Search results for: 'steam+turb'
- Related search terms
- steam+turb'[0]
- steam+turbin',(;))#-+--
- steam+turbin'
- Steam+Turbine+generat
- Steam+Turbine+ge
- TT-6590 SIEMENS CONDENSING STEAM TURBINE-GENERATOR PACKAGE WITH ACC, 24.9MW, 50Hz, YEAR 2021TT-6590 SIEMENS CONDENSING STEAM TURBINE-GENERATOR PACKAGE WITH ACC, 24.9MW, 50Hz, YEAR 2021 1. BRAND: SIEMENS TURBINES 2. MODEL: SIEMENS SST300 3. CONDITION: NEW 4. CONDITION: UNUSED 5. YEAR OF MANUFACTURE: 2021 6. HOURS: 0 - NEVER INSTALLED. Learn More
- K-6715 ESCHER WYSS BACK PRESSURE STEAM TURBINE YEAR 1964
K-6715 ESCHER WYSS BACK PRESSURE STEAM TURBINE YEAR 1964
MANUFACTURER: ESCHER WYSS
TYPE: 135-200
POWER ELECTRICAL: 3.0 MW
PRESSURE/TEMP.: 60 BAR/400°C
BACK PRESSURE: 11 BAR
YEAR OF MANUFACTURER: 1964
CONDITION: GOOD
VOLTAGE: 11 KV/50 HZ
SCOPE OF SUPPLY:
TURBINE AND GENERATOR,PIPING AND ELECTR. BOXESQUANTITY: 1
Learn More - TT-6554 SIEMENS SST400 CONDENSING STEAM TURBINE-GENERATOR PACKAGE - NEW, 24.5MW, 50Hz, YEAR 2014TT-6554 SIEMENS SST400 CONDENSING STEAM TURBINE-GENERATOR PACKAGE - NEW, 24.5MW, 50Hz, YEAR 2014 1. BRAND: SIEMENS TURBINES 2. MODEL: SIEMENS SST400 3. CONDITION: NEW QUANTITY: 1 Learn More
- YY-3076 NEW SIEMENS 24.5MW CONDENSING STEAM TURBINE - GENERATOR SET, YEAR 2013YY-3076 NEW SIEMENS 24.5MW CONDENSING STEAM TURBINE - GENERATOR SET, YEAR 2013 YEAR OF MANUFACTURE: 2013 CONDITION: NEW, UNUSED OPERATING HOURS: 0 STATUS: INSTALLED Learn More
- YY-2471 5.5 MW, TAURUS T-60 NATURAL GAS TURBINE GENERATOR SET INCLUDING HRSG (STEAM BOILER) AND WHRU (WASTE HEAT RECOVERY), OUTPUT VOLTAGES AVAILABLE 380/415/460/575 (CAN BE 50 OR 60 Hz)YY-2471 5.5 MW, TAURUS T-60 NATURAL GAS TURBINE GENERATOR SET INCLUDING HRSG (STEAM BOILER) AND WHRU (WASTE HEAT RECOVERY), OUTPUT VOLTAGES AVAILABLE 380/415/460/575 (CAN BE 50 OR 60 Hz) QUANTITY: 1 Learn More
- K-2577 BBC CONDENSING AND EXTRACTION STEAM TURBINE POWER PLANT 8.5MW YEAR 1975
K-2577 BBC CONDENSING AND EXTRACTION STEAM TURBINE POWER PLANT 8.5MW YEAR 1975
8.5 MW
40 BAR
390 ˚ C
YEAR 1975QUANTITY: 1
Learn More - K-8157 COAL FIRED POWER PLANT (2 X 50MW)
K-8157 COAL FIRED POWER PLANT (2 X 50MW)
ENERGY BOILERS (CAE)
TURBINE SYSTEMS
STEAM TURBINES (TA) - DSL ARE 50 - 1
-CONDENSING TURBINE WITH TWO ADJUSTABLE OUTLETS, SUCH AS "ACTING" ON A SINGLE LINE OF TREES, DESIGNED TO DRIVE THE AC GENERATOR DIRECT-TYPE TH 60-2
-IS COMPOSED OF TWO BODIES: THE BODY OF HIGH PRESSURE (CIP) AND MEDIUM AND LOW PRESSURE BODY (CMP + CJP)
