Search results for: 'gas comp'
- Related search terms
- Complete+ca
- compo',))
- compr
- Gas
- GAS V
- TT-6648 NATURAL GAS COGENERATION PLANT, 40 MEGAWATTSTT-6648 NATURAL GAS COGENERATION PLANT, 40 MEGAWATTS Learn More
- TT-5695 SOLAR GAS TURBINE TAURUS 65 SOLONOX, 6300KWE, YEAR 2022, 50 HzTT-5695 SOLAR GAS TURBINE TAURUS 65 SOLONOX, 6300KWE, YEAR 2022, 50 Hz SOLAR GAS TURBINE TAURUS 65 SOLONOX BRAND: SOLAR TURBINES MODEL: SOLAR TAURUS CONDITION: USED YEAR: 2022 QUANTITY: 1 Learn More
- TT-5185 MAN E3262LE212 GAS-ENGINE, WIDTH 1243mm, YEAR 2024TT-5185 MAN E3262LE212 GAS-ENGINE, WIDTH 1243mm, YEAR 2024 CONDITION: NEW MACHINE TYPE: GAS-ENGINE MAN E3262LE212 BRAND: MAN MODEL: E3262LE212 YEAR OF CONSTRUCTION: 2024 CONDITION: NEW Learn More
- R-3250 GIESEN COFFEE ROASTER AND SELKIRK OXIDIZER - 15 KILOS
R-3250 GIESEN COFFEE ROASTER AND SELKIRK OXIDIZER - 15 KILOS
AN EXCEPTIONAL OPPORTUNITY FOR READY TO BE DELIVERED/INSTALLED EQUIPMENT CREATED BY A CHANGED BUSINESS MODEL.
GIESEN W15A
DOUBLE EXHAUST/ROAST PROFILE SYSTEM
NATURAL GAS
240V/60 HZ
COLOR: RED
AVAILABLE WITH SELKIRK TO-2CS321 THERMAL OXIDIZER (USED)GIESEN BROCHURE
SPECIFICATIONS:
GIESEN W15A
CAPACITY: 500 GRAM - 15 KG GREEN BEANS / PER BATCH / M. 60 KG/H
DRIVES: DIRECT FREQUENCY DRIVE MOTOR. ADJUSTABLE DRUM SPEED CONTROL AND ADJUSTABLE ROAST FAN SPEED CONTROL.
ROAST DRUM: DIGITAL PRESSION CONTROL. CAST IRON DRUM WITH HIGH PERFORMANCE BEARINGS.
HEATING SYSTEM: GAS BURNER BY PROPANE GAS (LPG, BOTTLE GAS) OR CITY GAS.
VOLTAGE: 1 PHASE 230V / 50-60 HZ
PAINTING: FREE CHOICE AND CUSTOMIZED / RAL CODES
ROAST ROOF: FREE CHOICE AND CUSTOMIZED
DIMENSIONS: LENGTH 1900mm X WIDTH 962mm X HEIGHT 2000mm
EXHAUST PIPE: EXHAUST PIPE DIAMETER FOR ROAST AIR: ∅ 200mmTHERMAL OXIDIZER FOR GIESEN W15 ROASTER
SELKIRK SPECIALIZES IN THERMAL AFTERBURNERS FOR COFFEE ROASTING MACHINES FROM 10 TO 120 KGS PER BATCH. AFTERBURNERS ARE DESIGNED OF QUALITY MATERIALS FOR LONG SERVICE LIFE. INTEGRATED EFFICIENT GAS BURNERS WHICH REDUCE OPERATING COSTS. BURNER CONFORMS TO UL 295 STANDARD FOR COMMERCIAL/INDUSTRIAL GAS BURNERS. AFTERBURNER DESIGN PROVIDES LONG RETENTION TIMES TO ELIMINATE SMOKE AND ODORS FROM THE ROASTING PROCESS. STANDARD AFTERBURNER OPERATING TEMPERATURE IS 1250 F, BUT CAN EASILY BE ADJUSTED TO MEET LOCAL AIR QUALITY REQUIREMENTS. GAS BURNER IS COMPLETELY SELF MODULATING, AND OPERATOR CONTROLS ARE DESIGNED FOR EASE OF USE.OXIDIZER SPECIFICATIONS:
TO-2CS321 THERMAL OXIDIZER WITH THE FOLLOWING DESIGN FEATURES:
WAYNE COMBUSTION LC 1500 BURNER WITH 1.5 MILLION BTU PER HOUR MAXIMUM INPUT.
