 MW SGT-800 SIEMENS GAS TURBINE GENERATOR FOR SALE (118120 EOH) ASK FOR DETAILS! QUANTITY: 1 Learn More -
YY-2469 45 MW SGT-800 SIEMENS GAS TURBINE GENERATOR FOR SALEYY-2469 45 MW SGT-800 SIEMENS GAS TURBINE GENERATOR FOR SALE ASK FOR DETAILS! QUANTITY: 1 Learn More -
T-1652 SGT 400 GAS TURBINE, 50Hz, YEAR 2017, 11 KV, 12.9 MWT-1652 SGT 400 GAS TURBINE, 50Hz, YEAR 2017, 11 KV, 12.9 MW SGT 400 GAS TURBINE TYPE: STANDARD BRAND: SIEMENS CATEGORY: ENGINES/GENERATORS/MOTORS/TRANSMISSIONS SUBCATEGORY: TURBINE IN STOCK: YES CONDITION: EXCELLENT TYPE: UNUSED SGT-400 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOM: UNIT(S) TO BE SUPPLIED ARE UNUSED, WITH ZERO RUNNING HOURS, NEVER INSTALLED THESE UNITS HAVE BEEN STORED INDOORS SINCE MANUFACTURE. QUANTITY: 2 Learn More -
TT-7680 SIEMENS SST 400 CONDENSING STEAM TURBINE, YEAR 2011, 50/60Hz, 30 MWTT-7680 SIEMENS SST 400 CONDENSING STEAM TURBINE, YEAR 2011, 50/60Hz, 30 MW SIEMENS SST 400 YEAR 2011 TYPE: SST 400 CONDENSING STEAM TURBINE WITH FOUR BLEEDS AND ONE EXTRACTION TURBOSE OUTPUT: (AT GENERATOR TERMINALS) NORMAL 30 MW MAXIMAL 31.88 MW MINIMAL 4.5 MW QUANTITY: 4 Learn More -
YY-3556 4 X 60 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE POWER PLANTYY-3556 4 X 60 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE POWER PLANT HISTORY: THE POWER PLANT CONSISTS OF X 50 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE, ALL OF YEAR: 2011, 7000 HRS SINCE NEW EACH, 3000 RPM, 50 Hz, X 13 MW SIEMENS SST 300 STEAM TURBINE WITH 5000 HOURS EACH. PLANT WAS COMMISSIONED AND PUT INTO OPERATION IN 2012. QUNATITY: 1 Learn More -
YY-3279 SGT – 600 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOMYY-3279 SGT – 600 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOM UNIT(S) TO BE SUPPLIED ARE UNUSED, WITH ZERO RUNNING HOURS, NEVER INSTALLED. Learn More -
YY-1794 FECKEN AND KIRFEL HORIZONTAL SPLITTING MACHINE, CUTTING WIDTH 2.400mm, YEAR OF CONSTRUCTION 2000, MODEL H24EYY-1794 FECKEN AND KIRFEL HORIZONTAL SPLITTING MACHINE, CUTTING WIDTH 2.400mm, YEAR OF CONSTRUCTION 2000, MODEL H24E DETAILS: MANUFACTURER: FECKEN-KIRFEL MODEL: H 24 E YEAR OF CONSTRUCTION: 2000 CONDITION: REFURBISHED (USED) Learn More