-HAS TWO ADJUSTABLE OUTLETS (PLUG SOCKETS AND PLUG HEATING) AND FIVE FIXED DOSES REGENERATIVE CIRCUIT FEEDSQUARES OF 600 CARS OVER T/H (WITH BUCKET WHEEL AND ARM LENGTH 12 M) - 4 PCS
-TIP HAMMER CRUSHERS CCA - 160 TO 2 PIECES
- RUBBER BANDS COAL TRANSPORTTHE MAIN EQUIPMENT IS ADDED TO ENSURE PROPER OPERATION FOLLOWING:
- SOLID FUEL STORAGE
- INSTALLATIONS AND INDUSTRIAL WATER SUPPLIES AND WASTEWATER DISCHARGE
- INSTALLATION OF EXHAUST HYDRAULIC SLAG
- WATER TREATMENT STATION
TO USE COAL, WEIGHT 88%, 12% NATURAL GASQUANTITY: 1
Learn More - M-4835 POWER AND INDUSTRIAL PLANTS FOR SALEREFERENCE NUMBER: M-4835 (1111VEHJXX10) L POWER AND INDUSTRIAL PLANTS FOR SALE QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 230 COMBINED CYCLE GAS TURBINE POWER PLANT SIEMENS V94-2 1988 1 220 COMBINED CYCLE POWER PLANT 50 HZ, FUEL: DUAL FUEL (NATURAL GAS OR HFO/DIESEL) GE FRAME 6B CCPP 1992, RUNNING HOURS: 135 000, PREUSED 1 180 GAS TURBINE 125 MW, STEAM TURBINE 55 MW, 50 HZ, FUEL LFO AND NG GE FRAME 9E CCPP 2005, RUNNING HOURS: 2000 2 128 COMPLETE POWER PLANTS, 15 KV, FUEL: NATURAL GAS AND LIGHT OIL GE FRAME PG9171E NEW 2 127 GAS TURBINE PACKAGES FIAT AVIO MODEL TG 50 – D5 1998,DISMANTLED, OVERHAULED, UPGRADED FROM SIEMENS AND DISMANTLED 2 125 COMPLETE PLANT, 2 UNITS ABB GAS TURBINE PACKAGES, FUEL: DUAL FUEL, 50 HZ ABB, 50WT 18H-66 1995, JUST OVERHAULED, WARRANTY POSSIBLE 1 93 COMBINED CYCLE POWER PLANT. FUEL : NATURAL GAS GE FRAME 6FA 1997 MAJOR INSPECTION IN 2009 1 73 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. SIEMENS WESTINGHOUSE AND MITSUBISHI. 1999, RUNNING HOURS 97 000 1 70 COMBINED CYCLE POWER PLANT THOMASSEN/ABB 2009, RUNNING HOURS UNDER 90 000 CONDITION GOOD, 2009 OVERHAULED 5 66 GAS TURBINE PACKAGES, 50 OR 60 HZ ROLLS ROYCE, TRENT 60 2014, RUNNING HOURS ZERO 3 49 GAS TURBINE POWER PLANT, 50 HZ 3 UNITS GE LM 6000 PC 2004, RUNNING HOURS 6000 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 46 COMPLETE PLANT, INCLUDES 5 GAS TURBINE PACKAGES, INCLUDING 1 STEAM TURBINE, BOILER AND AUXILIARIES. FUEL: NATURAL GAS AND NAPHTA. 50 HZ. SIEMENS TYPHOON AND ALSTOM. 2000, LOW HOURS, STILL IN OPERATION 1 42 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. GE LM 6000PA 1997, LAST HOT END OVERHAUL WAS AT 86.080 HOURS IN AUG 2010 1 41 GAS TURBINE PACKAGE WITH HRSG, 50HZ FUEL: NATURAL GAS/FUEL OIL THOMASSEN PG-6541 1995, LAST OVERHAUL AT 118350 1 40 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS AND LIGHT OIL. 50 HZ. GE FRAME 6 B, DRY LOW