DUNGS MULTIBLOC SAFETY VALVE MBC VEF 2500.
DUNGS LOW AND HIGH GAS PRESSURE SWITCHES.
SIEMENS LME SERIES FLAME SAFETY CONTROLLER.
FLAME SENSING ROD FOR FLAME VERIFICATION.
FULLY MODULATING TO MODULATE AT PRE-SET OPERATING TEMPERATURE;
BURNER AND CONTROLS CONFORM TO UL 295 STANDARD FOR COMMERCIAL INDUSTRIAL GAS HEATING EQUIPMENT.
OPERATOR FRIENDLY CONTROL SYSTEM.
TO-2CS321 DIMENSIONS:
OUTSIDE DIAMETER: 36"
OVERALL HEIGHT FROM FLOOR: 82"
INLET DIAMETER: 6"
OUTLET DIAMETER: 10"
EXTERIOR TO BE POWDERCOATED CARBON STEEL MATTE BLACK (OPTIONAL COLORS AVAILABLE).
4" OF HIGH DENSITY CERAMIC INSULATION BETWEEN INTERIOR AND EXTERIOR SURFACES.QUANTITY: 1
Learn More - TT-8253 MWM 2032V16, 4.2 MW EACH, NATURAL GAS, YEAR 2009, 50HzTT-8253 MWM 2032V16, 4.2 MW EACH, NATURAL GAS, YEAR 2009, 50Hz 1. BRAND: MWM 2. MODEL: 2032V16 3. FUEL: NATURAL GAS 4. YEAR OF CONSTRUCTION: 2009 5. OPERATING HOURS: 41,600 (AVERAGE) 6. MAJOR OVERHAUL E60: 2015 (AT AVERAGE 33.600 HOURS) 7. MOTHBALLED: 2019 8. ALTERNATOR: AVK 9. FREQUENCY: 50Hz 10. VOLTAGE: 11 KV QUANTITY: 14 Learn More
- TT-2295 GAS POWERED MICROGENERATOR 35 KW, GAS, YEAR 2018TT-2295 GAS POWERED MICROGENERATOR 35 KW, GAS, YEAR 2018 TEDOM MODEL MICRO T35AP TEDOM MODEL MICRO T35AP - LPG GAS YEAR 2018 GAS-POWERED MICRO COGENERATION UNIT ALSO KNOWN AS A COMBINED HEAT AND POWER (CHP) UNIT IT IS DESIGNED TO GENERATE HEAT AND ELECTRICITY FROM LPG (LIQUIFIED PETROLEUM GAS QUANTITY: 5 Learn More
- V-1041 AIRLAY- FELT LINE 2400mmINDEX 1. Technical specification pag.2 2. Line composition pag.3 3. Machines description pag.4 4. Total price of the turn-key plant pag.25 5. Sale terms pag.26 6. Payment terms pag.28 7. General selling terms and conditions pag.29 Learn More
- TT-7267 SOLAR MARS GAS TURBINE ENGINETT-7267 SOLAR MARS GAS TURBINE ENGINE 1. GAS TURBINE ENGINE 2. SOLAR MARS 3. HOT END DRIVE 4. ENGINE RATING: 15000 5. ENGINE SERVICEABLE: YES Learn More
- T-7018 LINE FOR PRODUCING 70 TO 150 DENIER FROM RECYCLED BOTTLEST-7018 LINE FOR PRODUCING 70 TO 150 DENIER FROM RECYCLED BOTTLES EXTRUDER Φ 160/25 PRODUCT TYPE PET-POY END/POSITION 12 ENDS POSITIONS 24 POSITIONS POSITION/SPINNING BEAM 2 POSITIONS/SPINNING BEAM POSITION DISTANCE (mm) 1500mm SPINNING PACK CYLINDER TYPE, BOTTOM MOUNTED SPINNERET DIAMETER (mm) Φ 90mm CROSS BLOWING AREA 1430mm X 1380mm GEAR PUMP SPECIFICATIONS (CC/REV) 12X3.0CC/REV GEAR PUMP QUANTITY/POSITION 1 OIL PUMP SPECIFICATION (CC/REV) 12X0.12CC/REV OIL PUMP QUANTITY/ POSITION 1 DOWTHERM BOILER/LINE 600L/65KW GUIDE ROLLER SYSTEM (DIAMETER X WIDTH) 160mm X 160mm MIGRATION JET AWA. JAPAN WINDER TWA1800-12ENDS Learn More