- TT-7760 GE MODEL 7EA 62,480 KW BASE RATED, 80,000 KW ISO RATED, COMBUSTION TURBINE GENERATOR SET, 60 Hz, YEAR 2007TT-7760 GE MODEL 7EA 62,480 KW BASE RATED, 80,000 KW ISO RATED, COMBUSTION TURBINE GENERATOR SET, 60 Hz, YEAR 2007 SCOPE OF SUPPLY 1. HP/LP STEAM DRUMS 2. HEAT TRANSFORMER MODULES 3. DEAERATOR SYSTEM 4. DUCT BURNER SYSTEM 5. ISOLATION, VENT & DRAIN VALVES 6. HP/LP FLOW ELEMENTS 7. LADDERS AND WALKWAYS 8. FIELD ASSEMBLY FITTINGS 9. EXCLUDED 10. EMISSIONS CONTROL 11. BOILER FEED WATER PUMP 12. EXHAUST STACK 13. TRANSITION DUCTS QUANTITY: 1 Learn More
- YY-3149 420 MW COMBINED CYCLE POWER PLANTYY-3149 420 MW COMBINED CYCLE POWER PLANT 1 NO. - 420 MW SIEMENS ELECTRIC (2009/10), COMBINED CYCLE COMPLETE POWER PLANT, HAVING THE FOLLOWING TECHNICAL SPECIFICATIONS: Learn More
- J-4753 GE FRAME 9E GAS TURBINE GENERATOR UNITS, 109.49 MWJ-4753 GE FRAME 9E GAS TURBINE GENERATOR UNITS, 109.49 MW TWO UNITS OF FRAME 9E GAS TURBINE GENERATOR UNITS (CONSISTING OF AUXILIARY COMPARTMENT, TURBINE COMPARTMENT, GENERATOR COMPARTMENT) TWO UNITS OF MARK V CONTROL SYSTEM 1 UNIT OF GE STEAM TURBINE GENERATOR UNIT (118.26 MW) (CONSISTING OF AUXILIARY COMPARTMENT, STEAM TURBINE COMPARTMENT, GENERATOR COMPARTMENT) YEAR: 1992 Learn More
- YY-3438 SIEMENS BACKUP PRESSURE STEAM TURBINE, 10 MW, YEAR 2007YY-3438 SIEMENS BACKUP PRESSURE STEAM TURBINE, 10 MW, YEAR 2007 USED 10 MW SIEMENS BACKUP PRESSURE STEAM TURBINE. QUANTITY: 1 Learn More
- TT-5150 ALSTOM GAS TURBINE WITH GENERATOR, 300MW, 50 HzTT-5150 ALSTOM GAS TURBINE WITH GENERATOR, 300MW, 50 Hz 300 MW GAS TURBINE 50 Hz GAS TURBINE WITH GENERATOR GEARBOX: GT13E2, DUAL FUEL, 5 ALSTOM STAGE, 148.85MW GENERATOR: 50WY21Z-078 WITH STATIC EXCITATION ALSTOM/ZUILEMAE RB FUEL GAS STARTING SYSTEM ALSTOM/ALLWEILER LUBRICATION SYSTEM GTEXHAUST ALSTOM DUCT+DAMPER ALSTOM STACK ALSTOM CO2 FLOODING: 56 CYLINDERS, 28 GINGEKERR SYSTEM: STANDBY Learn More
- TT-5533 GENERAL ELECTRIC GAS TURBINE, LM6000PA, 43MW, YEAR 1993 TO 1995, 50HzTT-5533 GENERAL ELECTRIC GAS TURBINE, LM6000PA, 43MW, YEAR 1993 TO 1995, 50Hz Learn More
- TT-2791 SIEMENS SST-400 STEAM TURBINE, 30MW, 10500V, 50HzTT-2791 SIEMENS SST-400 STEAM TURBINE, 30MW, 10500V, 50Hz QUANTITY: 1 Learn More
- M-4798 POWER PLANT 35,000KW YEAR 2008REFERENCE NUMBER: M-4798 (1111BBTLXX10) L POWER PLANT 35,000KW YEAR 2008 POWER PLANT, 35,000KW INCLUDES GENERAL ELECTRIC CONDENSING STEAM TURBINE BRUSH SYNCHRONOUS GENERATOR AIR COOLED CONDENSER SWITCHGEAR TRANSFORMERS CRANE & BUILDING YEAR 2008, UNUSED, 1 LOT QUANTITY AVAILABLE: 1 Learn More
- K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983
K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983
COAL FIRED STEAM POWER PLANT 330 MW
PLANT FOR RELOCATION
EQUIPMENT AND AUXILIARIES IN EXCELLENT CONDITIONSUMMARY OF MAIN ADVANTAGES:
THE STEAM PLANT IS AVAILABLE NOW AND CAN BE REINSTALLED IN SHORT TIME
POWER AVAILABLE IN SHORT TIME
THE EQUIPMENT IS OFFERED AT ATTRACTIVE CONDITIONS
LOW INVESTMENT COST
THE MAIN EQUIPMENT IS BASED ON STATE OF THE ART DESIGN & EMISSION CONTROL
COMMERCIAL LIFE TIME FOR MANY YEARS TO COME
RELOCATION IN COOPERATION WITH OEM SUPERVISING AND GUARANTEES OVERALL CONCEPTTECHNICAL DATA OF BOILER:
OEM
STEAM OUTPUT DESIGN PRESSURE LIVE STEAM REHEAT TEMP FUEL980 T/H
203 BAR
184 BAR / GRAD CBROWN COAL, APPROXIMATELY 9,000 KJ/KG
HARD COAL POSSIBLE AS WELL (24,000 - 28,000 KJ/KG)CONSUMPTION APPROXIMATELY 280 T/H AT FULL LOAD WITH BROWN COAL
APPROXIMATELY 110 T/H AT FULL LOAD WITH HARD COALGRINDING MILLS: 6
EMISSION SO2 200 MG/NM3 X 200 MG/NM3 ASHES 50 MG/NM3 EXHAUST TEMP 70°C
TECHNICAL DATA STEAM TURBINE:
OEM
OUTPUT
LIVE STEAM: 330/345 MW, 177.5 BAR, 535°CGENERAL REMARKS:
PLANT HAS GONE IN COMMERCIAL OPERATION IN 1983
PLANT AND EQUIPMENT HAS BEEN IN OPERATION BASICALLY DURING THE WINTER PERIOD AND HAS 84,300 HOURS ACCUMULATED ONLY
ALL EQUIPMENT IS IN EXCELLENT CONDITION AND PROFESSIONALLY PRESERVEDENTIRE PLANT WITH ALL AUXILIARIES IS AVAILABLE FOR RELOCATION
SCOPE AND CONDITIONS:
DISASSEMBLED, PACKED, AND SHIPPED OR TURNKEY SOLUTION CAN BE NEGOTIATED
RELOCATION WILL BE INCOORDINATION WITH THE OEM WHO IS WILLING TO GIVE A CERTAIN LEVEL OF GUARANTEE FOR THE RELOCATED PLANTQUANTITY: 1