NOX 1992, RECENTLY OVERHAULED, STILL GOOD FOR MORE THAN 24.000 RUNNING HOURS. READY TO SHIP. 5 37 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ SGT 750 SIEMENS NEW, ZERO HOURS 1 31,2 GAS TURBINE PACKAGES, 31,2 MW , 50/60 HZ, SGT 700 NEW, ZERO HOURS 5 31 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ GE TM2500 NEW 1 29,65 GAS TURBINE GENERATOR, 50 HZ, 11 KV SGT 700 2011, RUNNING HOURS ZERO (NEW) 1 27 COMBINED CYLE POWER PLANT, 27 MW, NATURAL GAS GE RLM 2500 PE AND ALSTOM STEAM TURBINE GAS TURBINE 1994, STEAM TURBINE 1996 1 26,59 GAS TURBINE, FUEL: GAS FRAME 5, PG-5371 PA 1995, RUNNING HOURS 174,104 4 24,6 CORE ENGINE FUEL: NATURAL GAS, 50 HZ SIEMENS SGT 600 (EX ABB GT 10B) 1994-1997, ZERO HOUR OVERHAULED 1 16 GAS TURBINE PACKAGE DUEAL FUEL ROLLS ROYCE AVON 1534-102L ZERO HOUR OVERHAULED IN 2008 1 14,25 NATURAL GAS ENGINE SOLAR TITAN 130 SOLONOX, 50 HZ TURBOMACH T19501 2007, ZERO RUNNING HOURS, AS NEW 3 12,9 GAS TURBINES SIEMENS, 60 HZ SIEMENS SGT 400 2014, NEW NEVER USED 1 11,86 GAS TURBINE, 60 HZ SOLAR MARS 100 15000 SOLONOX 1996, RUNNING HOURS 34 000 SINCE LAST OVERHAUL 2 9,2 CHP PLANT ELECTRIC, NATURAL GAS AND LIGHT DIESEL&BOTH SOLAR CENTAUR 50 T5701 2005 AND 2008, RUNNING HOURS 26 000 AND 2 500 1 8,8 COMBINED CYCLE GAS TURBINE POWER PLANT. 60 HZ. SOLAR MARS 90. 1989, LAST MAJOR OVERHAUL IN 2004, ONLY 1225 RUNNING HOURS 1 7,5 NATURAL GAS ENGINE SOLAR TAURUS T70, 50 HZ TURBOMACH SOLONOX + WHRB 2007, ZERO RUNNING HOURS AS NEW 1 5,5 GAS TURBINE, 50 HZ, NATURAL GAS SGT 200 1989, RUNNING HOURS 126 340 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 5,2 DUAL NATURAL GAS AND OIL ENGINE TAURUS 60, 50 HZ SOLAR TAURUS 60, SOLONOX T7301 1998, RUNNING HOURS17 700 1 1,4 GAS TURBINE PACKAGE INCL. HRSG, 50 HZ KAWASAKI KA 1334 1995, RUNNING HOURS AFTER MAJOR OVERHAUL 4000 Learn More
- TT-7835 GE LM2500G4, 1ST, DLE, YEAR 2018, 50HzTT-7835 GE LM2500G4, 1ST, DLE, YEAR 2018, 50Hz 1. GE LM2500G4, 1ST, DLE 2. YEAR: 2018 3. VOLTAGE: 10.5KV 4. DUAL FREQUENCY QUANTITY: 1 Learn More
- YY-3556 4 X 60 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE POWER PLANTYY-3556 4 X 60 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE POWER PLANT HISTORY: THE POWER PLANT CONSISTS OF X 50 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE, ALL OF YEAR: 2011, 7000 HRS SINCE NEW EACH, 3000 RPM, 50 Hz, X 13 MW SIEMENS SST 300 STEAM TURBINE WITH 5000 HOURS EACH. PLANT WAS COMMISSIONED AND PUT INTO OPERATION IN 2012. QUNATITY: 1 Learn More