Search results for: 'steam e'
- Related search terms
- steam+mach
- steam+2
- steam machin
- steam 2'
- STEAM A
-
F-1227 EPS BLOCK (6000×1200×600mm) PRODUCTIONREFERENCE NUMBER: F-1227 EPS BLOCK (6000×1200×600mm) PRODUCTION LINE (NEW) CONSIST OF: 1. EPS BATCH PRE-EXPANDER MODEL SJ1400 2. EPS AUTO AIR-COOLING BLOCK MOLDING MACHINE SB6000 3. EPS CUTTING MACHINE PSC6000 4. CNC CUTTING MACHINE SCS3000 5. AUTO SHAPE MOLDING MACHINE WITH VACUUM SZ-172 6. AUXILIARY EQUIPMENT QUANTITY AVAILABLE: 1 Learn More -
TT-6947 SIEMENS STG STEAM TURBINE GENERATOR SET, 17.5 MW, YEAR 2005TT-6947 SIEMENS STG STEAM TURBINE GENERATOR SET, 17.5 MW, YEAR 2005 1. SIEMENS STG STEAM TURBINE GENERATOR SET 2. EXTRACTION-CONDENSING 3. CONDITION: USED 4. YEAR: 2005 5. BRAND: SIEMENS QUANTITY: 1 Learn More -
TT-1742 SIEMENS SGT200 CO-GENERATION PLANT, 6.75MW, 6.3KV, 50Hz, NATURAL GASTT-1742 SIEMENS SGT200 CO-GENERATION PLANT, 6.75MW, 6.3KV, 50Hz, NATURAL GAS SIEMENS SGT200 CO-GENERATION PLANT QDR 70 GAS TURBINE (SIEMENS) ZNGT BOILERS 6.75MW 6.3KV 50Hz NATURAL GAS QUANTITY: 2 Learn More -
TT-7835 GE LM2500G4, 1ST, DLE, YEAR 2018, 50HzTT-7835 GE LM2500G4, 1ST, DLE, YEAR 2018, 50Hz 1. GE LM2500G4, 1ST, DLE 2. YEAR: 2018 3. VOLTAGE: 10.5KV 4. DUAL FREQUENCY QUANTITY: 1 Learn More -
F-1228 EPS MOLDING PRODUCTION LINE FOR BOX/CONTAINER/TRAY WITH THREE MOLDSREFERENCE NUMBER: F-1228 EPS MOLDING PRODUCTION LINE FOR BOX/CONTAINER/TRAY WITH THREE MOLDS (NEW) CONSIST OF: 1. EPS BATCH PRE-EXPANDER TYPE SJ1100 2. AUTOMATIC SHAPE MOLDING MACHINE WITH VACUUM SZ172 3. EPS MOULD FOR SZ172 MOLDING MACHINE 4. AUXILIARY EQUIPMENT QUANTITY AVAILABLE: 1 Learn More -
J-4564 5 KILO SAMPLE SOFT FLOW MACHINEJ-4564 5 KILO SAMPLE SOFT FLOW MACHINE CAPACITY 5 TO 10 KILO MATERIAL CONSTRUCTION [HTHP-VESSEL] 316 L 5 mm THICKNESS PUMP SS 316 – MOTOR HP 3 HP – 1500 RPM DIAMETER OF VESSEL 1150 mm TOTAL LENTGH 2200 mm TOTAL WIDTH 3900 mm MAXIMUM WORKING HIGH TEMP. 135° C MAXIMUM WORKING PRESSURE 3 KG/ cm2 TUBE 1 TUBE SIZE DIAMETER 200 mm NOZZLE SIZE [OVERFLOW FIX ] DIAMETER 190 mm X 168 mm INSIDE WINCH (HP) 1 HP X 1 FOR FULLY AUTO COLOR TANK INJECTION PUMP 1 HP/3000 RPM UNLOADING WINCH 1 HP /200RPM GEAR BOX COLOR TANK (LITERS) 20 LITERS X 2 PIECES FILL (AUTO) DIAMETER 1.5” X 2 DRAIN [ AUTO] DIAMETER 1.5 ” X 2 OVER FLOW [AUTO] DIAMETER 1.5” X 1 HEAT [ AUTO] DIAMETER 1” COOL [ AUTO] DIAMETER 1” LIQUOR RATIO 1: 5 TO 1 : 7 [ DEPEND ON FABRIC] QUANTITY: 1 Learn More -
TT-8106 GE LM2500G4, DLE, 2ND, 33.372MW, YEAR 2018, 50HzTT-8106 GE LM2500G4, DLE, 2ND, 33.372MW, YEAR 2018, 50Hz 1. GE LM2500G4, DLE 2. 2ND 3. YEAR: 2018 4. VOLTAGE: 10.5KV QUANTITY: 1 Learn More -
TT-2791 SIEMENS SST-400 STEAM TURBINE, 30MW, 10500V, 50HzTT-2791 SIEMENS SST-400 STEAM TURBINE, 30MW, 10500V, 50Hz QUANTITY: 1 Learn More -
