Search results for: 'steam g'
- TT-2791 SIEMENS SST-400 STEAM TURBINE, 30MW, 10500V, 50HzTT-2791 SIEMENS SST-400 STEAM TURBINE, 30MW, 10500V, 50Hz QUANTITY: 1 Learn More
- M-4835 POWER AND INDUSTRIAL PLANTS FOR SALEREFERENCE NUMBER: M-4835 (1111VEHJXX10) L POWER AND INDUSTRIAL PLANTS FOR SALE QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 230 COMBINED CYCLE GAS TURBINE POWER PLANT SIEMENS V94-2 1988 1 220 COMBINED CYCLE POWER PLANT 50 HZ, FUEL: DUAL FUEL (NATURAL GAS OR HFO/DIESEL) GE FRAME 6B CCPP 1992, RUNNING HOURS: 135 000, PREUSED 1 180 GAS TURBINE 125 MW, STEAM TURBINE 55 MW, 50 HZ, FUEL LFO AND NG GE FRAME 9E CCPP 2005, RUNNING HOURS: 2000 2 128 COMPLETE POWER PLANTS, 15 KV, FUEL: NATURAL GAS AND LIGHT OIL GE FRAME PG9171E NEW 2 127 GAS TURBINE PACKAGES FIAT AVIO MODEL TG 50 – D5 1998,DISMANTLED, OVERHAULED, UPGRADED FROM SIEMENS AND DISMANTLED 2 125 COMPLETE PLANT, 2 UNITS ABB GAS TURBINE PACKAGES, FUEL: DUAL FUEL, 50 HZ ABB, 50WT 18H-66 1995, JUST OVERHAULED, WARRANTY POSSIBLE 1 93 COMBINED CYCLE POWER PLANT. FUEL : NATURAL GAS GE FRAME 6FA 1997 MAJOR INSPECTION IN 2009 1 73 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. SIEMENS WESTINGHOUSE AND MITSUBISHI. 1999, RUNNING HOURS 97 000 1 70 COMBINED CYCLE POWER PLANT THOMASSEN/ABB 2009, RUNNING HOURS UNDER 90 000 CONDITION GOOD, 2009 OVERHAULED 5 66 GAS TURBINE PACKAGES, 50 OR 60 HZ ROLLS ROYCE, TRENT 60 2014, RUNNING HOURS ZERO 3 49 GAS TURBINE POWER PLANT, 50 HZ 3 UNITS GE LM 6000 PC 2004, RUNNING HOURS 6000 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 46 COMPLETE PLANT, INCLUDES 5 GAS TURBINE PACKAGES, INCLUDING 1 STEAM TURBINE, BOILER AND AUXILIARIES. FUEL: NATURAL GAS AND NAPHTA. 50 HZ. SIEMENS TYPHOON AND ALSTOM. 2000, LOW HOURS, STILL IN OPERATION 1 42 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. GE LM 6000PA 1997, LAST HOT END OVERHAUL WAS AT 86.080 HOURS IN AUG 2010 1 41 GAS TURBINE PACKAGE WITH HRSG, 50HZ FUEL: NATURAL GAS/FUEL OIL THOMASSEN PG-6541 1995, LAST OVERHAUL AT 118350 1 40 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS AND LIGHT OIL. 50 HZ. GE FRAME 6 B, DRY LOW NOX 1992, RECENTLY OVERHAULED, STILL GOOD FOR MORE THAN 24.000 RUNNING HOURS. READY TO SHIP. 5 37 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ SGT 750 SIEMENS NEW, ZERO HOURS 1 31,2 GAS TURBINE PACKAGES, 31,2 MW , 50/60 HZ, SGT 700 NEW, ZERO HOURS 5 31 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ GE TM2500 NEW 1 29,65 GAS TURBINE GENERATOR, 50 HZ, 11 KV SGT 