YY-2535 GE LM6000PA 42+7MW CHP PLANT
THE EXTENSIVE LIST OF ACCOMPANYING EQUIPMENT INCLUDES:
1. GE LM6000PA GAS TURBINE EQUIPPED WITH WATER INJECTION, PAIRED WITH A BRUSH ALTERNATOR WITH 42 MW OUTPUT CAPACITY. THIS GAS TURBINE SUPPORTS NATURAL GAS OR DISTILLATE FUEL.
2. GT MK V CONTROL UNIT WITH AUXILIARY SYSTEMS.
3. SIEMENS BACK PRESSURE STEAM TURBINE WITH 7MW OUTPUT CAPACITY.
4. NOOTER ERIKSON HRSG CAPABLE OF SUPPLEMENTARY FIRING WITH NATURAL GAS OR DISTILLATE FUEL.
5. DUAL BELLIS AND MORCOM THREE-STAGE RECIPROCATING NATURAL GAS COMPRESSORS.
6. WATER TREATMENT PLANT COMPOSED OF TWIN BED RESIN EXCHANGE UNITS AND MIXED BED UNITS.
7. MASSIVE STORAGE TANKS FOR DISTILLATE OIL AND HEAVY FUEL OIL, COMPLETE WITH NECESSARY PIPING AND PUMPS.
8. TWO 11/132 KV TRANSFORMERS RATED AT 40 MVA EACH.
9. STANDBY DIESEL GENERATOR FOR BACKUP POWER.
10. SERCK DISTRIBUTED CONTROL SYSTEM (DCS) FOR INTEGRATED CONTROL AND MONITORING.
11. THREE CONTROL AND GENERAL SERVICE AIR COMPRESSORS.
12. AN EXTENSIVE FIRE DETECTION AND SUPPRESSION SYSTEM, SECURITY CAMERAS, AND GAS DETECTION SYSTEM FOR SAFETY AND SECURITY.
13. A CBISS CONTINUOUS EMISSIONS MONITORING SYSTEM (CEMS) TO ENSURE ADHERENCE TO ENVIRONMENTAL STANDARDS.
ALL THE NECESSARY CABLING, TRANSFORMERS, SWITCHGEAR, AND PRESSURE-REDUCING STATIONS ASSOCIATED WITH THE ABOVE-MENTIONED PLANT ARE INCLUDED. A BONUS OF UNIQUE SPARE PARTS, EXTENSIVE MANUALS, RECORDS, AND DRAWINGS ARE ALSO PART OF THE PACKAGE, ENSURING SMOOTH OPERATION AND MAINTENANCE.
A GE LM6000PA CHP PLANT REPRESENTS A ROBUST, EFFICIENT SOLUTION TO YOUR POWER AND HEATING NEEDS, OFFERING THE RELIABILITY AND FLEXIBILITY NEEDED FOR YOUR OPERATIONS.
QUANTITY: 1 UNIT AVAILABLE FOR PURCHASE
Learn More
YY-2241 124 MW GE FRAME 9E CHP COMPLETE POWER PLANT, 50 Hz
GAS TURBINE MODEL / TYPE: GENERAL ELECTRIC -GE FRAME 9E - PG9171(E) 50Hz;
SINGLE TURBINE
DESIGN OUTPUT: 124 MW;
DESIGN HEAT RATE: NET HEAT RATE AT GENERATOR TERMINALS KJ/KWH 10 716 ±1%;
DLN SYSTEM: DLN1;
COMMISSIONING DATE: 2009;
SHUT-DOWN DATE: NOVEMBER 2017. WELL PRESERVED TO DATE;
TOTAL FIRED TIME: 56500;
PLANNED MAINTENANCE DATE: 2012 HOT GAS PATH INSPECTION, 2015 MAJOR INSPECTION;
RATED OUTPUT / TERMINAL VOLTAGE: 150 MVA – 15 KV;
TRANSFORMERS: STEP UP TRANSFORMER: 153 MVA.
TURBINE EFFICIENCY: NET HEAT RATE AT GENERATOR TERMINAL IS 10,760 kJ/kWh
QUANTITY: 1
Learn More
TT-8656 SIEMENS SGT5 4000 F GAS TURBINE & GENERATOR – NEW, 54 MW, YEAR 2016, 50/60 Hz
1. NEW AND UNUSED SIEMENS GAS TURBINE & GENERATOR
2. HEAVY DUTY, SINGLE CASING, AXIAL FLOW DESIGN AND DUAL FUEL GAS TURBINE.
3. MODEL: SGT54000F
4. BRAND: SIEMENS AG
5. 54 MW
6. YEAR OF MANUFACTURE: 2016
7. FREQUENCY: 50 Hz
8. FUEL: NATURAL GAS (NG) AND DIESEL OIL (DO)
9. GUARANTEED PERFORMANCE:
10. GROSS POWER OUTPUT [MW]: 298,2 (NG) – 301 (DO).
11. GROSS HEAT RATE [KJ/KWH]: 8979,3 (NG) – 9538,5 (DO).
12. GENERATOR: SGEN51200 A.
13. INCLUDES: BYPASS STACK AND DIVERTER DAMPER.
14. DELIVERY: IMMEDIATELY. BUYER IS RESPONSIBLE FOR LOADING, FREIGHT AND LOGISTICS FROM ACTUAL LOCATION TO FINAL DESTINATION.
15. DETAILED DESCRIPTION: GAS TURBINE (GT)
16. IT WORKS ON 50 Hz BUT COULD BE CONVERTED, WITH ADDITIONAL EQUIPMENT FOR 60 Hz (EXTRA COSTS).
QUANTITY: 1
Learn More
TT-8062 GE MS-5001-PA GENERATOR SET - NEW, 26MW, NATURAL GAS, 60 Hz, YEAR 2014
1. GE NATURAL GAS GENERATOR
2. NEW 26MW
3. IT IS 60 Hz UNIT. NOT ECONOMICAL TO CONVERT TO 50 Hz
4. NEW
5. NEVER INSTALLED Learn More
TT-4162 AMERICAN KUHNE HIGH HEAT EXTRUDER, 2”, 24:1, YEAR 2008
TYPE: EXTRUDERS - SINGLE SCREW
BRAND: AMERICAN KUHNE
MODEL: AK 200 24:1
CONDITION: USED - EXCELLENT
YEAR: 2008
QUANTITY: 1 Learn More