TT-1237 MCS/POZZI/ANGLADA/BRAZZOLI/OMEZ/MASTER/DETTIN TERRY TOWEL FABRIC & CONE DYEING AND FINISHING, YEAR 1970 TO 2011TT-1237 MCS/POZZI/ANGLADA/BRAZZOLI/OMEZ/MASTER/DETTIN TERRY TOWEL FABRIC & CONE DYEING AND FINISHING, YEAR 1970 TO 2011 ITEM 001 MCS PANDORA OVERFLOW FOR DYEING TERRY FABRIC QUANTITY: 2 ITEM 002 MCS PANDORA OVERFLOW FOR DYEING TERRY FABRIC QUANTITY: 2 ITEM 003 POZZI HIDROEXTRACTOR X TERRY FABRIC QUANTITY: 1 ITEM 004 ANGLADA TUMBLER DOUBLE FOR TERRY TOWEL. QUANTITY: 1 ITEM 005 BRAZZOLI OVERFLOW X SAMPLE 1 TUBE QUANTITY: 1 ITEM 006 OMEZ MACHINE FOR IMPREGNATION TERRY QUANTITY: 1 ITEM 007 POZZI KITCHEN COLOR QUANTITY: 1 ITEM 008 MASTER BM 150 QUANTITY: 1 ITEM 009 MASTER BM 300, KG 490 QUANTITY: 1 ITEM 010 MASTER BM 600 QUANTITY: 1 ITEM 011 DETTIN IDROEXACTOR QUANTITY: 1 ITEM 012 CONE BENDER QUANTITY: 1 STATUS: STILL RUNNING. DELIVERY: AFTER 30 DAYS AFTER ORDER CONFIRMATION DATE Learn More -
YY-2535 GE LM6000PA 42+7MW CHP PLANTYY-2535 GE LM6000PA 42+7MW CHP PLANT THE EXTENSIVE LIST OF ACCOMPANYING EQUIPMENT INCLUDES: 1. GE LM6000PA GAS TURBINE EQUIPPED WITH WATER INJECTION, PAIRED WITH A BRUSH ALTERNATOR WITH 42 MW OUTPUT CAPACITY. THIS GAS TURBINE SUPPORTS NATURAL GAS OR DISTILLATE FUEL. 2. GT MK V CONTROL UNIT WITH AUXILIARY SYSTEMS. 3. SIEMENS BACK PRESSURE STEAM TURBINE WITH 7MW OUTPUT CAPACITY. 4. NOOTER ERIKSON HRSG CAPABLE OF SUPPLEMENTARY FIRING WITH NATURAL GAS OR DISTILLATE FUEL. 5. DUAL BELLIS AND MORCOM THREE-STAGE RECIPROCATING NATURAL GAS COMPRESSORS. 6. WATER TREATMENT PLANT COMPOSED OF TWIN BED RESIN EXCHANGE UNITS AND MIXED BED UNITS. 7. MASSIVE STORAGE TANKS FOR DISTILLATE OIL AND HEAVY FUEL OIL, COMPLETE WITH NECESSARY PIPING AND PUMPS. 8. TWO 11/132 KV TRANSFORMERS RATED AT 40 MVA EACH. 9. STANDBY DIESEL GENERATOR FOR BACKUP POWER. 10. SERCK DISTRIBUTED CONTROL SYSTEM (DCS) FOR INTEGRATED CONTROL AND MONITORING. 11. THREE CONTROL AND GENERAL SERVICE AIR COMPRESSORS. 12. AN EXTENSIVE FIRE DETECTION AND SUPPRESSION SYSTEM, SECURITY CAMERAS, AND GAS DETECTION SYSTEM FOR SAFETY AND SECURITY. 13. A CBISS CONTINUOUS EMISSIONS MONITORING SYSTEM (CEMS) TO ENSURE ADHERENCE TO ENVIRONMENTAL STANDARDS. ALL THE NECESSARY CABLING, TRANSFORMERS, SWITCHGEAR, AND PRESSURE-REDUCING STATIONS ASSOCIATED WITH THE ABOVE-MENTIONED PLANT ARE INCLUDED. A BONUS OF UNIQUE SPARE PARTS, EXTENSIVE MANUALS, RECORDS, AND DRAWINGS ARE ALSO PART OF THE PACKAGE, ENSURING SMOOTH OPERATION AND MAINTENANCE. A GE LM6000PA CHP PLANT REPRESENTS A ROBUST, EFFICIENT SOLUTION TO YOUR POWER AND HEATING NEEDS, OFFERING THE RELIABILITY AND FLEXIBILITY NEEDED FOR YOUR OPERATIONS. QUANTITY: 1 UNIT AVAILABLE FOR PURCHASE Learn More