Search results for: 'Siemens genera'
- Related search terms
- genera
- Generator'
- generator new
- Generator powe
- Generator power pl
- YY-3559 13 MW SIEMENS SGT-400 NATURAL GAS TURBINE GENSET 22 PICES 2022 NEW – UNUSEDYY-3559 13 MW SIEMENS SGT-400 NATURAL GAS TURBINE GENSET 22 PICES 2022 NEW – UNUSED DETAILS: 1. MANUFACTURER SIEMENS 2. MODEL SGT-400 3. YEAR 2022 4. CONDITION NEW 5. CATEGORY NATURAL GAS TURBINES 6. SUBCATEGORIES 10 - 99 MW 7. WATTAGE 13 MW 8. HOURS ZERO 9. FREQUENCY 50 Hz 10. FUEL TYPE NATURAL GAS 11. VOLTAGE 230 V 12. SIZE (L X W X H) 14.0 X 3.1 X 4.3 M 13. WEIGHT APPROX. 84 TON Learn More
- YY-3558 13 MW SIEMENS SGT-400 NATURAL GAS TURBINE GENSET 12 PICES 2022 NEW UNUSEDYY-3558 13 MW SIEMENS SGT-400 NATURAL GAS TURBINE GENSET 12 PICES 2022 NEW UNUSED DETAILS: 1. MANUFACTURER SIEMENS 2. MODEL SGT-400 3. YEAR 2022 4. CONDITION NEW 5. CATEGORY NATURAL GAS TURBINES 6. SUBCATEGORIES 10 - 99 MW 7. WATTAGE 13 MW 8. HOURS ZERO 9. FREQUENCY 50 Hz 10. FUEL TYPE NATURAL GAS 11. VOLTAGE 230 V 12. SIZE (L X W X H) 14.0 X 3.1 X 4.3 M 13. WEIGHT APPROX. 84 TON Learn More
- T-1652 SGT 400 GAS TURBINE, 50Hz, YEAR 2017, 11 KV, 12.9 MWT-1652 SGT 400 GAS TURBINE, 50Hz, YEAR 2017, 11 KV, 12.9 MW SGT 400 GAS TURBINE TYPE: STANDARD BRAND: SIEMENS CATEGORY: ENGINES/GENERATORS/MOTORS/TRANSMISSIONS SUBCATEGORY: TURBINE IN STOCK: YES CONDITION: EXCELLENT TYPE: UNUSED SGT-400 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOM: UNIT(S) TO BE SUPPLIED ARE UNUSED, WITH ZERO RUNNING HOURS, NEVER INSTALLED THESE UNITS HAVE BEEN STORED INDOORS SINCE MANUFACTURE. QUANTITY: 2 Learn More
- TT-7680 SIEMENS SST 400 CONDENSING STEAM TURBINE, YEAR 2011, 50/60Hz, 30 MWTT-7680 SIEMENS SST 400 CONDENSING STEAM TURBINE, YEAR 2011, 50/60Hz, 30 MW SIEMENS SST 400 YEAR 2011 TYPE: SST 400 CONDENSING STEAM TURBINE WITH FOUR BLEEDS AND ONE EXTRACTION TURBOSE OUTPUT: (AT GENERATOR TERMINALS) NORMAL 30 MW MAXIMAL 31.88 MW MINIMAL 4.5 MW QUANTITY: 4 Learn More
- YY-3279 SGT – 600 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOMYY-3279 SGT – 600 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOM UNIT(S) TO BE SUPPLIED ARE UNUSED, WITH ZERO RUNNING HOURS, NEVER INSTALLED. Learn More
- YY-3556 4 X 60 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE POWER PLANTYY-3556 4 X 60 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE POWER PLANT HISTORY: THE POWER PLANT CONSISTS OF X 50 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE, ALL OF YEAR: 2011, 7000 HRS SINCE NEW EACH, 3000 RPM, 50 Hz, X 13 MW SIEMENS SST 300 STEAM TURBINE WITH 5000 HOURS EACH. PLANT WAS COMMISSIONED AND PUT INTO OPERATION IN 2012. QUNATITY: 1 Learn More