700 2011, RUNNING HOURS ZERO (NEW) 1 27 COMBINED CYLE POWER PLANT, 27 MW, NATURAL GAS GE RLM 2500 PE AND ALSTOM STEAM TURBINE GAS TURBINE 1994, STEAM TURBINE 1996 1 26,59 GAS TURBINE, FUEL: GAS FRAME 5, PG-5371 PA 1995, RUNNING HOURS 174,104 4 24,6 CORE ENGINE FUEL: NATURAL GAS, 50 HZ SIEMENS SGT 600 (EX ABB GT 10B) 1994-1997, ZERO HOUR OVERHAULED 1 16 GAS TURBINE PACKAGE DUEAL FUEL ROLLS ROYCE AVON 1534-102L ZERO HOUR OVERHAULED IN 2008 1 14,25 NATURAL GAS ENGINE SOLAR TITAN 130 SOLONOX, 50 HZ TURBOMACH T19501 2007, ZERO RUNNING HOURS, AS NEW 3 12,9 GAS TURBINES SIEMENS, 60 HZ SIEMENS SGT 400 2014, NEW NEVER USED 1 11,86 GAS TURBINE, 60 HZ SOLAR MARS 100 15000 SOLONOX 1996, RUNNING HOURS 34 000 SINCE LAST OVERHAUL 2 9,2 CHP PLANT ELECTRIC, NATURAL GAS AND LIGHT DIESEL&BOTH SOLAR CENTAUR 50 T5701 2005 AND 2008, RUNNING HOURS 26 000 AND 2 500 1 8,8 COMBINED CYCLE GAS TURBINE POWER PLANT. 60 HZ. SOLAR MARS 90. 1989, LAST MAJOR OVERHAUL IN 2004, ONLY 1225 RUNNING HOURS 1 7,5 NATURAL GAS ENGINE SOLAR TAURUS T70, 50 HZ TURBOMACH SOLONOX + WHRB 2007, ZERO RUNNING HOURS AS NEW 1 5,5 GAS TURBINE, 50 HZ, NATURAL GAS SGT 200 1989, RUNNING HOURS 126 340 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 5,2 DUAL NATURAL GAS AND OIL ENGINE TAURUS 60, 50 HZ SOLAR TAURUS 60, SOLONOX T7301 1998, RUNNING HOURS17 700 1 1,4 GAS TURBINE PACKAGE INCL. HRSG, 50 HZ KAWASAKI KA 1334 1995, RUNNING HOURS AFTER MAJOR OVERHAUL 4000 Learn More
- TT-1237 MCS/POZZI/ANGLADA/BRAZZOLI/OMEZ/MASTER/DETTIN TERRY TOWEL FABRIC & CONE DYEING AND FINISHING, YEAR 1970 TO 2011TT-1237 MCS/POZZI/ANGLADA/BRAZZOLI/OMEZ/MASTER/DETTIN TERRY TOWEL FABRIC & CONE DYEING AND FINISHING, YEAR 1970 TO 2011 ITEM 001 MCS PANDORA OVERFLOW FOR DYEING TERRY FABRIC QUANTITY: 2 ITEM 002 MCS PANDORA OVERFLOW FOR DYEING TERRY FABRIC QUANTITY: 2 ITEM 003 POZZI HIDROEXTRACTOR X TERRY FABRIC QUANTITY: 1 ITEM 004 ANGLADA TUMBLER DOUBLE FOR TERRY TOWEL. QUANTITY: 1 ITEM 005 BRAZZOLI OVERFLOW X SAMPLE 1 TUBE QUANTITY: 1 ITEM 006 OMEZ MACHINE FOR IMPREGNATION TERRY QUANTITY: 1 ITEM 007 POZZI KITCHEN COLOR QUANTITY: 1 ITEM 008 MASTER BM 150 QUANTITY: 1 ITEM 009 MASTER BM 300, KG 490 QUANTITY: 1 ITEM 010 MASTER BM 600 QUANTITY: 1 ITEM 011 DETTIN IDROEXACTOR QUANTITY: 1 ITEM 012 CONE BENDER QUANTITY: 1 STATUS: STILL RUNNING. DELIVERY: AFTER 30 DAYS AFTER ORDER CONFIRMATION DATE Learn More
