Search results for: 'gas t'
-
TT-6573 SIEMENS GAS TURBINE SGT600DLE, 25MW, YEAR 2011, 60HzTT-6573 SIEMENS GAS TURBINE SGT600DLE, 25MW, YEAR 2011, 60Hz 1. SIEMENS GAS TURBINE 2. MODEL: SGT600DLE 3. DUAL SHAFTS 4. EMISSION TYPE: DLE (DRY LOW EMISSION) 5. MADE IN SEWDEN QUANTITY: 1 Learn More -
TT-6412 SOLAR TITAN 130 GAS TURBINE GENERATOR SET, YEAR 2012, 50/60 HzTT-6412 SOLAR TITAN 130 GAS TURBINE GENERATOR SET, YEAR 2012, 50/60 Hz 1. SOLAR TITAN T-130 GAS TURBINE GENERATION PACKAGE 2. BRAND SOLAR 3. YEAR 2012 4. 60 Hz (CAN CONVERT TO 50 Hz) QUANTITY: 1 Learn More -
TT-2734 STEIN THERMOFIN MODEL TFF 4019 CONTINUOUS FRYER, WIDTH 42 INCHES, GAS FIREDTT-2734 STEIN THERMOFIN MODEL TFF 4019 CONTINUOUS FRYER, WIDTH 42 INCHES, GAS FIRED STEIN THERMOFIN MODEL TFF 4019 FRYER INDIRECT NATURAL GAS FIRED ALL STAINLESS STEEL USED CONTINUOUS IN STOCK IN AS-IS CONDITION AVAILABLE FOR IMMEDIATE SHIPMENT QUANTITY: 1 Learn More -
M-2042 WISCONSIN OVEN GAS FIRED BATCH OVEN FOR TEMPERING MATTRESS INNERSPRINGSREFERENCE NUMBER: M-2042 (770IDFGXX6) WISCONSIN OVEN GAS FIRED BATCH OVEN FOR TEMPERING MATTRESS INNERSPRINGS GAS FIRED BATCH OVEN MANUFACTURER: WISCONSIN OVEN STILL ASSEMBLED TODAY OVEN WILL BE USED FOR TEMPERING STEEL SPRING ASSEMBLIES WITH A LOADING OF APPROXIMATELY 50 ASSEMBLIES WEIGHING APPROXIMATELY 40 POUNDS, IN THE OVEN AT A TIME THE SIZE IS BASED ON APPROXIMATELY 4 TO 5 CYCLES PER HOUR PROVIDING THE LOADING AND UNLOADING IS ACCOMPLISHED PROMPTLY THE HEATING RATE IS BASED ON A HEATING CYCLE OF APPROXIMATELY 12 MINUTES PER CYCLE THE OVEN WILL INCLUDE, BUT NOT BE LIMITED TO, THE DEISNG FEATURES OUTLINED IN OUR SPECIFICATIONS LISTED BELOW FURTHER MODIFICATIONS AND DESIGN CHANGES MAY BE INCORPORATED AT THE FINAL ENGINEERING STAGES TO PRODUCE THE BEST EQUIPMENT POSSIBLE QUANTITY AVAILABLE: 1 Learn More -
TT-7803 SIEMENS 251B12 GAS TURBINE GENERATOR SET, 46 MW, DUAL FUEL, 13.8 KV/3/60 HzTT-7803 SIEMENS 251B12 GAS TURBINE GENERATOR SET, 46 MW, DUAL FUEL, 13.8 KV/3/60 Hz 1. BRAND: SIEMENS 2. TYPE: GAS TURBINES 3. CONDITION USED QUANTITY: 3 Learn More -
YY-2907 LM2500 PLUS PK- MDWG03 GAS TURBINE-GENERATOR PACKAGES, YEAR 2002, QUANTITY 2, 30 MW, 11 KV, 50 HzYY-2907 LM2500 PLUS PK- MDWG03 GAS TURBINE-GENERATOR PACKAGES, YEAR 2002, QUANTITY 2, 30 MW, 11 KV, 50 Hz YEAR OF MANUFACTURE: 2002 YEAR COMMISSIONED: 2005 OPERATING HOURS: 55,000 HOURS AFTER LAST MO: ~5,000 ONLY STATUS: ON FOUNDATION FUEL: NATURAL GAS & LIQUID FUEL QUANTITY: 2 Learn More -
YY-2654 SIMPLE CYCLED SGT600 GAS TURBINE POWER PLANT, 7 UNITSYY-2654 SIMPLE CYCLED SGT600 GAS TURBINE POWER PLANT, 7 UNITS BRAND NEW FROM 2021/2022 POWER OUTPUT 24.5 MW FUEL: DUAL FUEL ( NATURAL GAS AND LIQUID FUEL) FREQUENCY: 50/60 Hz ASK FOR MORE DETAILS! Learn More -
TT-1764 GE GAS TURBINE 6-6FA, 50HzTT-1764 GE GAS TURBINE 6-6FA, 50Hz FUEL: GAS QUANTITY: 1 Learn More -
TT-5533 GENERAL ELECTRIC GAS TURBINE, LM6000PA, 43MW, YEAR 1993 TO 1995, 50HzTT-5533 GENERAL ELECTRIC GAS TURBINE, LM6000PA, 43MW, YEAR 1993 TO 1995, 50Hz Learn More -
YY-3513 SIEMENS SGT-600 GAS TURBINES, 24.5 MW EACH, 1.500 RPM, 9 TURBINESYY-3513 SIEMENS SGT-600 GAS TURBINES, 24.5 MW EACH, 1.500 RPM, 9 TURBINES SIEMENS SGT-600 GAS TURBINES (AS-IS, WHERE-IS BASIS) POWER OUTPUT: 24.5 MW EACH FREQUENCY: 50 Hz VOLTAGE: 11 KV RPM: 1.500 RPM QUANTITY: 9 Learn More