- TT-7585 SIEMENS SST-300 STEAM TURBINE - NEW, YEAR 2021, 50 HzTT-7585 SIEMENS SST-300 STEAM TURBINE - NEW, YEAR 2021, 50 Hz 1. BRAND NEW STEAM TURBINE SIEMENS SST-300 - IN FACTORY 2. PACKING FROM THE YEAR 2021 3. THIS TURBINE HAS NEVER BEEN INSTALLED AND AVAILABLE 4. WITH ALL ITS EQUIPMENT AND ACCESSORIES 5. STORED IN WAREHOUSE SECURELY, IN GOOD ENVIRONMENT. Learn More
- TT-4546 SIEMENS STEAM TURBINE TYPE SST-600 – NEW, 22MW, YEAR 2013TT-4546 SIEMENS STEAM TURBINE TYPE SST-600 – NEW, 22MW, YEAR 2013 SIEMENS 60 Hz 22 MW STEAM GAS TURBINE SST-600 COMPOSED OF 12 MW COMPRESSOR AND 10 MW GENERATOR: NEW SIEMENS 60 Hz 12 MW COMPRESSOR STC GV 40-6 NEW SIEMENS 60 Hz, 10 MW 3 GENERATOR ALSO INCLUDED: SPARE PARTS FOR COMP AND TURBINE WORTH ABOUT $120,000 Learn More
- YY-3575 SIEMENS SST-400 STEAM TURBINE, 30MW 50 TO 60Hz, 10500V, 2015, SURPLUS NEW 0 HOURYY-3575 SIEMENS SST-400 STEAM TURBINE, 30MW 50 TO 60Hz, 10500V, 2015, SURPLUS NEW 0 HOUR SIEMENS COMPLETE POWER GENERATION EQUIPMENT, INCLUDING STEAM TURBINE, MOTOR, REDUCER AND SPECIAL ELECTRIC CONTROL BOX, ALL OF WHICH ARE SIEMENS BRANDS. THE STEAM TURBINE MODEL IS SST-400 AND THE MOTOR MODEL IS SGEN5-100A-4P. THE EQUIPMENT WAS PURCHASED IN 2015. Learn More
- M-4835 POWER AND INDUSTRIAL PLANTS FOR SALEREFERENCE NUMBER: M-4835 (1111VEHJXX10) L POWER AND INDUSTRIAL PLANTS FOR SALE QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 230 COMBINED CYCLE GAS TURBINE POWER PLANT SIEMENS V94-2 1988 1 220 COMBINED CYCLE POWER PLANT 50 HZ, FUEL: DUAL FUEL (NATURAL GAS OR HFO/DIESEL) GE FRAME 6B CCPP 1992, RUNNING HOURS: 135 000, PREUSED 1 180 GAS TURBINE 125 MW, STEAM TURBINE 55 MW, 50 HZ, FUEL LFO AND NG GE FRAME 9E CCPP 2005, RUNNING HOURS: 2000 2 128 COMPLETE POWER PLANTS, 15 KV, FUEL: NATURAL GAS AND LIGHT OIL GE FRAME PG9171E NEW 2 127 GAS TURBINE PACKAGES FIAT AVIO MODEL TG 50 – D5 1998,DISMANTLED, OVERHAULED, UPGRADED FROM SIEMENS AND DISMANTLED 2 125 COMPLETE PLANT, 2 UNITS ABB GAS TURBINE PACKAGES, FUEL: DUAL FUEL, 50 HZ ABB, 50WT 18H-66 1995, JUST OVERHAULED, WARRANTY POSSIBLE 1 93 COMBINED CYCLE POWER PLANT. FUEL : NATURAL GAS GE FRAME 6FA 1997 MAJOR INSPECTION IN 2009 1 73 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. SIEMENS WESTINGHOUSE AND MITSUBISHI. 