- TT-5676 GE ALSTOM FRAME 6B CHP, 50 MW, NATURAL GAS, 50Hz, YEAR 2000TT-5676 GE ALSTOM FRAME 6B CHP, 50 MW, NATURAL GAS, 50Hz, YEAR 2000 GE ALSTOM FRAME 6B CHP 50 MW NATURAL GAS, 50Hz, 11KV YEAR OF COMMISSION: 2000 Learn More
- K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006
K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006
COAL FIRED STEAM TURBINE POWER PLANT
300MW
COAL OIL GAS
BIOMASS FIRED
OUTPUT: 600 MW
180 BAR
540°C
MANUFCATURER/TYPE: BBC-ABB
YEAR: 2006
ONLY 13,300 AND 45,000 RUNNING HOURS AFTER MAJOR OVERHAULALTERNATOR ACEC TC 1498
COOLING: HYDROGEN 22 KV 3000 TR 1550 KVA
MAIN TRAFO: WESTINGHOUSE 375 MVA 156/22 KV
COUPLE TRAFO: ALSTHOM 20 MVA 22/6.4 KV
START TRAFO: ALSTHOM 20 MVA 71.5/6.4 KVFUELPUMPS: ID:3 / HD:3 LD:2881/HD:2223
16 BURNERS TANGENIALGASBURNERS: TANGENIAL 16 PCS 5000 NM3
COAL GRINDING MILLS:
(4) LOESCHE LM 19.20D
25 T/HR(2) LOESCHE LM 20.20D
35 T/HRBIOMASS POWER GENERATION BY CFB (CIRCULATING FLUIDIZED BED) BOILER 20 MWe FIRED BY WOOD DERIVED WASTES CUT INTO CHIPS. COMPLETE SAWDUST INSTALLATION.
UNIT 1
172,000 HOURS, OVERHAULED IN 2006
NEW ROTOR (HD, MD, LD)
ONLY 13,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN APRIL 2011 ONLY 408 HOURS UNTIL NOW!UNIT 2
265,000 HOURS, OVERHAULED IN 2006 (HD, MD, LD)
45,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN NOVEMBER 2011 ONLY 13,300 HOURS UNTIL NOW!
189 KG/CM2, 540˚C, 3000 T/MINPLANT ORIGINALLY FROM THW 1970’S BUT RENEWED IN 2006
STILL INSTALLED
IMMEDIATE DISMANTLING POSSIBLE
BOILER INTAKE CAPACITY: 3500 T/H
NEW PLCQUANTITY: 2
Learn More - TT-5849 SIEMENS SGT-400 UNIT, 2955 HOURS, 50 Hz, YEAR 2016TT-5849 SIEMENS SGT-400 UNIT, 2955 HOURS, 50 Hz, YEAR 2016 SIEMENS SGT-400 UNIT AND THE INSPECTION SITUATION IS AS FOLLOWS: Learn More
- TT-5669 GE 9FA CCPP, 810 MW, NATURAL GAS, 50Hz, YEAR 2015TT-5669 GE 9FA CCPP, 810 MW, NATURAL GAS, 50Hz, YEAR 2015 GE 9FA CCPP 810 MW NATURAL GAS, 50Hz YEAR OF COMMISSION: 2015 Learn More
- YY-3076 NEW SIEMENS 24.5MW CONDENSING STEAM TURBINE - GENERATOR SET, YEAR 2013YY-3076 NEW SIEMENS 24.5MW CONDENSING STEAM TURBINE - GENERATOR SET, YEAR 2013 YEAR OF MANUFACTURE: 2013 CONDITION: NEW, UNUSED OPERATING HOURS: 0 STATUS: INSTALLED Learn More
- TT-4046 GENERAL ELECTRIC 7E.03 NATURAL GAS GENERATOR PACKAGE, 86.5 MW, YEAR 2014TT-4046 GENERAL ELECTRIC 7E.03 NATURAL GAS GENERATOR PACKAGE, 86.5 MW, YEAR 2014 GENERAL ELECTRIC 7E.03 NATURAL GAS GENERATOR PACKAGE YEAR: 2014 HOUSED: YES, IN A AMBIENT CONTROLLED WAREHOUSE IN TWO LOCATIONS WHAT DOESN’T HAVE TO BE INDOORS, IS OUTSIDE ON AN ENCLOSED FIELD, 2.5 HOURS AWAY FROM THE WAREHOUSES. SKIDDED: NO PASC CONDITION RATING: A CONDITION DETAILS: NEVER USED UNITS AVAILABLE: 1 CONNECTION STATUS: DISCONNECTED WARRANTY: NO WARRANTY DETAILS: EXP DEC 2018 Learn More
- TT-2077 GE FRAME 7EA 86.5MW POWER GENERATION SET – NEW, 60 Hz, YEAR 2014TT-2077 GE FRAME 7EA 86.5MW POWER GENERATION SET – NEW, 60 Hz, YEAR 2014 CONDITION: NEW NEVER USED MANUFACTURED: GENERAL ELECTRIC YEAR 2014 AVAILABILITY: DISCONNECTED / IMMEDIATE Learn More
- A-2611 ULTRAVIOLET AGING TESTING CHAMBER BOX TYPEA-2611 ULTRAVIOLET AGING TESTING CHAMBER BOX TYPE FLUORESCENT UV LAMP IS IMPORTED FOR THIS ACCELERATED AGING TEST CHAMBER. CAN SIMULATE HARM BY SUNLIGHT, RAINWATER AND DEW. UV WEATHER RESISTANCE CHAMBER USE FLUORESCENT UV LAMP TO SIMULATES THE EFFECT OF SUNLIGHT, CONDENSATION MOISTURE IS USED TO SIMULATE DEW. THE TESTED MATERIAL IS PLACED IN A LOOP PROGRAM THAT ALTERNATES LIGHT AND MOISTURE AT A CERTAIN TEMPERATURE. THE MATERIAL WAS TESTED FOR ACCELERATED WEATHERABILITY. UV CHAMBER CAN RE-CREATE HAZARDS THAT OCCUR OUTDOORS FOR MONTHS OR YEARS.THE TYPES OF HAZARDS INCLUDE: DISCOLORATION, CHALKINESS, POWDER LIGHT, CRACKING, TURBIDITY, BUBBLES, BRITTLE, STRENGTH, DECAY, OXIDATION, ETC. THIS MACHINE INCLUDES SPRAY DEVICE. Learn More