- T-7966 SANFORIZER, NOMINAL WIDTH 2200mmT-7966 SANFORIZER, NOMINAL WIDTH 2200mm MACHINE HAND: LEFT OR RIGHT HAND WIDTH: 2200mm SPEED (M/MIN): 5~80M/MIN PRESHRINKAGE: 16%, VARIED FROM VARIETY SHRINKING RATE: ≤1% STEAM PRESSURE OF PRESS ROLLER: 0.5MPA DIAMETER OF DRYING CYLINDER OF FELT FINISH: Φ2000mm FELT: ABOUT 2200G/M2 WATER CONSUMPTION (TON /HR): 1 STEAM CONSUMPTION (KG/HR): 500 TRANSMISSION AND CONTROL: PLC CONTROL, PARAMETERS ON LINE DISPLAY IN COLOR TOUCH SCREEN, MULTI-UNIT AC FREQUENCY CONVERSION DRIVE INSTALLED POWER (KW): 38.45 OVERALL DIMENSION (L X W X H): 12010(L) X 4168(W) X 3925(H)mm QUANTITY: 1 SET Learn More
- TT-4374 BACK PRESSURE TURBINE – NEW, 8 MW, 60 HzTT-4374 BACK PRESSURE TURBINE – NEW, 8 MW, 60 Hz STEAM TURBINE GENERATOR 8.0 MW NEW NEVER USED SURPLUS SHIN-NIPPON - ABB ALTERNATOR 8.0 MW - 60 Hz, 13.8 KV, SPEED - 7800 / 1800 RPM INLET PRESSURE - 32 BAR A = 465 PSIG TEMPERATURE - 342 DEG. C. = 647.6 DEF. F. EXHAUST STEAM PRESSURE - 0.12 BAR. A = 1.74 PSIG EXTRACTION STEAM PRESS. - 8 BAR. A = 116.03 PSID WITH ABB - 8.0 MW - BACK-END ALTERNATOR, 1800 RPM, 60 Hz, 13.8 KV Learn More
- TT-6504 HOWDEN 7MW TWIN CONDENSING STEAM TURBINE, YEAR 2018TT-6504 HOWDEN 7MW TWIN CONDENSING STEAM TURBINE, YEAR 2018 1. HOWDEN 7MW TWIN CONDENSING STEAM TURBINE 2. WITH A.C. GENERATOR 3. MODEL TWIN-CA 56 4. BRAND SIEMENS TURBOMACHINERY EQUIPMENT/TD POWER SYSTEMS SERIES SST-110 QUANTITY: 1 Learn More
- YY-3556 4 X 60 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE POWER PLANTYY-3556 4 X 60 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE POWER PLANT HISTORY: THE POWER PLANT CONSISTS OF X 50 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE, ALL OF YEAR: 2011, 7000 HRS SINCE NEW EACH, 3000 RPM, 50 Hz, X 13 MW SIEMENS SST 300 STEAM TURBINE WITH 5000 HOURS EACH. PLANT WAS COMMISSIONED AND PUT INTO OPERATION IN 2012. QUNATITY: 1 Learn More
- TT-6338 COMPLETE PULP MILL SOLD IN SECTIONS-PARTS, CAPACITY 350,000 TPYTT-6338 COMPLETE PULP MILL SOLD IN SECTIONS-PARTS, CAPACITY 350,000 TPY 1. IN GOOD WORKING CONDITION 2. STOPPED 2023 3. EQUIPMENT NOT AVAILABLE FOR LONG 4. COMPLETE PULP MILL. Learn More
- M-5342 USED SOCK MACHINERY FOR SALEREFERENCE NUMBER: M-5342 (220KYDTHH1) L USED SOCK MACHINERY FOR SALE Learn More
- YY-3186 82MW (ROLLS ROYCE TRENT 60 +SST600) CCPP FOR SALE (50Hz)YY-3186 82MW (ROLLS ROYCE TRENT 60 +SST600) CCPP FOR SALE (50Hz) AN UNUSED 82MW ISO RATED COMBINED CYCLE POWER PLANT. THE PLANT’S MAIN EQUIPMENT IS COMPOSED OF A ROLLS ROYCE TRENT 60 DLE GAS TURBINE (ALSO KNOWN AS THE SGT-A65), A NOOTER/ERIKSEN HRSG, AND A SIEMENS SST-300 STEAM TURBINE. QUANTITY: 1 Learn More