1999, RUNNING HOURS 97 000 1 70 COMBINED CYCLE POWER PLANT THOMASSEN/ABB 2009, RUNNING HOURS UNDER 90 000 CONDITION GOOD, 2009 OVERHAULED 5 66 GAS TURBINE PACKAGES, 50 OR 60 HZ ROLLS ROYCE, TRENT 60 2014, RUNNING HOURS ZERO 3 49 GAS TURBINE POWER PLANT, 50 HZ 3 UNITS GE LM 6000 PC 2004, RUNNING HOURS 6000 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 46 COMPLETE PLANT, INCLUDES 5 GAS TURBINE PACKAGES, INCLUDING 1 STEAM TURBINE, BOILER AND AUXILIARIES. FUEL: NATURAL GAS AND NAPHTA. 50 HZ. SIEMENS TYPHOON AND ALSTOM. 2000, LOW HOURS, STILL IN OPERATION 1 42 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. GE LM 6000PA 1997, LAST HOT END OVERHAUL WAS AT 86.080 HOURS IN AUG 2010 1 41 GAS TURBINE PACKAGE WITH HRSG, 50HZ FUEL: NATURAL GAS/FUEL OIL THOMASSEN PG-6541 1995, LAST OVERHAUL AT 118350 1 40 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS AND LIGHT OIL. 50 HZ. GE FRAME 6 B, DRY LOW NOX 1992, RECENTLY OVERHAULED, STILL GOOD FOR MORE THAN 24.000 RUNNING HOURS. READY TO SHIP. 5 37 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ SGT 750 SIEMENS NEW, ZERO HOURS 1 31,2 GAS TURBINE PACKAGES, 31,2 MW , 50/60 HZ, SGT 700 NEW, ZERO HOURS 5 31 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ GE TM2500 NEW 1 29,65 GAS TURBINE GENERATOR, 50 HZ, 11 KV SGT 700 2011, RUNNING HOURS ZERO (NEW) 1 27 COMBINED CYLE POWER PLANT, 27 MW, NATURAL GAS GE RLM 2500 PE AND ALSTOM STEAM TURBINE GAS TURBINE 1994, STEAM TURBINE 1996 1 26,59 GAS TURBINE, FUEL: GAS FRAME 5, PG-5371 PA 1995, RUNNING HOURS 174,104 4 24,6 CORE ENGINE FUEL: NATURAL GAS, 50 HZ SIEMENS SGT 600 (EX ABB GT 10B) 1994-1997, ZERO HOUR OVERHAULED 1 16 GAS TURBINE PACKAGE DUEAL FUEL ROLLS ROYCE AVON 1534-102L ZERO HOUR OVERHAULED IN 2008 1 14,25 NATURAL GAS ENGINE SOLAR TITAN 130 SOLONOX, 50 HZ TURBOMACH T19501 2007, ZERO RUNNING HOURS, AS NEW 3 12,9 GAS TURBINES SIEMENS, 60 HZ SIEMENS SGT 400 2014, NEW NEVER USED 1 11,86 GAS TURBINE, 60 HZ SOLAR MARS 100 15000 SOLONOX 1996, RUNNING HOURS 34 000 SINCE LAST OVERHAUL 2 9,2 CHP PLANT ELECTRIC, NATURAL GAS AND LIGHT DIESEL&BOTH SOLAR CENTAUR 50 T5701 2005 AND 2008, RUNNING HOURS 26 000 AND 2 500 1 8,8 COMBINED CYCLE GAS TURBINE POWER PLANT. 60 HZ. SOLAR MARS 90. 1989, LAST MAJOR OVERHAUL IN 2004, ONLY 1225 RUNNING HOURS 1 7,5 NATURAL GAS ENGINE SOLAR TAURUS T70, 50 HZ TURBOMACH SOLONOX + WHRB 2007, ZERO RUNNING HOURS AS NEW 1 5,5 GAS TURBINE, 50 HZ, NATURAL GAS SGT 200 1989, RUNNING HOURS 126 340 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 5,2 DUAL NATURAL GAS AND OIL ENGINE TAURUS 60, 50 HZ SOLAR TAURUS 60, SOLONOX T7301 1998, RUNNING HOURS17 700 1 1,4 GAS TURBINE PACKAGE INCL. HRSG, 50 HZ KAWASAKI KA 1334 1995, RUNNING HOURS AFTER MAJOR OVERHAUL 4000 Learn More