Search results for: 'turbine plant'
- Related search terms
- plant
- turbine v
- turbine T
- turbine genera
- turbine generat
-
TT-7913 SIEMENS SST-300 COMPLETE STEAM POWER GENERATOR, 20.29 MW, YEAR 2021, 50HzTT-7913 SIEMENS SST-300 COMPLETE STEAM POWER GENERATOR, 20.29 MW, YEAR 2021, 50Hz 1. UNPACKED - STILL BOXED AND CRATED - COMPLETE PLANT 2. NEW UNUSED 3. MODEL: SIEMENS SST-300 4. YEAR OF MANUFACTURE: 2021 Learn More -
TT-4988 COGENERATION POWER PLANT, 80MW, YEAR 2009TT-4988 COGENERATION POWER PLANT, 80MW, YEAR 2009 QUANTITY: 1 Learn More -
K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006
COAL FIRED STEAM TURBINE POWER PLANT
300MW
COAL OIL GAS
BIOMASS FIRED
OUTPUT: 600 MW
180 BAR
540°C
MANUFCATURER/TYPE: BBC-ABB
YEAR: 2006
ONLY 13,300 AND 45,000 RUNNING HOURS AFTER MAJOR OVERHAULALTERNATOR ACEC TC 1498
COOLING: HYDROGEN 22 KV 3000 TR 1550 KVA
MAIN TRAFO: WESTINGHOUSE 375 MVA 156/22 KV
COUPLE TRAFO: ALSTHOM 20 MVA 22/6.4 KV
START TRAFO: ALSTHOM 20 MVA 71.5/6.4 KVFUELPUMPS: ID:3 / HD:3 LD:2881/HD:2223
16 BURNERS TANGENIALGASBURNERS: TANGENIAL 16 PCS 5000 NM3
COAL GRINDING MILLS:
(4) LOESCHE LM 19.20D
25 T/HR(2) LOESCHE LM 20.20D
35 T/HRBIOMASS POWER GENERATION BY CFB (CIRCULATING FLUIDIZED BED) BOILER 20 MWe FIRED BY WOOD DERIVED WASTES CUT INTO CHIPS. COMPLETE SAWDUST INSTALLATION.
UNIT 1
172,000 HOURS, OVERHAULED IN 2006
NEW ROTOR (HD, MD, LD)
ONLY 13,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN APRIL 2011 ONLY 408 HOURS UNTIL NOW!UNIT 2
265,000 HOURS, OVERHAULED IN 2006 (HD, MD, LD)
45,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN NOVEMBER 2011 ONLY 13,300 HOURS UNTIL NOW!
189 KG/CM2, 540˚C, 3000 T/MINPLANT ORIGINALLY FROM THW 1970’S BUT RENEWED IN 2006
STILL INSTALLED
IMMEDIATE DISMANTLING POSSIBLE
BOILER INTAKE CAPACITY: 3500 T/H
NEW PLCQUANTITY: 2
Learn More -
TT-8654 SIEMENS SGT 5/6-2000E (94.2) POWER GENERATION, 498 MW, GAS FIRED, 60 HzTT-8654 SIEMENS SGT 5/6-2000E (94.2) POWER GENERATION, 498 MW, GAS FIRED, 60 Hz 1. POWER GENERATION 498 MW TOTAL 2. GAS FIRED 3. FREQUENCY (60 Hz) 4. MODEL: SIEMENS SGT5/6-2000E (VERSION 94.2) 5. OUTPUT: 166 MW PER UNIT (BASE LOAD) 6. CONFIGURATION: SIMPLE CYCLE; CONVERTIBLE TO COMBINED CYCLE OR CHP 7. FUEL: NATURAL GAS (OTHER FUELS POSSIBLE WITH MODIFICATION) 8. CONDITION: BRAND NEW, NEVER USED, ZERO HOURS 9. SERVICEABILITY: FULL SIEMENS OEM SUPPORT, GLOBAL SPARES AVAILABILITY, ROBUST INSTALLED BASE (SEPARATELY QUOTED SERVICE) QUANTITY: 3 Learn More -
TT-8285 POWER BARGE, 16.2MW EACH (TOTAL 120MW), YEAR 1998, 50HzTT-8285 POWER BARGE, 16.2MW EACH (TOTAL 120MW), YEAR 1998, 50Hz TECHNICAL DETAILS LIKE LENGTH, WIDTH, DEPTH OF THE BARGE: L= 96540mm, B= 30480mm DEPTH = 6090mm YEAR OF BUILT: 1998 SINGLE BARGE: YES Learn More -
YY-3490 USED GE LM2500 GAS TURBINES, 6 UNITSYY-3490 USED GE LM2500 GAS TURBINES, 6 UNITS 1. STATUS: AVAILABLE 2. BRAND: GE 3. MODEL: LM2500 4. CONDITION: USED 5. WATTAGE: 18.64 MW 6. FUEL: LIQUID FUEL QUANTITY: 6 UNITS Learn More -
TT-6852 COMPLETE ROLLS-ROYCE POWER PLANT, 66MW, NATURAL GAS, YEAR 2008, 50HzTT-6852 COMPLETE ROLLS-ROYCE POWER PLANT, 66MW, NATURAL GAS, YEAR 2008, 50Hz 1. ROLLS-ROYCE TURBINES 2. TRENT60 3. YEAR: 2008 4. TOTAL HOURS: 20000 5. 10.5KV QUANTITY: 1 Learn More -
TT-6553 SIEMENS SST 400 BIOMASS POWER PLANT - NEW, 30 MW, YEAR 2012, 50 HzTT-6553 SIEMENS SST 400 BIOMASS POWER PLANT - NEW, 30 MW, YEAR 2012, 50 Hz 1. BRAND: SIEMENS TURBINES 2. MODEL: SIEMENS SST400 3. CONDITION: NEW QUANTITY: 1 Learn More -
TT-6552 WELLONS BIOMASS POWER PLANT BOILERS, 300 HP, 450 PSI, YEAR 2012TT-6552 WELLONS BIOMASS POWER PLANT BOILERS, 300 HP, 450 PSI, YEAR 2012 1. BRAND: WELLONS POWER PLANTS 2. CONDITION: USED 3. YEAR: 2012 QUANTITY: 2 Learn More -
TT-4060 GENERAL ELECTRIC LM2500 SAC COMPLETE POWER PLANT AND BOILER, 22MW, YEAR 2022, 5000 HOURSTT-4060 GENERAL ELECTRIC LM2500 SAC COMPLETE POWER PLANT AND BOILER, 22MW, YEAR 2022, 5000 HOURS LM2500 SINGLE SHANK 22MW QUANTITY: 1 Learn More